Medina County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
7 proposed energy projects from ERCOT's September 2026 report, plus who to call in Medina County and in TCEQ Region 13 before signing a solar, wind, or battery storage lease.
Check land in Medina CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Medina County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Medina County?
ERCOT's September 2026 interconnection report lists 7 proposed energy projects in Medina County (2 solar and 5 battery storage), about 956 MW in all. None has a signed interconnection agreement yet.
What stands out in Medina County
By capacity, battery storage leads in Medina County with 745 MW across 5 projects, followed by solar (2 projects, 211 MW). The largest single project is Devine Mary BESS, a 201 MW stand-alone battery storage project listed under Devine Mary BESS, still in study, and its target online date is Nov 2028. Of the 7, 7 are still in ERCOT's study process. Every listed connection point is on the 138 kV system (why the voltage matters). Hondo Creek Solar, LLC is listed on the most projects here (2 of 7); 6 different companies appear in all. Target online dates for the projects not yet running span Oct 2027 to Dec 2030. All of them fall in ERCOT's South load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Chacon Creek(#8962) LYTLE4A 138KV | Cattlemen BESS LLC | Battery storage (stand-alone) | 188.9 | Oct 2027 | In study |
| Adam Bryant BESSTap 138kV 5225 HONDO – 5819 HONDO CREEK | Adam Bryant BESS LLC | Battery storage (stand-alone) | 99.5 | Dec 2027 | In study |
| Hondo Arroyo SolarTap 138 kV 5225 Hondo - 5813 Pearson · shared with 1 other request | Hondo Creek Solar, LLC | Solar | 60.4 | Jul 2028 | In study |
| Hondo Arroyo StorageTap 138 kV 5225 Hondo - 5813 Pearson · shared with 1 other request | Hondo Creek Solar, LLC | Battery storage (paired with solar) | 100.7 | Jul 2028 | In study |
| Devine Mary BESS5813 PEARSONSW8 138 kV | Devine Mary BESS | Battery storage (stand-alone) | 200.6 | Nov 2028 | In study |
| Ranger BESSSSWG Bus name: CSTROVILESB8 , Bus# : 5804 | Nova Clean Energy LLC | Battery storage (stand-alone) | 155.2 | Apr 2029 | In study |
| Dunlay SolarTap 138kV 5813 PearsonSW - 5225 Hondo | Medina PV, LLC | Solar | 150.5 | Dec 2030 | In study |
Crowded connection points in Medina County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Hondo (5225) 138 kV 4 requests · 411 MW4 in study
- Dunlay Solar 27INR0203 · Solar · 150 MW · In study
- Hondo Arroyo Storage 27INR0437 · Battery storage · 101 MW · In study
- Adam Bryant BESS 25INR0610 · Battery storage · 100 MW · In study
- Hondo Arroyo Solar 27INR0301 · Solar · 60 MW · In study
Pearson (5813) 138 kV 4 requests · 512 MW4 in study
- Devine Mary BESS 28INR0392 · Battery storage · 201 MW · In study
- Dunlay Solar 27INR0203 · Solar · 150 MW · In study
- Hondo Arroyo Storage 27INR0437 · Battery storage · 101 MW · In study
- Hondo Arroyo Solar 27INR0301 · Solar · 60 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Medina County
- Medina County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 13, San Antonio: 14250 Judson Rd, San Antonio TX 78233-4480, 210-490-3096; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Medina County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Medina County.
Permits and reviews for Medina County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Medina County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Medina County connects to the grid
Medina County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Medina County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Medina County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 13
Atascosa · Bandera · Bexar · Comal · Edwards · Frio · Gillespie · Guadalupe · Karnes · Kendall · Kerr · Real · Uvalde · Wilson