Proposed projects23
Total capacity4,247MW
Signed agreements10of 23
New since August0requests

23 proposed energy projects from ERCOT's September 2026 report, plus who to call in Matagorda County and in TCEQ Region 12 before signing a solar, wind, or battery storage lease.

Check land in Matagorda CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Matagorda County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Matagorda County?

ERCOT's September 2026 interconnection report lists 23 proposed energy projects in Matagorda County (10 solar, 1 wind and 12 battery storage), about 4,247 MW in all. 10 of the 23 have a signed interconnection agreement, and 1 has been approved for energization or synchronization. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.

What stands out in Matagorda County

By capacity, solar leads in Matagorda County with 2,415 MW across 10 projects, followed by battery storage (12 projects, 1,591 MW) and wind (1 project, 241 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Duffy Solar, a 502 MW solar project listed under Duffy Project Co LLC, with its agreement signed and security posted, and its target online date is Dec 2027. Of the 23, 13 are still in ERCOT's study process, 9 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 345 kV (9 projects), 138 kV (9 projects) and 69 kV (1 project) (why the voltage matters). The single most-used connection point is #8754 Zoisite 345kV, shared by 3 projects. Industrial November Project LLC is listed on the most projects here (3 of 23); 19 different companies appear in all. Target online dates for the projects not yet running span Nov 2026 to Apr 2030. All of them fall in ERCOT's Coastal load zone. 4 that were listed in August have since dropped off.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Peyton Creek Wind II42400 Refuge 345kVRWE Renewables Development, LLCWind241.2Dec 2026Approved for synchronization
Pledger BESS29.188382, -95.911558Regis Pledger LLCBattery storage (stand-alone)9.5Nov 2026Signed; security posted
Pavlov BESS2Pavlov TSP Station Code: PAVLOV Load Name: 138_13_1 Bus #: PTI Bus...Matagorda Clean Energy Center, LLCBattery storage (stand-alone)10.0Dec 2026Signed; security posted
Duffy BESSTap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39) · shared with 1 other requestDuffy Energy Storage LLCBattery storage (paired with solar)241.1Dec 2026Signed; security posted
City Breeze BESS8111 MAGILL4A 138KVCity Breeze BESS LLCBattery storage (stand-alone)143.1Mar 2027Signed; security posted
Isaac Solar8114 Conoco 138kVIndustrial Bravo Project LLCSolar50.7Apr 2027Signed; security posted
Matagorda Solar5555 Shropshire 69kVMatagorda Solar Farm, LLCSolar101.0Aug 2027Signed; security posted
Duffy SolarTap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39) · shared with 1 other requestDuffy Project Co LLCSolar502.5Dec 2027Signed; security posted
Eldora BESS345 kV South Texas Project (Bus# 5915) – Hillje (Bus# 44200) Transm...Eldora Energy LLCBattery storage (paired with solar)201.3Jul 2028Signed; security posted
Eldora SolarTap 345 kV 5915 South Texas Project – 44200 Hillje Ckt 1Eldora Energy LLCSolar200.9Jul 2028Signed; security posted
STP Unit2 High Pressure Turbine Upgrade5915 SO_TEX__345A 345 kVConstellation South Texas, LLCNuclear1,336.5Apr 2027In study
Blackcat Storage138kV Blackcat Substation (#80124)Matagorda ESS, LLCBattery storage (stand-alone)200.6Dec 2027In study
Pledgor BESSTap Gulftie (43340) – Pledger (43120) circuit 60Pledgor BESSBattery storage (stand-alone)100.3Apr 2028In study
Shoshana StorageTap STP – Refuge ckt 27Shoshana Storage Project LLCBattery storage (stand-alone)221.0May 2028In study
Midfield BESS Project SLFTap 138kV 8121 Blessing - 8125 Lolita · shared with 1 other requestHQC Solar Holdings 1, LLCBattery storage (paired with solar)Self-limitingJul 2028In study
Midfield PV Project SLFTap 138kV 8121 Blessing - 8125 Lolita · shared with 1 other requestHQC Solar Holdings 1, LLCSolar150.0Jul 2028In study
Post Trail EnergyTap 138kV Conoco 8138 - Black Cat 80124 · shared with 1 other requestPost Trail Energy, LLCBattery storage (stand-alone)103.5Oct 2028In study
Running Iron SolarTap 138kV Conoco 8138 - Black Cat 80124 · shared with 1 other requestRunning Iron Solar, LLCSolar204.7Oct 2028In study
Bastion BESSBlessing Substation 138 kV (ID 8121)BESS BASTION LLCBattery storage (stand-alone)154.3Nov 2028In study
Solar Star Bay City StorageTap 138kV Conoco (#8138) – Black Cat (#80124)Solar Star Bay City StorageBattery storage (stand-alone)206.3Feb 2029In study
Bluefox Solar 1#8754 Zoisite 345kV · shared with 2 other requestsIndustrial November Project LLCSolar402.6May 2029In study
Percy Farm SolarTap 345kV 8123 Blessing - 5915 STPPercy Farm Solar 1, LLCSolar198.6May 2029In study
Bluefox Solar 2#8754 Zoisite 345kV · shared with 2 other requestsIndustrial November Project LLCSolar401.8Jan 2030In study
Bluefox Solar 3#8754 Zoisite 345kV · shared with 2 other requestsIndustrial November Project LLCSolar201.8Apr 2030In study

