Home › Texas › Galveston County
Galveston County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
10 proposed energy projects from ERCOT's September 2026 report, plus who to call in Galveston County and in TCEQ Region 12 before signing a solar, wind, or battery storage lease.
Check land in Galveston CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Galveston County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Galveston County?
ERCOT's September 2026 interconnection report lists 10 proposed energy projects in Galveston County (1 wind, 8 battery storage and 1 gas), about 2,736 MW in all. 5 of the 10 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.
What stands out in Galveston County
By capacity, battery storage leads in Galveston County with 1,693 MW across 8 projects, followed by wind (1 project, 1,029 MW) and gas (1 project, 14 MW). The largest single project is Hecate Energy Jamaica Wind, a 1,029 MW wind project listed under Hecate Energy LLC, still in study, and its target online date is Jun 2030. Of the 10, 5 are still in ERCOT's study process, 4 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 138 kV (7 projects), 69 kV (1 project) and 345 kV (1 project) (why the voltage matters). Each of the 10 projects is listed under a different company. Target online dates for the projects not yet running span Dec 2026 to Jun 2030. All of them fall in ERCOT's Houston load zone. 1 that was listed in August has since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Air Products GCA39140 TNTxCityMain 69kV (Will be upgraded to 138kV) | Air Products | Gas steam turbine | 14.0 | Dec 2025 | Approved for synchronization |
| SOUTHERN SELECT ENERGY STORAGEBus Name: TNHEIGHTS_1 | SOUTHERN SELECT ENERGY STORAGE LLC | Battery storage (stand-alone) | 204.8 | May 2027 | Signed; security posted |
| Red Egret BESS38820 FREEWAY PARK 138KV | Red Egret LLC | Battery storage (stand-alone) | 310.6 | Nov 2027 | Signed; security posted |
| Zeya BESS38740 Heights 138kV | BRP Zeya BESS LLC | Battery storage (stand-alone) | 255.3 | Dec 2027 | Signed; security posted |
| Shepard Energy Storage# 38900 Hidden Lakes - # 42015 PHR 138 KV | Shepard Energy Storage LLC | Battery storage (stand-alone) | 256.8 | Jun 2028 | Signed; security posted |
| IEP Blackhawk38740 Heights Substation 138kV | IEP Texas Verde II, llc | Battery storage (stand-alone) | 100.0 | Dec 2026 | In study |
| Hacienda Storage38745 Attwater 138kV | Galveston Energy Storage LLC | Battery storage (stand-alone) | 205.8 | Dec 2027 | In study |
| Vertus Energy Storage 238830 TNMAINLAND1 138 KV | Vertus Energy Storage 2 LLC | Battery storage (stand-alone) | 204.9 | Feb 2028 | In study |
| Valcrest BESStap 138 kV 43500 WEBSTR_B138A - 48403 W_GALV01TP_8 | Flexen USA LLC | Battery storage (stand-alone) | 154.2 | Dec 2028 | In study |
| Hecate Energy Jamaica Wind42000 P. H. Robinson 345kV | Hecate Energy LLC | Wind | 1,029.4 | Jun 2030 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- VERTUS ENERGY STORAGE, battery storage, 207 MW (VERTUS ENERGY STORAGE LLC)
Crowded connection points in Galveston County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Heights (38740) 138 kV 2 requests · 355 MW1 signed; security posted, 1 in study
- Zeya BESS 23INR0290 · Battery storage · 255 MW · Signed; security posted
- IEP Blackhawk 25INR0310 · Battery storage · 100 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Galveston County
- Galveston County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 12, Houston: 5425 Polk St, Ste H, Houston TX 77023-1452, 713-767-3500; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Galveston County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Galveston County.
Permits and reviews for Galveston County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Galveston County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Galveston County connects to the grid
Galveston County is on the ERCOT grid. The projects listed above are in ERCOT's Houston load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Galveston County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Galveston County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 12
Austin · Brazoria · Chambers · Colorado · Fort Bend · Harris · Liberty · Matagorda · Montgomery · Walker · Waller · Wharton