Lamar County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects23
Total capacity5,988MW
Signed agreements15of 23
New since August0requests

23 proposed energy projects from ERCOT's September 2026 report, plus who to call in Lamar County and in TCEQ Region 5 before signing a solar, wind, or battery storage lease.

Check land in Lamar CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Lamar County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Lamar County?

ERCOT's September 2026 interconnection report lists 23 proposed energy projects in Lamar County (13 solar, 1 wind, 7 battery storage and 2 gas), about 5,988 MW in all. 15 of the 23 have a signed interconnection agreement, and 8 have been approved for energization or synchronization. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.

What stands out in Lamar County

By capacity, solar leads in Lamar County with 3,029 MW across 13 projects, followed by other (1 project, 1,232 MW) and battery storage (7 projects, 851 MW); 2 self-limiting projects (reported at 0 MW because the resource limits its own output) are listed without a capacity. The largest single project is Southeast Oklahoma Pumped Storage, a 1,232 MW wat project listed under Apex Energy Solutions, LLC, still in study, and its target online date is Jan 2030. Of the 23, 8 are still in ERCOT's study process, 3 have a signed interconnection agreement but no security posted yet, 4 have posted security or started construction and 8 are approved for energization or synchronization. Connection points are mostly at 345 kV (14 projects) and 138 kV (8 projects) (why the voltage matters). The single most-used connection point is tap both 345kV 1685 FarmersVl - 1695 Moses ckts, shared by 3 projects. BR Solar, LLC, Mud Cat Solar, LLC and Roxton Solar, LLC are each listed on 2 projects; 20 different companies appear in all. Target online dates for the projects not yet running span Jun 2027 to Aug 2030. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
MRG GOODY SOLARTap 138 kV Toco Switch (#1700) – Paris Switch (#1693) · shared with 1 other requestMRG GOODY SOLAR PROJECT, LLCSolar170.8Aug 2026Approved for synchronization
MRG Goody StorageTap 138 kV Toco Switch (#1700) – Paris Switch (#1693) · shared with 1 other requestMRG Goody Solar Project LLCBattery storage52.3Aug 2026Approved for synchronization
Baker Branch Solartap 345kV 1692 Paris - 1690 ValleyMockingbird Solar Center, LLCSolar469.4Sep 2026Approved for synchronization
Delilah Solar 1tap both 345kV 1685 FarmersVl - 1695 Moses ckts · shared with 2 other requestsDelilah Solar Energy LLCSolar300.0Dec 2026Approved for synchronization
Delilah Solar 2345 kV TTRSW 11688 · shared with 1 other requestDelilah Solar Energy II LLCSolar317.6Dec 2026Approved for synchronization
Samson Solar 1tap both 345kV 1685 FarmersVl - 1695 Moses ckts · shared with 2 other requestsSamson Solar Energy LLCSolar250.0Dec 2026Approved for synchronization
Samson Solar 2345 kV TTRSW 11688 · shared with 1 other requestSamson Solar Energy II LLCSolar203.0Dec 2026Approved for synchronization
Samson Solar 3tap both 345kV 1685 FarmersVl - 1695 Moses ckts · shared with 2 other requestsSamson Solar Energy III LLCSolar250.0Dec 2026Approved for synchronization
Echols Grove SolarTap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11...Echols Grove, LLCSolar201.6Jun 2027Signed; security posted
Rowdy Creek SolarWoodfin Switch (#1465) 345kVRowdy Creek Solar LLCSolar351.8Dec 2027Signed; security posted
Roxton SolarTap 138 KV Bois Pump (1835) - Brookston (1833) · shared with 1 other requestRoxton Solar, LLCSolar116.8Jul 2028Signed; security posted
Roxton StorageTap 138 KV Bois Pump (1835) - Brookston (1833) · shared with 1 other requestRoxton Solar, LLCBattery storage (paired with solar)102.0Jul 2028Signed; security posted
Star Dairy SolarTap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5 · shared with 1 other requestStar Dairy Solar LLCSolar115.6Jul 2027Signed Dec 2024
Star Dairy StorageTap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5 · shared with 1 other requestStar Dairy StorageBattery storage (paired with solar)205.2Jul 2027Signed Dec 2024
Bug Tussle Wind ProjectTap 1729 Valley South and 1692 ParisBug Tussle Wind, LLCWind396.8Sep 2028Signed Jul 2024
Lamar Unit 1 Repower1692 Paris Switch Station 345kVLa Frontera Holdings, LLCGas combined cycle66.0Dec 2027In study
Arc Energy StorageTap 138kV 1693 Paris Switch - 11806 ENLOE T8Paris Energy Storage, LLCBattery storage (stand-alone)204.5Jun 2028In study
Lan Battery SLFTap 345kV 1729 Valley South – 1692 Paris Switch · shared with 1 other requestBR Solar, LLCBattery storage (paired with solar)Self-limitingAug 2028In study
Lan Solar SLFTap 345kV 1729 Valley South – 1692 Paris Switch · shared with 1 other requestBR Solar, LLCSolar182.2Aug 2028In study
Mud Cat Solar SLFTap 138KV 11768 Hawk Hollow – 1768 DeportMud Cat Solar, LLCSolar100.5Sep 2028In study
Mud Cat Storage SLF11768 Hawk Hollow – 1768 Deport 138kVMud Cat Solar, LLCBattery storage (paired with solar)Self-limitingSep 2028In study
Baker Branch BESSPacific Switch (PACSW) 345 kV Bus 11683Mockingbird Storage Center, LLCBattery storage (paired with solar)287.2Dec 2029In study
Southeast Oklahoma Pumped Storage1692 Paris Switch 345kVApex Energy Solutions, LLCWAT1,232.0Jan 2030In study
North Royal Thermal (TEF- Due Diligence)Tap 345kV 1695 MOSES_5 - 11699 WOODARD_5Invenergy Energy Transition Development LLCGas turbine479.0Aug 2030In study

Crowded connection points in Lamar County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Paris (1692) 345 kV 8 requests · 2,667 MW4 in study, 3 signed, 1 approved for synchronization
  • Baker Branch Solar 23INR0026 · Solar · 469 MW · Approved for synchronization
  • Bug Tussle Wind Project 23INR0441 · Wind · 397 MW · Signed Jul 2024
  • Star Dairy Storage 25INR0334 · Battery storage · 205 MW · Signed Dec 2024
  • Star Dairy Solar 25INR0164 · Solar · 116 MW · Signed Dec 2024
  • Southeast Oklahoma Pumped Storage 30INR0002 · WAT · 1,232 MW · In study
  • Lan Solar SLF 22INR0314 · Solar · 182 MW · In study
  • Lamar Unit 1 Repower 23INR0486 · Gas combined cycle · 66 MW · In study
  • Lan Battery SLF 24INR0262 · Battery storage · 0 MW · In study
Moses Ckts (1695) 345 kV 9 requests · 3,642 MW · 4 in Lamar County, 5 in Franklin, Hopkins4 in study, 3 approved for synchronization, 2 signed; security posted
  • Delilah Solar 1 22INR0202 · Solar · 300 MW · Approved for synchronization
  • Samson Solar 1 21INR0221 · Solar · 250 MW · Approved for synchronization
  • Samson Solar 3 21INR0491 · Solar · 250 MW · Approved for synchronization
  • Lupinus Solar 1 24INR0150 · Solar · 162 MW · Signed; security posted · Franklin
  • Lupinus Storage 1 24INR0153 · Battery storage · 84 MW · Signed; security posted · Franklin
  • Prairie Ridge (Gas - CC) 30INR0071 · Gas combined cycle · 1,660 MW · In study · Franklin
  • North Royal Thermal (TEF- Due Diligence) 28INR0087 · Gas turbine · 479 MW · In study
  • Palomino Solar 29INR0056 · Solar · 301 MW · In study · Hopkins
  • Palomino Storage 29INR0057 · Battery storage · 155 MW · In study · Hopkins
Farmersvl (1685) 345 kV 3 requests · 800 MW3 approved for synchronization
  • Delilah Solar 1 22INR0202 · Solar · 300 MW · Approved for synchronization
  • Samson Solar 1 21INR0221 · Solar · 250 MW · Approved for synchronization
  • Samson Solar 3 21INR0491 · Solar · 250 MW · Approved for synchronization
Valley South (1729) 345 kV 7 requests · 2,365 MW · 3 in Lamar County, 4 in Grayson, Fannin6 in study, 1 signed
  • Bug Tussle Wind Project 23INR0441 · Wind · 397 MW · Signed Jul 2024
  • Black Mountain Fannin Gas 29INR0191 · Gas combined cycle · 991 MW · In study · Fannin
  • White Bright BESS 26INR0605 · Battery storage · 314 MW · In study · Grayson
  • Whitewright Solar 2 26INR0300 · Solar · 302 MW · In study · Grayson
  • Lan Solar SLF 22INR0314 · Solar · 182 MW · In study
  • 2 Cedar Wind 28INR0286 · Wind · 180 MW · In study · Fannin
  • Lan Battery SLF 24INR0262 · Battery storage · 0 MW · In study
Paris (1693) 138 kV 3 requests · 428 MW2 approved for synchronization, 1 in study
  • MRG GOODY SOLAR 23INR0225 · Solar · 171 MW · Approved for synchronization
  • MRG Goody Storage 24INR0305 · Battery storage · 52 MW · Approved for synchronization
  • Arc Energy Storage 26INR0184 · Battery storage · 204 MW · In study
Woodard (11699) 345 kV 6 requests · 2,707 MW · 3 in Lamar County, 3 in Franklin2 signed; security posted, 2 signed, 2 in study
  • Lupinus Solar 1 24INR0150 · Solar · 162 MW · Signed; security posted · Franklin
  • Lupinus Storage 1 24INR0153 · Battery storage · 84 MW · Signed; security posted · Franklin
  • Star Dairy Storage 25INR0334 · Battery storage · 205 MW · Signed Dec 2024
  • Star Dairy Solar 25INR0164 · Solar · 116 MW · Signed Dec 2024
  • Prairie Ridge (Gas - CC) 30INR0071 · Gas combined cycle · 1,660 MW · In study · Franklin
  • North Royal Thermal (TEF- Due Diligence) 28INR0087 · Gas turbine · 479 MW · In study
Hawk Hollow (11768) 138 kV 3 requests · 302 MW2 in study, 1 signed; security posted
  • Echols Grove Solar 25INR0368 · Solar · 202 MW · Signed; security posted
  • Mud Cat Solar SLF 25INR0505 · Solar · 100 MW · In study
  • Mud Cat Storage SLF 25INR0507 · Battery storage · 0 MW · In study
Ttrsw (11688) 345 kV 4 requests · 621 MW · 2 in Lamar County, 2 in Franklin2 approved for synchronization, 2 in study
  • Delilah Solar 2 22INR0203 · Solar · 318 MW · Approved for synchronization
  • Samson Solar 2 21INR0490 · Solar · 203 MW · Approved for synchronization
  • Lazy Frog Solar SLF 25INR0504 · Solar · 100 MW · In study · Franklin
  • Lazy Frog Storage SLF 25INR0506 · Battery storage · 0 MW · In study · Franklin
Bus 1700 (1700) 138 kV 2 requests · 223 MW2 approved for synchronization
  • MRG GOODY SOLAR 23INR0225 · Solar · 171 MW · Approved for synchronization
  • MRG Goody Storage 24INR0305 · Battery storage · 52 MW · Approved for synchronization
Hawk Hollow (1768) 138 kV 4 requests · 355 MW · 2 in Lamar County, 2 in Red River4 in study
  • Silverbell Storage 28INR0124 · Battery storage · 129 MW · In study · Red River
  • Silverbell Solar 28INR0125 · Solar · 126 MW · In study · Red River
  • Mud Cat Solar SLF 25INR0505 · Solar · 100 MW · In study
  • Mud Cat Storage SLF 25INR0507 · Battery storage · 0 MW · In study
Allens Creek (1835) 138 kV 3 requests · 411 MW · 2 in Lamar County, 1 in Fannin2 signed; security posted, 1 in study
  • Roxton Solar 26INR0470 · Solar · 117 MW · Signed; security posted
  • Roxton Storage 26INR0469 · Battery storage · 102 MW · Signed; security posted
  • Steelhead Energy Storage 27INR0145 · Battery storage · 192 MW · In study · Fannin
Bus 1833 (1833) 138 kV 2 requests · 219 MW2 signed; security posted
  • Roxton Solar 26INR0470 · Solar · 117 MW · Signed; security posted
  • Roxton Storage 26INR0469 · Battery storage · 102 MW · Signed; security posted

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Lamar County

  • Lamar County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 5, Tyler: 2916 Teague Dr, Tyler TX 75701-3734, 903-535-5100; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Lamar County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Lamar County.

Permits and reviews for Lamar County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Lamar County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

Recent local action: Lamar County readopted its Guidelines and Criteria for Granting Tax Abatements in Reinvestment Zones on October 14, 2024. The guidelines list a "Renewable Energy Facility" and an "Energy Storage Facility" among the facility types eligible for a Chapter 312 abatement, defined to include wind turbines, photovoltaic solar panels, and batteries. (Lamar County tax abatement guidelines (county website); checked October 17, 2026).

How a project in Lamar County connects to the grid

Lamar County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Lamar County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Lamar County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 5

Anderson · Bowie · Camp · Cass · Cherokee · Delta · Franklin · Gregg · Harrison · Henderson · Hopkins · Marion · Morris · Panola · Rains · Red River · Rusk · Smith · Titus · Upshur · Van Zandt · Wood

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.