No longer listed since August

These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.

  • Charolais Solar, solar, 262 MW (RWE Solar Development, LLC)
  • Charolais Storage, battery storage, 150 MW (RWE Solar Development, LLC)
  • Razorbill Solar, solar, 240 MW (RWE Solar Development, LLC)
  • Razorbill Storage, battery storage, 120 MW (RWE Solar Development, LLC)

Crowded connection points in Matagorda County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

STP (5915) 345 kV 17 requests · 5,264 MW · 5 in Matagorda County, 11 in DeWitt, Gonzales, Guadalupe8 signed; security posted, 6 in study, 2 signed, 1 approved for synchronization
  • Charger Solar 23INR0047 · Solar · 397 MW · Approved for synchronization · Refugio
  • Duffy Solar 23INR0057 · Solar · 502 MW · Signed; security posted
  • Duffy BESS 26INR0250 · Battery storage · 241 MW · Signed; security posted
  • Shaula I Solar 22INR0251 · Solar · 205 MW · Signed; security posted · DeWitt
  • Shaula II Solar 22INR0267 · Solar · 205 MW · Signed; security posted · DeWitt
  • Nockenut Springs Solar 2 24INR0007 · Solar · 203 MW · Signed; security posted · Guadalupe
  • Nockenut Springs Solar 1 23INR0088 · Solar · 203 MW · Signed; security posted · Guadalupe
  • Eldora BESS 24INR0338 · Battery storage · 201 MW · Signed; security posted
  • Eldora Solar 24INR0337 · Solar · 201 MW · Signed; security posted
  • Oak Tree Energy Storage 27INR0091 · Battery storage · 310 MW · Signed May 2026 · Lavaca
  • Iguala Solar 23INR0090 · Solar · 250 MW · Signed Jul 2025 · Victoria
  • STP Unit2 High Pressure Turbine Upgrade 27INR0557 · Nuclear · 1,337 MW · In study
  • Shaula III Solar 23INR0009 · Solar · 205 MW · In study · DeWitt
  • Nockenut Springs Solar 3 25INR0010 · Solar · 201 MW · In study · Gonzales
  • Nockenut Springs Solar 4 25INR0193 · Solar · 201 MW · In study · Gonzales
  • Nockenut Springs Solar 5 25INR0280 · Solar · 201 MW · In study · Gonzales
  • Percy Farm Solar 24INR0020 · Solar · 199 MW · In study
Black Cat (80124) 138 kV 4 requests · 715 MW4 in study
  • Solar Star Bay City Storage 27INR0120 · Battery storage · 206 MW · In study
  • Running Iron Solar 26INR0258 · Solar · 205 MW · In study
  • Blackcat Storage 26INR0376 · Battery storage · 201 MW · In study
  • Post Trail Energy 26INR0429 · Battery storage · 104 MW · In study
Conoco (8138) 138 kV 3 requests · 515 MW3 in study
  • Solar Star Bay City Storage 27INR0120 · Battery storage · 206 MW · In study
  • Running Iron Solar 26INR0258 · Solar · 205 MW · In study
  • Post Trail Energy 26INR0429 · Battery storage · 104 MW · In study
Blessing (8121) 138 kV 4 requests · 406 MW · 3 in Matagorda County, 1 in Wharton4 in study
  • Bastion BESS 28INR0341 · Battery storage · 154 MW · In study
  • Midfield PV Project SLF 26INR0347 · Solar · 150 MW · In study
  • Hynes Bay Energy Storage 25INR0542 · Battery storage · 101 MW · In study · Wharton
  • Midfield BESS Project SLF 26INR0362 · Battery storage · 0 MW · In study
Zoisite (8754) 345 kV 3 requests · 1,006 MW3 in study
  • Bluefox Solar 1 27INR0141 · Solar · 403 MW · In study
