Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Galveston County

Galveston County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects10
Total capacity2,736MW
Signed agreements5of 10
New since August0requests

10 proposed energy projects from ERCOT's September 2026 report, plus who to call in Galveston County and in TCEQ Region 12 before signing a solar, wind, or battery storage lease.

Check land in Galveston CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Galveston County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Galveston County?

ERCOT's September 2026 interconnection report lists 10 proposed energy projects in Galveston County (1 wind, 8 battery storage and 1 gas), about 2,736 MW in all. 5 of the 10 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.

What stands out in Galveston County

By capacity, battery storage leads in Galveston County with 1,693 MW across 8 projects, followed by wind (1 project, 1,029 MW) and gas (1 project, 14 MW). The largest single project is Hecate Energy Jamaica Wind, a 1,029 MW wind project listed under Hecate Energy LLC, still in study, and its target online date is Jun 2030. Of the 10, 5 are still in ERCOT's study process, 4 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 138 kV (7 projects), 69 kV (1 project) and 345 kV (1 project) (why the voltage matters). Each of the 10 projects is listed under a different company. Target online dates for the projects not yet running span Dec 2026 to Jun 2030. All of them fall in ERCOT's Houston load zone. 1 that was listed in August has since dropped off.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Air Products GCA39140 TNTxCityMain 69kV (Will be upgraded to 138kV)Air ProductsGas steam turbine14.0Dec 2025Approved for synchronization
SOUTHERN SELECT ENERGY STORAGEBus Name: TNHEIGHTS_1SOUTHERN SELECT ENERGY STORAGE LLCBattery storage (stand-alone)204.8May 2027Signed; security posted
Red Egret BESS38820 FREEWAY PARK 138KVRed Egret LLCBattery storage (stand-alone)310.6Nov 2027Signed; security posted
Zeya BESS38740 Heights 138kVBRP Zeya BESS LLCBattery storage (stand-alone)255.3Dec 2027Signed; security posted
Shepard Energy Storage# 38900 Hidden Lakes - # 42015 PHR 138 KVShepard Energy Storage LLCBattery storage (stand-alone)256.8Jun 2028Signed; security posted
IEP Blackhawk38740 Heights Substation 138kVIEP Texas Verde II, llcBattery storage (stand-alone)100.0Dec 2026In study
Hacienda Storage38745 Attwater 138kVGalveston Energy Storage LLCBattery storage (stand-alone)205.8Dec 2027In study
Vertus Energy Storage 238830 TNMAINLAND1 138 KVVertus Energy Storage 2 LLCBattery storage (stand-alone)204.9Feb 2028In study
Valcrest BESStap 138 kV 43500 WEBSTR_B138A - 48403 W_GALV01TP_8Flexen USA LLCBattery storage (stand-alone)154.2Dec 2028In study
Hecate Energy Jamaica Wind42000 P. H. Robinson 345kVHecate Energy LLCWind1,029.4Jun 2030In study

No longer listed since August

These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.

  • VERTUS ENERGY STORAGE, battery storage, 207 MW (VERTUS ENERGY STORAGE LLC)

Crowded connection points in Galveston County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Heights (38740) 138 kV 2 requests · 355 MW1 signed; security posted, 1 in study
  • Zeya BESS 23INR0290 · Battery storage · 255 MW · Signed; security posted
  • IEP Blackhawk 25INR0310 · Battery storage · 100 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Galveston County

  • Galveston County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 12, Houston: 5425 Polk St, Ste H, Houston TX 77023-1452, 713-767-3500; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Galveston County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Galveston County.

Permits and reviews for Galveston County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Galveston County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Galveston County connects to the grid

Galveston County is on the ERCOT grid. The projects listed above are in ERCOT's Houston load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Galveston County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Galveston County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 12

Austin · Brazoria · Chambers · Colorado · Fort Bend · Harris · Liberty · Matagorda · Montgomery · Walker · Waller · Wharton

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources