Lamar County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
23 proposed energy projects from ERCOT's September 2026 report, plus who to call in Lamar County and in TCEQ Region 5 before signing a solar, wind, or battery storage lease.
Check land in Lamar CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Lamar County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Lamar County?
ERCOT's September 2026 interconnection report lists 23 proposed energy projects in Lamar County (13 solar, 1 wind, 7 battery storage and 2 gas), about 5,988 MW in all. 15 of the 23 have a signed interconnection agreement, and 8 have been approved for energization or synchronization. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.
What stands out in Lamar County
By capacity, solar leads in Lamar County with 3,029 MW across 13 projects, followed by other (1 project, 1,232 MW) and battery storage (7 projects, 851 MW); 2 self-limiting projects (reported at 0 MW because the resource limits its own output) are listed without a capacity. The largest single project is Southeast Oklahoma Pumped Storage, a 1,232 MW wat project listed under Apex Energy Solutions, LLC, still in study, and its target online date is Jan 2030. Of the 23, 8 are still in ERCOT's study process, 3 have a signed interconnection agreement but no security posted yet, 4 have posted security or started construction and 8 are approved for energization or synchronization. Connection points are mostly at 345 kV (14 projects) and 138 kV (8 projects) (why the voltage matters). The single most-used connection point is tap both 345kV 1685 FarmersVl - 1695 Moses ckts, shared by 3 projects. BR Solar, LLC, Mud Cat Solar, LLC and Roxton Solar, LLC are each listed on 2 projects; 20 different companies appear in all. Target online dates for the projects not yet running span Jun 2027 to Aug 2030. All of them fall in ERCOT's North load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| MRG GOODY SOLARTap 138 kV Toco Switch (#1700) – Paris Switch (#1693) · shared with 1 other request | MRG GOODY SOLAR PROJECT, LLC | Solar | 170.8 | Aug 2026 | Approved for synchronization |
| MRG Goody StorageTap 138 kV Toco Switch (#1700) – Paris Switch (#1693) · shared with 1 other request | MRG Goody Solar Project LLC | Battery storage | 52.3 | Aug 2026 | Approved for synchronization |
| Baker Branch Solartap 345kV 1692 Paris - 1690 Valley | Mockingbird Solar Center, LLC | Solar | 469.4 | Sep 2026 | Approved for synchronization |
| Delilah Solar 1tap both 345kV 1685 FarmersVl - 1695 Moses ckts · shared with 2 other requests | Delilah Solar Energy LLC | Solar | 300.0 | Dec 2026 | Approved for synchronization |
| Delilah Solar 2345 kV TTRSW 11688 · shared with 1 other request | Delilah Solar Energy II LLC | Solar | 317.6 | Dec 2026 | Approved for synchronization |
| Samson Solar 1tap both 345kV 1685 FarmersVl - 1695 Moses ckts · shared with 2 other requests | Samson Solar Energy LLC | Solar | 250.0 | Dec 2026 | Approved for synchronization |
| Samson Solar 2345 kV TTRSW 11688 · shared with 1 other request | Samson Solar Energy II LLC | Solar | 203.0 | Dec 2026 | Approved for synchronization |
| Samson Solar 3tap both 345kV 1685 FarmersVl - 1695 Moses ckts · shared with 2 other requests | Samson Solar Energy III LLC | Solar | 250.0 | Dec 2026 | Approved for synchronization |
| Echols Grove SolarTap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11... | Echols Grove, LLC | Solar | 201.6 | Jun 2027 | Signed; security posted |
| Rowdy Creek SolarWoodfin Switch (#1465) 345kV | Rowdy Creek Solar LLC | Solar | 351.8 | Dec 2027 | Signed; security posted |
| Roxton SolarTap 138 KV Bois Pump (1835) - Brookston (1833) · shared with 1 other request | Roxton Solar, LLC | Solar | 116.8 | Jul 2028 | Signed; security posted |
| Roxton StorageTap 138 KV Bois Pump (1835) - Brookston (1833) · shared with 1 other request | Roxton Solar, LLC | Battery storage (paired with solar) | 102.0 | Jul 2028 | Signed; security posted |
| Star Dairy SolarTap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5 · shared with 1 other request | Star Dairy Solar LLC | Solar | 115.6 | Jul 2027 | Signed Dec 2024 |
| Star Dairy StorageTap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5 · shared with 1 other request | Star Dairy Storage | Battery storage (paired with solar) | 205.2 | Jul 2027 | Signed Dec 2024 |
| Bug Tussle Wind ProjectTap 1729 Valley South and 1692 Paris | Bug Tussle Wind, LLC | Wind | 396.8 | Sep 2028 | Signed Jul 2024 |
| Lamar Unit 1 Repower1692 Paris Switch Station 345kV | La Frontera Holdings, LLC | Gas combined cycle | 66.0 | Dec 2027 | In study |
| Arc Energy StorageTap 138kV 1693 Paris Switch - 11806 ENLOE T8 | Paris Energy Storage, LLC | Battery storage (stand-alone) | 204.5 | Jun 2028 | In study |
| Lan Battery SLFTap 345kV 1729 Valley South – 1692 Paris Switch · shared with 1 other request | BR Solar, LLC | Battery storage (paired with solar) | Self-limiting | Aug 2028 | In study |
| Lan Solar SLFTap 345kV 1729 Valley South – 1692 Paris Switch · shared with 1 other request | BR Solar, LLC | Solar | 182.2 | Aug 2028 | In study |
| Mud Cat Solar SLFTap 138KV 11768 Hawk Hollow – 1768 Deport | Mud Cat Solar, LLC | Solar | 100.5 | Sep 2028 | In study |
| Mud Cat Storage SLF11768 Hawk Hollow – 1768 Deport 138kV | Mud Cat Solar, LLC | Battery storage (paired with solar) | Self-limiting | Sep 2028 | In study |
| Baker Branch BESSPacific Switch (PACSW) 345 kV Bus 11683 | Mockingbird Storage Center, LLC | Battery storage (paired with solar) | 287.2 | Dec 2029 | In study |
| Southeast Oklahoma Pumped Storage1692 Paris Switch 345kV | Apex Energy Solutions, LLC | WAT | 1,232.0 | Jan 2030 | In study |
| North Royal Thermal (TEF- Due Diligence)Tap 345kV 1695 MOSES_5 - 11699 WOODARD_5 | Invenergy Energy Transition Development LLC | Gas turbine | 479.0 | Aug 2030 | In study |
Crowded connection points in Lamar County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Paris (1692) 345 kV 8 requests · 2,667 MW4 in study, 3 signed, 1 approved for synchronization
- Baker Branch Solar 23INR0026 · Solar · 469 MW · Approved for synchronization
- Bug Tussle Wind Project 23INR0441 · Wind · 397 MW · Signed Jul 2024
- Star Dairy Storage 25INR0334 · Battery storage · 205 MW · Signed Dec 2024
- Star Dairy Solar 25INR0164 · Solar · 116 MW · Signed Dec 2024
- Southeast Oklahoma Pumped Storage 30INR0002 · WAT · 1,232 MW · In study
- Lan Solar SLF 22INR0314 · Solar · 182 MW · In study
- Lamar Unit 1 Repower 23INR0486 · Gas combined cycle · 66 MW · In study
- Lan Battery SLF 24INR0262 · Battery storage · 0 MW · In study
Moses Ckts (1695) 345 kV 9 requests · 3,642 MW · 4 in Lamar County, 5 in Franklin, Hopkins4 in study, 3 approved for synchronization, 2 signed; security posted
- Delilah Solar 1 22INR0202 · Solar · 300 MW · Approved for synchronization
- Samson Solar 1 21INR0221 · Solar · 250 MW · Approved for synchronization
- Samson Solar 3 21INR0491 · Solar · 250 MW · Approved for synchronization
- Lupinus Solar 1 24INR0150 · Solar · 162 MW · Signed; security posted · Franklin
- Lupinus Storage 1 24INR0153 · Battery storage · 84 MW · Signed; security posted · Franklin
- Prairie Ridge (Gas - CC) 30INR0071 · Gas combined cycle · 1,660 MW · In study · Franklin
- North Royal Thermal (TEF- Due Diligence) 28INR0087 · Gas turbine · 479 MW · In study
- Palomino Solar 29INR0056 · Solar · 301 MW · In study · Hopkins
- Palomino Storage 29INR0057 · Battery storage · 155 MW · In study · Hopkins
Farmersvl (1685) 345 kV 3 requests · 800 MW3 approved for synchronization
- Delilah Solar 1 22INR0202 · Solar · 300 MW · Approved for synchronization
- Samson Solar 1 21INR0221 · Solar · 250 MW · Approved for synchronization
- Samson Solar 3 21INR0491 · Solar · 250 MW · Approved for synchronization
Valley South (1729) 345 kV 7 requests · 2,365 MW · 3 in Lamar County, 4 in Grayson, Fannin6 in study, 1 signed
- Bug Tussle Wind Project 23INR0441 · Wind · 397 MW · Signed Jul 2024
- Black Mountain Fannin Gas 29INR0191 · Gas combined cycle · 991 MW · In study · Fannin
- White Bright BESS 26INR0605 · Battery storage · 314 MW · In study · Grayson
- Whitewright Solar 2 26INR0300 · Solar · 302 MW · In study · Grayson
- Lan Solar SLF 22INR0314 · Solar · 182 MW · In study
- 2 Cedar Wind 28INR0286 · Wind · 180 MW · In study · Fannin
- Lan Battery SLF 24INR0262 · Battery storage · 0 MW · In study
Paris (1693) 138 kV 3 requests · 428 MW2 approved for synchronization, 1 in study
- MRG GOODY SOLAR 23INR0225 · Solar · 171 MW · Approved for synchronization
- MRG Goody Storage 24INR0305 · Battery storage · 52 MW · Approved for synchronization
- Arc Energy Storage 26INR0184 · Battery storage · 204 MW · In study
Woodard (11699) 345 kV 6 requests · 2,707 MW · 3 in Lamar County, 3 in Franklin2 signed; security posted, 2 signed, 2 in study
- Lupinus Solar 1 24INR0150 · Solar · 162 MW · Signed; security posted · Franklin
- Lupinus Storage 1 24INR0153 · Battery storage · 84 MW · Signed; security posted · Franklin
- Star Dairy Storage 25INR0334 · Battery storage · 205 MW · Signed Dec 2024
- Star Dairy Solar 25INR0164 · Solar · 116 MW · Signed Dec 2024
- Prairie Ridge (Gas - CC) 30INR0071 · Gas combined cycle · 1,660 MW · In study · Franklin
- North Royal Thermal (TEF- Due Diligence) 28INR0087 · Gas turbine · 479 MW · In study
Hawk Hollow (11768) 138 kV 3 requests · 302 MW2 in study, 1 signed; security posted
- Echols Grove Solar 25INR0368 · Solar · 202 MW · Signed; security posted
- Mud Cat Solar SLF 25INR0505 · Solar · 100 MW · In study
- Mud Cat Storage SLF 25INR0507 · Battery storage · 0 MW · In study
Ttrsw (11688) 345 kV 4 requests · 621 MW · 2 in Lamar County, 2 in Franklin2 approved for synchronization, 2 in study
Bus 1700 (1700) 138 kV 2 requests · 223 MW2 approved for synchronization
- MRG GOODY SOLAR 23INR0225 · Solar · 171 MW · Approved for synchronization
- MRG Goody Storage 24INR0305 · Battery storage · 52 MW · Approved for synchronization
Hawk Hollow (1768) 138 kV 4 requests · 355 MW · 2 in Lamar County, 2 in Red River4 in study
Allens Creek (1835) 138 kV 3 requests · 411 MW · 2 in Lamar County, 1 in Fannin2 signed; security posted, 1 in study
- Roxton Solar 26INR0470 · Solar · 117 MW · Signed; security posted
- Roxton Storage 26INR0469 · Battery storage · 102 MW · Signed; security posted
- Steelhead Energy Storage 27INR0145 · Battery storage · 192 MW · In study · Fannin
Bus 1833 (1833) 138 kV 2 requests · 219 MW2 signed; security posted
- Roxton Solar 26INR0470 · Solar · 117 MW · Signed; security posted
- Roxton Storage 26INR0469 · Battery storage · 102 MW · Signed; security posted
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Lamar County
- Lamar County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 5, Tyler: 2916 Teague Dr, Tyler TX 75701-3734, 903-535-5100; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Lamar County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Lamar County.
Permits and reviews for Lamar County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Lamar County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
Recent local action: Lamar County readopted its Guidelines and Criteria for Granting Tax Abatements in Reinvestment Zones on October 14, 2024. The guidelines list a "Renewable Energy Facility" and an "Energy Storage Facility" among the facility types eligible for a Chapter 312 abatement, defined to include wind turbines, photovoltaic solar panels, and batteries. (Lamar County tax abatement guidelines (county website); checked October 17, 2026).
How a project in Lamar County connects to the grid
Lamar County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Lamar County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Lamar County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.