Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Bexar County

Bexar County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects23
Total capacity5,170MW
Signed agreements10of 23
New since August0requests

23 proposed energy projects from ERCOT's September 2026 report, plus who to call in Bexar County and in TCEQ Region 13 before signing a solar, wind, or battery storage lease.

Check land in Bexar CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Bexar County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Bexar County?

ERCOT's September 2026 interconnection report lists 23 proposed energy projects in Bexar County (1 solar, 20 battery storage and 2 gas), about 5,170 MW in all. 10 of the 23 have a signed interconnection agreement, and 4 have been approved for energization or synchronization.

What stands out in Bexar County

By capacity, battery storage leads in Bexar County with 4,983 MW across 20 projects, followed by solar (1 project, 152 MW) and gas (2 projects, 34 MW). The largest single project is Howard Road BESS, a 618 MW stand-alone battery storage project listed under Project Fast Flow LLC, still in study, and its target online date is Apr 2028. Of the 23, 13 are still in ERCOT's study process, 3 have a signed interconnection agreement but no security posted yet, 3 have posted security or started construction and 4 are approved for energization or synchronization. Connection points are mostly at 138 kV (15 projects) and 345 kV (7 projects) (why the voltage matters). CPS Energy and Mission Station LLC are each listed on 2 projects; 21 different companies appear in all. Target online dates for the projects not yet running span Apr 2027 to Feb 2031. All of them fall in ERCOT's South load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Padua Grid BESS Unit 3Tap #5395 O.W Sommer 138kVPadua Grid 3, LLCBattery storage (stand-alone)201.3May 2026Approved for synchronization
CPS AvR CT1 Rotor Replacement5475 Braunig 345kV · shared with 1 other requestCPS EnergyGas combined cycle11.3Aug 2026Approved for synchronization
CPS Energy AvR1CT2 Rotor Replacement5475 Braunig 345kV · shared with 1 other requestCPS EnergyGas combined cycle23.2Aug 2026Approved for synchronization
Bexar Martinez BESSMartinezBexar Martinez LLCBattery storage (stand-alone)10.0Jan 2027Approved for energization
El Patrimonio Solartap 138kV 5429 Trumbo - 5260 Leon CreekHeritage Solar, LLCSolar152.3Apr 2027Signed; security posted
Louisa Energy Storage138 kV Helotes (#5200)VESI 49 LLCBattery storage (stand-alone)102.8Mar 2029Signed; security posted
Taormina StorageTap 138kV VH Braunig (5025) to Valley Road 138kV (5465)Taormina Storage Project LLCBattery storage (stand-alone)231.9May 2029Signed; security posted
Alamo City BESSTap 138kV 5294 Martinez - 5110 JT DeelyALAMO CITY ESS LLCBattery storage (stand-alone)128.2Sep 2027Signed May 2025
Riverwalk BESS5294 Martinez Substation 138kVRWE Solar Developement, LLCBattery storage (stand-alone)120.0Oct 2027Signed Aug 2026
Lavender Storage ProjectTap 138kV Deely (bus 5110) - Laredo (bus 5255)Lavender Storage Project LLCBattery storage (stand-alone)231.9Sep 2029Signed Jun 2025
Orbit Energy StorageTap 345 kV Calaveras Power Station (BUS #5400) to VON_ROSE (BUS #5475)GCI Orbit Energy Storage, LLCBattery storage (stand-alone)501.9Jun 2027In study
Ferdinand Grid BESS II5260 Leon Creek 138kVCoval Infrastructure DevCo LLCBattery storage (stand-alone)208.1Dec 2027In study
Quela BESSTap 138kV 5110 J.T. Deely - 5294 MartinezBRP Quela BESS LLCBattery storage (stand-alone)301.4Dec 2027In study
Horsepower BESSPOI is 138 kV Howard Substation (Bus# 5230) (SSWG bus name: HOWARD)...Horsepower BESS, LLCBattery storage (stand-alone)257.5Jan 2028In study
Howard Road BESS5231 HOWARD RD 345 kVProject Fast Flow LLCBattery storage (stand-alone)617.6Apr 2028In study
Caracara Energy Storage CenterTap 138kV 5055 Cagnon - 5346 PotrancoFRESH AIR ENERGY II, LLCBattery storage (stand-alone)203.0Aug 2028In study
Bernice Energy Storage5135 ELMENDORF 138kVBernice Energy Storage LLCBattery storage (stand-alone)402.8Feb 2029In study
Dorsey Road BESSTap 138 kV Chavanea (5085) - Palo Alto (5330).Horizon Energy Storage Greenfield Project Holdings LLCBattery storage (stand-alone)150.4Aug 2029In study
Otter BESS5378 SHEPHERD RD 138kVGRS BESS TEXAS TEN, LLCBattery storage (stand-alone)157.1Sep 2029In study
Mission Station Energy Storage ITap 345kV (Bus #5400) SPRUCE – (Bus #5475) VON_ROSE Ckt 1;Mission Station LLCBattery storage (stand-alone)375.0May 2030In study
Mission Station Energy Storage IITap 345kV (Bus #5400) SPRUCE – (Bus #5231) HOWARD_5 Ckt 1Mission Station LLCBattery storage (stand-alone)375.0May 2030In study
Cado StorageTap 138 kV Line from Braunig East (#5030) to Highland Hills (#5205)...Cado Storage, LLCBattery storage (stand-alone)205.5Jun 2030In study
RUSH ESSTap 345 kV 5231 HOWARD_5 – 5400 SPRUCEOCI Solar Power LLCBattery storage (stand-alone)201.3Feb 2031In study