  • Bluefox Solar 2 28INR0063 · Solar · 402 MW · In study
  • Bluefox Solar 3 28INR0064 · Solar · 202 MW · In study
Wa Parish (44000) 345 kV 5 requests · 1,258 MW · 2 in Matagorda County, 3 in Fort Bend2 signed; security posted, 2 approved for synchronization, 1 in study
  • Crowned Heron BESS 24INR0405 · Battery storage · 154 MW · Approved for synchronization · Fort Bend
  • Crowned Heron BESS 2 24INR0493 · Battery storage · 154 MW · Approved for synchronization · Fort Bend
  • Duffy Solar 23INR0057 · Solar · 502 MW · Signed; security posted
  • Duffy BESS 26INR0250 · Battery storage · 241 MW · Signed; security posted
  • Bypass BESS II 26INR0525 · Battery storage · 206 MW · In study · Fort Bend
Hillje (44200) 345 kV 9 requests · 2,307 MW · 2 in Matagorda County, 7 in Wharton4 signed; security posted, 3 signed, 1 approved for synchronization, 1 in study
  • Danish Fields Solar 20INR0069 · Solar · 603 MW · Approved for synchronization · Wharton
  • Ramsey Storage 21INR0505 · Battery storage · 500 MW · Signed; security posted · Wharton
  • Space City Solar 21INR0341 · Solar · 366 MW · Signed; security posted · Wharton
  • Eldora BESS 24INR0338 · Battery storage · 201 MW · Signed; security posted
  • Eldora Solar 24INR0337 · Solar · 201 MW · Signed; security posted
  • Malachite BESS 27INR0112 · Battery storage · 191 MW · Signed Dec 2025 · Wharton
  • Malachite Solar 27INR0111 · Solar · 185 MW · Signed Dec 2025 · Wharton
  • Cernan BESS 27INR0392 · Battery storage · 10 MW · Signed Dec 2025 · Wharton
  • Voyager Storage 20INR0238 · Battery storage · 50 MW · In study · Wharton
Lolita (8125) 138 kV 4 requests · 405 MW · 2 in Matagorda County, 2 in Jackson, Victoria3 in study, 1 signed; security posted
  • Third Coast BESS 23INR0361 · Battery storage · 103 MW · Signed; security posted · Jackson
  • Tejano Storage 24INR0168 · Battery storage · 152 MW · In study · Victoria
  • Midfield PV Project SLF 26INR0347 · Solar · 150 MW · In study
  • Midfield BESS Project SLF 26INR0362 · Battery storage · 0 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Matagorda County

  • Matagorda County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 12, Houston: 5425 Polk St, Ste H, Houston TX 77023-1452, 713-767-3500; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Matagorda County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Matagorda County.

Permits and reviews for Matagorda County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Matagorda County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Matagorda County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.

How a project in Matagorda County connects to the grid

Matagorda County is on the ERCOT grid. The projects listed above are in ERCOT's Coastal load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Matagorda County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Matagorda County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 12

Austin · Brazoria · Chambers · Colorado · Fort Bend · Galveston · Harris · Liberty · Montgomery · Walker · Waller · Wharton

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources