La Salle County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
5 proposed energy projects from ERCOT's September 2026 report, plus who to call in La Salle County and in TCEQ Region 16 before signing a solar, wind, or battery storage lease.
Check land in La Salle CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for La Salle County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in La Salle County?
ERCOT's September 2026 interconnection report lists 5 proposed energy projects in La Salle County (2 solar, 1 wind and 2 battery storage), about 1,499 MW in all. 2 of the 5 have a signed interconnection agreement.
What stands out in La Salle County
By capacity, solar leads in La Salle County with 716 MW across 2 projects, followed by battery storage (2 projects, 586 MW) and wind (1 project, 197 MW). The largest single project is La Salle Solar, a 513 MW solar project listed under La Salle Solar LLC, with its agreement signed and security posted, and its target online date is Sep 2028. Of the 5, 3 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 1 has posted security or started construction. Connection points are mostly at 138 kV (3 projects) and 345 kV (2 projects) (why the voltage matters). Each of the 5 projects is listed under a different company. Target online dates for the projects not yet running span Dec 2026 to Sep 2028. All of them fall in ERCOT's South load zone. 2 that were listed in August have since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| La Salle SolarTap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709) | La Salle Solar LLC | Solar | 512.6 | Sep 2028 | Signed; security posted |
| Loma Pinta Wind5705 Fowlerton 138kV · shared with 1 other request | Enerverse | Wind | 197.0 | Dec 2026 | Signed Dec 2017 |
| Hinkell BESS8612 Reveille 138kV | Reveille BESS | Battery storage (stand-alone) | 78.0 | Jul 2027 | In study |
| Crescent C BESSTap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709) CKT#2 | OCI La Salle ESS LLC | Battery storage (stand-alone) | 508.3 | Feb 2028 | In study |
| Loma Pinta Solar5705 Fowlerton 138kV · shared with 1 other request | Loma Pinta Wind Energy, LLC | Solar | 203.1 | May 2028 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- Vazlon BESS SLF, battery storage (Vazlon Energy LLC)
- Vazlon Solar SLF, solar, 211 MW (Vazlon Energy LLC)
Crowded connection points in La Salle County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Fowlerton (5705) 138 kV 2 requests · 400 MW1 signed, 1 in study
- Loma Pinta Wind 16INR0112 · Wind · 197 MW · Signed Dec 2017
- Loma Pinta Solar 22INR0357 · Solar · 203 MW · In study
Lobo (80219) 345 kV 11 requests · 2,827 MW · 2 in La Salle County, 9 in Webb7 in study, 3 signed; security posted, 1 signed
- La Salle Solar 26INR0088 · Solar · 513 MW · Signed; security posted
- Cuchillas Solar 24INR0059 · Solar · 306 MW · Signed; security posted · Webb
- Corvus Solar 27INR0126 · Solar · 202 MW · Signed; security posted · Webb
- Corazon Solar Phase II 22INR0257 · Solar · 204 MW · Signed Aug 2020 · Webb
- Crescent C BESS 26INR0089 · Battery storage · 508 MW · In study
- Cuchillas BESS 27INR0077 · Battery storage · 307 MW · In study · Webb
- Diamond Sage Solar 1 27INR0390 · Solar · 214 MW · In study · Webb
- Diamond Sage Solar 2 27INR0395 · Solar · 214 MW · In study · Webb
- Pradera Storage 23INR0183 · Battery storage · 153 MW · In study · Webb
- Diamond Sage BESS 1 27INR0414 · Battery storage · 104 MW · In study · Webb
- Diamond Sage BESS 2 27INR0444 · Battery storage · 104 MW · In study · Webb
Fowlerton (5709) 345 kV 12 requests · 2,773 MW · 2 in La Salle County, 10 in Webb, Atascosa, McMullen10 in study, 2 signed; security posted
- La Salle Solar 26INR0088 · Solar · 513 MW · Signed; security posted
- Miranda Solar Project 24INR0161 · Solar · 262 MW · Signed; security posted · McMullen
- Crescent C BESS 26INR0089 · Battery storage · 508 MW · In study
- Diamond Sage Solar 1 27INR0390 · Solar · 214 MW · In study · Webb
- Diamond Sage Solar 2 27INR0395 · Solar · 214 MW · In study · Webb
- Amphion Solar Phase 2 28INR0343 · Solar · 206 MW · In study · Atascosa
- Amphion Storage 29INR0214 · Battery storage · 200 MW · In study · Atascosa
- Amphion Solar Phase 1 29INR0050 · Solar · 181 MW · In study · Atascosa
- Pradera Storage 23INR0183 · Battery storage · 153 MW · In study · Webb
- Amphion Solar Phase 3 28INR0344 · Solar · 115 MW · In study · Atascosa
- Diamond Sage BESS 1 27INR0414 · Battery storage · 104 MW · In study · Webb
- Diamond Sage BESS 2 27INR0444 · Battery storage · 104 MW · In study · Webb
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in La Salle County
- La Salle County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 16, Laredo: 707 E Calton Rd, Ste 304, Laredo TX 78041-3887, 956-791-6611; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- La Salle County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for La Salle County.
Permits and reviews for La Salle County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in La Salle County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in La Salle County connects to the grid
La Salle County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in La Salle County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in La Salle County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 16
Dimmit · Duval · Kinney · Maverick · McMullen · Val Verde · Webb · Zapata · Zavala