Crowded connection points in Bexar County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Braunig (5475) 345 kV 4 requests · 911 MW2 approved for synchronization, 2 in study
  • CPS Energy AvR1CT2 Rotor Replacement 25INR0531 · Gas combined cycle · 23 MW · Approved for synchronization
  • CPS AvR CT1 Rotor Replacement 24INR0427 · Gas combined cycle · 11 MW · Approved for synchronization
  • Orbit Energy Storage 27INR0082 · Battery storage · 502 MW · In study
  • Mission Station Energy Storage I 28INR0474 · Battery storage · 375 MW · In study
Spruce (5400) 345 kV 4 requests · 1,453 MW4 in study
  • Orbit Energy Storage 27INR0082 · Battery storage · 502 MW · In study
  • Mission Station Energy Storage I 28INR0474 · Battery storage · 375 MW · In study
  • Mission Station Energy Storage II 28INR0475 · Battery storage · 375 MW · In study
  • RUSH ESS 26INR0331 · Battery storage · 201 MW · In study
Deely (5110) 138 kV 3 requests · 662 MW2 signed, 1 in study
  • Lavender Storage Project 23INR0467 · Battery storage · 232 MW · Signed Jun 2025
  • Alamo City BESS 26INR0330 · Battery storage · 128 MW · Signed May 2025
  • Quela BESS 22INR0423 · Battery storage · 301 MW · In study
Martinez (5294) 138 kV 3 requests · 550 MW2 signed, 1 in study
  • Alamo City BESS 26INR0330 · Battery storage · 128 MW · Signed May 2025
  • Riverwalk BESS 24INR0392 · Battery storage · 120 MW · Signed Aug 2026
  • Quela BESS 22INR0423 · Battery storage · 301 MW · In study
HOWARD_5 (5231) 345 kV 3 requests · 1,194 MW3 in study
  • Howard Road BESS 29INR0173 · Battery storage · 618 MW · In study
  • Mission Station Energy Storage II 28INR0475 · Battery storage · 375 MW · In study
  • RUSH ESS 26INR0331 · Battery storage · 201 MW · In study
Leon Creek (5260) 138 kV 2 requests · 360 MW1 signed; security posted, 1 in study
  • El Patrimonio Solar 23INR0207 · Solar · 152 MW · Signed; security posted
  • Ferdinand Grid BESS II 27INR0393 · Battery storage · 208 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Bexar County

  • Bexar County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 13, San Antonio: 14250 Judson Rd, San Antonio TX 78233-4480, 210-490-3096; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Bexar County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Bexar County.

Permits and reviews for Bexar County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Bexar County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Bexar County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.

How a project in Bexar County connects to the grid

Bexar County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Bexar County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Bexar County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 13

Atascosa · Bandera · Comal · Edwards · Frio · Gillespie · Guadalupe · Karnes · Kendall · Kerr · Medina · Real · Uvalde · Wilson

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources