Home › Texas › Atascosa County
Atascosa County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
14 proposed energy projects from ERCOT's September 2026 report, plus who to call in Atascosa County and in TCEQ Region 13 before signing a solar, wind, or battery storage lease.
Check land in Atascosa CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Atascosa County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Atascosa County?
ERCOT's September 2026 interconnection report lists 14 proposed energy projects in Atascosa County (8 solar and 6 battery storage), about 1,677 MW in all. 2 of the 14 have a signed interconnection agreement.
What stands out in Atascosa County
By capacity, solar leads in Atascosa County with 1,005 MW across 8 projects, followed by battery storage (6 projects, 672 MW); 2 self-limiting projects (reported at 0 MW because the resource limits its own output) are listed without a capacity. The largest single project is Bluewind BESS, a 246 MW stand-alone battery storage project listed under Bluewind Energy Center, LLC, still in study, and its target online date is Jul 2029. Of the 14, 12 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 1 has posted security or started construction. Connection points are mostly at 138 kV (7 projects), 345 kV (4 projects) and 69 kV (3 projects) (why the voltage matters). The single most-used connection point is TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2, shared by 3 projects. Amphion Solar, LLC is listed on the most projects here (4 of 14); 10 different companies appear in all. Target online dates for the projects not yet running span Aug 2027 to Nov 2029. All of them fall in ERCOT's South load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Paradiso BESS8203 Pleasanton 138kV | VESI 13 | Battery storage (stand-alone) | 102.3 | Mar 2028 | Signed; security posted |
| Grandslam Solar5700 Miracle Lake 138kV | Grandslam Solar, L.L.C. | Solar | 121.9 | Oct 2027 | Signed Jan 2021 |
| Reis SolarTapping into 138 kV line (5689) Choke Canyon AEP to (5902) San Migu... | Greenalia Solar Power Reis LLC | Solar | 105.5 | Aug 2027 | In study |
| Mutz SolarTap 69 kV 5693 San Miguel Tap - 5698 North Calliham Sub | AETS Development Holdings LLC | Solar | 72.8 | Jun 2028 | In study |
| Strawberry Dunes BESS SLFTap 138kV ROSSVILLESB8 (5718) to OAKSSW8 (5713) · shared with 1 other request | Strawberry Dunes LLC | Battery storage (paired with solar) | Self-limiting | Jun 2028 | In study |
| Strawberry Dunes Solar SLFTap 138kV ROSSVILLESB8 (5718) to OAKSSW8 (5713) · shared with 1 other request | Strawberry Dunes LLC | Solar | 101.1 | Jun 2028 | In study |
| Amphion Solar Phase 1TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt FOWRTN_SM... | Amphion Solar, LLC | Solar | 180.6 | Sep 2028 | In study |
| Great Hambino BESS#5700 Miracle Lake Substation 138kV | Atascosa BESS, LLC | Battery storage (stand-alone) | 123.0 | Oct 2028 | In study |
| Amphion Solar Phase 2TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2 · shared with 2 other requests | Amphion Solar, LLC | Solar | 205.9 | May 2029 | In study |
| Amphion StorageTAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2 · shared with 2 other requests | Amphion Solar, LLC | Battery storage (paired with solar) | 200.0 | May 2029 | In study |
| Kurtz Solar SLFTap 69kV #8206 Charlotte - #8607 Jourdanton · shared with 1 other request | Kurtz Solar, LLC | Solar | 101.9 | May 2029 | In study |
| Kurtz Storage SLFTap 69kV #8206 Charlotte - #8607 Jourdanton · shared with 1 other request | Kurtz Storage, LLC | Battery storage (paired with solar) | Self-limiting | May 2029 | In study |
| Bluewind BESS5713 Oaks Substation 138kV | Bluewind Energy Center, LLC | Battery storage (stand-alone) | 246.5 | Jul 2029 | In study |
| Amphion Solar Phase 3TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2 · shared with 2 other requests | Amphion Solar, LLC | Solar | 115.4 | Nov 2029 | In study |
Crowded connection points in Atascosa County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Fowlerton (5709) 345 kV 12 requests · 2,773 MW · 4 in Atascosa County, 8 in Webb, La Salle, McMullen10 in study, 2 signed; security posted
