Wilson County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
15 proposed energy projects from ERCOT's September 2026 report, plus who to call in Wilson County and in TCEQ Region 13 before signing a solar, wind, or battery storage lease.
Check land in Wilson CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Wilson County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Wilson County?
ERCOT's September 2026 interconnection report lists 15 proposed energy projects in Wilson County (5 solar, 9 battery storage and 1 gas), about 3,533 MW in all. 6 of the 15 have a signed interconnection agreement.
What stands out in Wilson County
By capacity, solar leads in Wilson County with 1,631 MW across 5 projects, followed by battery storage (9 projects, 1,499 MW) and gas (1 project, 403 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Clear Fork Creek Solar, a 602 MW solar project listed under Clear Fork Creek Solar LLC, with its agreement signed and security posted, and its target online date is Apr 2027. Of the 15, 9 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 5 have posted security or started construction. Connection points are mostly at 345 kV (10 projects) and 138 kV (3 projects) (why the voltage matters). The single most-used connection point is Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS, shared by 3 projects. Pecan Springs Energy, LLC is listed on the most projects here (3 of 15); 10 different companies appear in all. Target online dates for the projects not yet running span Dec 2026 to Jun 2029. All of them fall in ERCOT's South load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Clear Fork Creek SolarTap 345KV 5133 Elm Creek - 5323 Old Hickory | Clear Fork Creek Solar LLC | Solar | 602.0 | Apr 2027 | Signed; security posted |
| Anila BESSTap of 345 kV Elm Creek (Bus# 5133) - San Miguel Gen (Bus# 5901) Tr... | Alina Energy LLC | Battery storage (paired with solar) | 209.0 | Sep 2028 | Signed; security posted |
| Anila SolarTap 345kV 5133 Elm Creek - 5901 San Miguel Gen Ckt 1 | Alina Energy LLC | Solar | 200.8 | Sep 2028 | Signed; security posted |
| Huisache BESSTapping the Elm Creek to Shaula circuit 1 · shared with 1 other request | Huisache Solar, LLC | Battery storage (paired with solar) | 100.7 | Jun 2029 | Signed; security posted |
| Huisache SolarTapping the Elm Creek to Shaula circuit 1 · shared with 1 other request | Huisache Solar, LLC | Solar | 125.6 | Jun 2029 | Signed; security posted |
| Moonstone Solar ProjectTap 138kV Eagle Creek (5132) to Floresville (5155) · shared with 1 other request | Moon Stone Solar Farm, LLC | Solar | 175.0 | Mar 2029 | Signed Feb 2025 |
| Marcelina StorageTap 345 kV 5133 Elm Creek - 5901 San Miguel | Marcelina Solar, LLC | Battery storage (stand-alone) | 203.2 | Dec 2026 | In study |
| Cachena Storage SLFTap 345KV 5133 Elmcreek - 5323 Old Hickory | Clear Fork Creek Solar LLC | Battery storage (paired with solar) | Self-limiting | Apr 2027 | In study |
| Mojo SolarTap 345 kV 5133 Elm Creek - 5901 San Miguel CKT 1 & 2 | Power Synergy | Solar | 527.9 | Jun 2028 | In study |
| Wilson Gas PlantTap 345 kV 5133 ELMCREEK - 5901 MIGUEL5 CKT 1 | Misae Gas Power | Gas engines | 402.9 | Jun 2028 | In study |
| Strawberry Acres Storage5132 Eagle Creek Substation 138kV | Strawberry Acres Energy Center, LLC | Battery storage (stand-alone) | 156.7 | Sep 2028 | In study |
| Moon Stone BESSTap 138kV Eagle Creek (5132) to Floresville (5155) · shared with 1 other request | Moon Stone Battery Facility LLC | Battery storage (stand-alone) | 200.8 | Mar 2029 | In study |
| Nockenut Springs Storage 1Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS · shared with 2 other requests | Pecan Springs Energy, LLC | Battery storage (paired with solar) | 209.4 | Jun 2029 | In study |
| Nockenut Springs Storage 2Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS · shared with 2 other requests | Pecan Springs Energy, LLC | Battery storage (paired with solar) | 209.4 | Jun 2029 | In study |
| Nockenut Springs Storage 3Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS · shared with 2 other requests | Pecan Springs Energy, LLC | Battery storage (paired with solar) | 209.4 | Jun 2029 | In study |
Crowded connection points in Wilson County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Elm Creek (5133) 345 kV 19 requests · 4,695 MW · 10 in Wilson County, 9 in Gonzales, DeWitt, Guadalupe12 in study, 7 signed; security posted
- Clear Fork Creek Solar 23INR0027 · Solar · 602 MW · Signed; security posted
- Anila BESS 26INR0077 · Battery storage · 209 MW · Signed; security posted
- Shaula I Solar 22INR0251 · Solar · 205 MW · Signed; security posted · DeWitt
- Shaula II Solar 22INR0267 · Solar · 205 MW · Signed; security posted · DeWitt
- Nockenut Springs Solar 2 24INR0007 · Solar · 203 MW · Signed; security posted · Guadalupe
- Nockenut Springs Solar 1 23INR0088 · Solar · 203 MW · Signed; security posted · Guadalupe
- Anila Solar 26INR0074 · Solar · 201 MW · Signed; security posted
- Mojo Solar 28INR0250 · Solar · 528 MW · In study
- Wilson Gas Plant 28INR0494 · Gas engines · 403 MW · In study
- Columbine Wind 29INR0063 · Wind · 295 MW · In study · Gonzales
- Nockenut Springs Storage 2 29INR0319 · Battery storage · 209 MW · In study
- Nockenut Springs Storage 3 29INR0320 · Battery storage · 209 MW · In study
- Nockenut Springs Storage 1 29INR0318 · Battery storage · 209 MW · In study
- Shaula III Solar 23INR0009 · Solar · 205 MW · In study · DeWitt
- Marcelina Storage 23INR0318 · Battery storage · 203 MW · In study
- Nockenut Springs Solar 3 25INR0010 · Solar · 201 MW · In study · Gonzales
- Nockenut Springs Solar 4 25INR0193 · Solar · 201 MW · In study · Gonzales
- Nockenut Springs Solar 5 25INR0280 · Solar · 201 MW · In study · Gonzales
- Cachena Storage SLF 23INR0077 · Battery storage · 0 MW · In study
San Miguel (5901) 345 kV 20 requests · 5,476 MW · 5 in Wilson County, 15 in Duval, Atascosa, McMullen17 in study, 3 signed; security posted
- Miranda Solar Project 24INR0161 · Solar · 262 MW · Signed; security posted · McMullen
- Anila BESS 26INR0077 · Battery storage · 209 MW · Signed; security posted
- Anila Solar 26INR0074 · Solar · 201 MW · Signed; security posted
- Mojo Solar 28INR0250 · Solar · 528 MW · In study
- Cielo Vista Solar 27INR0150 · Solar · 503 MW · In study · Duval
- Wilson Gas Plant 28INR0494 · Gas engines · 403 MW · In study
- Cielo Vista Power II 28INR0497 · Gas engines · 350 MW · In study · Duval
- Cielo Vista Power Gas Plant 28INR0325 · Gas engines · 344 MW · In study · Duval
- Cielo Vista Storage 29INR0115 · Battery storage · 311 MW · In study · Duval
- Estrella Dorada Wind 29INR0146 · Wind · 306 MW · In study · Duval
- Cazadores Solar 29INR0160 · Solar · 302 MW · In study · Duval
- Black Hawk Solar 28INR0040 · Solar · 251 MW · In study · Duval
- Amphion Solar Phase 2 28INR0343 · Solar · 206 MW · In study · Atascosa
- Marcelina Storage 23INR0318 · Battery storage · 203 MW · In study
- Apricot Sun Solar 29INR0124 · Solar · 201 MW · In study · Duval
- Apricot Sun Storage 29INR0125 · Battery storage · 201 MW · In study · Duval
- Amphion Storage 29INR0214 · Battery storage · 200 MW · In study · Atascosa
- Guajillo Wind 28INR0168 · Wind · 200 MW · In study · Duval
- Amphion Solar Phase 1 29INR0050 · Solar · 181 MW · In study · Atascosa
- Amphion Solar Phase 3 28INR0344 · Solar · 115 MW · In study · Atascosa
Eagle Creek (5132) 138 kV 3 requests · 532 MW2 in study, 1 signed
- Moonstone Solar Project 24INR0156 · Solar · 175 MW · Signed Feb 2025
- Moon Stone BESS 28INR0299 · Battery storage · 201 MW · In study
- Strawberry Acres Storage 25INR0248 · Battery storage · 157 MW · In study
Shaula (5380) 345 kV 6 requests · 1,439 MW · 3 in Wilson County, 3 in DeWitt, Lavaca, Gonzales5 in study, 1 signed
- Oak Tree Energy Storage 27INR0091 · Battery storage · 310 MW · Signed May 2026 · Lavaca
- Columbine Wind 29INR0063 · Wind · 295 MW · In study · Gonzales
- Nockenut Springs Storage 2 29INR0319 · Battery storage · 209 MW · In study
- Nockenut Springs Storage 3 29INR0320 · Battery storage · 209 MW · In study
- Nockenut Springs Storage 1 29INR0318 · Battery storage · 209 MW · In study
- Shaula I BESS 24INR0555 · Battery storage · 206 MW · In study · DeWitt
Old Hickory (5323) 345 kV 3 requests · 811 MW · 2 in Wilson County, 1 in Jackson1 approved for synchronization, 1 signed; security posted, 1 in study
- New Hickory Solar 20INR0236 · Solar · 209 MW · Approved for synchronization · Jackson
- Clear Fork Creek Solar 23INR0027 · Solar · 602 MW · Signed; security posted
- Cachena Storage SLF 23INR0077 · Battery storage · 0 MW · In study
Bus 5155 (5155) 138 kV 2 requests · 376 MW1 signed, 1 in study
- Moonstone Solar Project 24INR0156 · Solar · 175 MW · Signed Feb 2025
- Moon Stone BESS 28INR0299 · Battery storage · 201 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Wilson County
- Wilson County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 13, San Antonio: 14250 Judson Rd, San Antonio TX 78233-4480, 210-490-3096; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Wilson County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Wilson County.
Permits and reviews for Wilson County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Wilson County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
Recent local action: The Wilson County Commissioners' Court placed on its July 14, 2025 agenda an item to discuss and take action on a proposed tax abatement agreement with Clear Fork Creek Solar, LLC for a 600-megawatt solar facility in the Clear Fork Creek Solar Reinvestment Zone in Precinct 4. (Wilson County commissioners court agenda item; checked October 17, 2026).
How a project in Wilson County connects to the grid
Wilson County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Wilson County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Wilson County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 13
Atascosa · Bandera · Bexar · Comal · Edwards · Frio · Gillespie · Guadalupe · Karnes · Kendall · Kerr · Medina · Real · Uvalde