- La Salle Solar 26INR0088 · Solar · 513 MW · Signed; security posted · La Salle
- Miranda Solar Project 24INR0161 · Solar · 262 MW · Signed; security posted · McMullen
- Crescent C BESS 26INR0089 · Battery storage · 508 MW · In study · La Salle
- Diamond Sage Solar 1 27INR0390 · Solar · 214 MW · In study · Webb
- Diamond Sage Solar 2 27INR0395 · Solar · 214 MW · In study · Webb
- Amphion Solar Phase 2 28INR0343 · Solar · 206 MW · In study
- Amphion Storage 29INR0214 · Battery storage · 200 MW · In study
- Amphion Solar Phase 1 29INR0050 · Solar · 181 MW · In study
- Pradera Storage 23INR0183 · Battery storage · 153 MW · In study · Webb
- Amphion Solar Phase 3 28INR0344 · Solar · 115 MW · In study
- Diamond Sage BESS 1 27INR0414 · Battery storage · 104 MW · In study · Webb
- Diamond Sage BESS 2 27INR0444 · Battery storage · 104 MW · In study · Webb
San Miguel (5901) 345 kV 20 requests · 5,476 MW · 4 in Atascosa County, 16 in Duval, Wilson, McMullen17 in study, 3 signed; security posted
- Miranda Solar Project 24INR0161 · Solar · 262 MW · Signed; security posted · McMullen
- Anila BESS 26INR0077 · Battery storage · 209 MW · Signed; security posted · Wilson
- Anila Solar 26INR0074 · Solar · 201 MW · Signed; security posted · Wilson
- Mojo Solar 28INR0250 · Solar · 528 MW · In study · Wilson
- Cielo Vista Solar 27INR0150 · Solar · 503 MW · In study · Duval
- Wilson Gas Plant 28INR0494 · Gas engines · 403 MW · In study · Wilson
- Cielo Vista Power II 28INR0497 · Gas engines · 350 MW · In study · Duval
- Cielo Vista Power Gas Plant 28INR0325 · Gas engines · 344 MW · In study · Duval
- Cielo Vista Storage 29INR0115 · Battery storage · 311 MW · In study · Duval
- Estrella Dorada Wind 29INR0146 · Wind · 306 MW · In study · Duval
- Cazadores Solar 29INR0160 · Solar · 302 MW · In study · Duval
- Black Hawk Solar 28INR0040 · Solar · 251 MW · In study · Duval
- Amphion Solar Phase 2 28INR0343 · Solar · 206 MW · In study
- Marcelina Storage 23INR0318 · Battery storage · 203 MW · In study · Wilson
- Apricot Sun Solar 29INR0124 · Solar · 201 MW · In study · Duval
- Apricot Sun Storage 29INR0125 · Battery storage · 201 MW · In study · Duval
- Amphion Storage 29INR0214 · Battery storage · 200 MW · In study
- Guajillo Wind 28INR0168 · Wind · 200 MW · In study · Duval
- Amphion Solar Phase 1 29INR0050 · Solar · 181 MW · In study
- Amphion Solar Phase 3 28INR0344 · Solar · 115 MW · In study
Oaks (5713) 138 kV 3 requests · 348 MW3 in study
- Bluewind BESS 27INR0396 · Battery storage · 246 MW · In study
- Strawberry Dunes Solar SLF 28INR0208 · Solar · 101 MW · In study
- Strawberry Dunes BESS SLF 28INR0209 · Battery storage · 0 MW · In study
Miracle Lake (5700) 138 kV 2 requests · 245 MW1 signed, 1 in study
- Grandslam Solar 21INR0391 · Solar · 122 MW · Signed Jan 2021
- Great Hambino BESS 26INR0654 · Battery storage · 123 MW · In study
Charlotte (8206) 69 kV 2 requests · 102 MW2 in study
- Kurtz Solar SLF 27INR0305 · Solar · 102 MW · In study
- Kurtz Storage SLF 27INR0306 · Battery storage · 0 MW · In study
Jourdanton (8607) 69 kV 2 requests · 102 MW2 in study
- Kurtz Solar SLF 27INR0305 · Solar · 102 MW · In study
- Kurtz Storage SLF 27INR0306 · Battery storage · 0 MW · In study
Bus 5718 (5718) 138 kV 2 requests · 101 MW2 in study
- Strawberry Dunes Solar SLF 28INR0208 · Solar · 101 MW · In study
- Strawberry Dunes BESS SLF 28INR0209 · Battery storage · 0 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Atascosa County
- Atascosa County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 13, San Antonio: 14250 Judson Rd, San Antonio TX 78233-4480, 210-490-3096; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Atascosa County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Atascosa County.
Permits and reviews for Atascosa County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Atascosa County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Atascosa County connects to the grid
Atascosa County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Atascosa County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Atascosa County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 13
Bandera · Bexar · Comal · Edwards · Frio · Gillespie · Guadalupe · Karnes · Kendall · Kerr · Medina · Real · Uvalde · Wilson