Austin County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
14 proposed energy projects from ERCOT's September 2026 report, plus who to call in Austin County and in TCEQ Region 12 before signing a solar, wind, or battery storage lease.
Check land in Austin CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Austin County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Austin County?
ERCOT's September 2026 interconnection report lists 14 proposed energy projects in Austin County (2 solar, 9 battery storage and 3 gas), about 3,729 MW in all. 3 of the 14 have a signed interconnection agreement.
What stands out in Austin County
By capacity, battery storage leads in Austin County with 1,892 MW across 9 projects, followed by gas (3 projects, 1,485 MW) and solar (2 projects, 352 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is EmberYork, a 900 MW gas turbine project listed under EmberYork Energy Center, with an interconnection agreement signed in Dec 2025, and its target online date is Jan 2028. Of the 14, 11 are still in ERCOT's study process, 2 have a signed interconnection agreement but no security posted yet and 1 has posted security or started construction. Every listed connection point is on the 138 kV system (why the voltage matters). Sunrose Renewable Energy LLC is listed on the most projects here (2 of 14); 13 different companies appear in all. Target online dates for the projects not yet running span Feb 2027 to Dec 2029. All of them fall in ERCOT's South load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Wallis BESS2TSP Substation Name - Wallis | Denali Energy Storage LLC | Battery storage (stand-alone) | 9.9 | Feb 2027 | Signed; security posted |
| EmberYorkTAP 138kV WALLIS 44740 - GERBHRT 44700 | EmberYork Energy Center | Gas turbine | 900.0 | Jan 2028 | Signed Dec 2025 |
| Sky Global West Houstontap 138kV 44700 Gebhardt - 44740 Wallis circuit 65 | Sky Global Power Two, LLC | Gas engines | 324.6 | Jun 2028 | Signed Mar 2025 |
| BremRaek BESS7271 LCRA New Bremen 138 kV | BremRaek BESS | Battery storage (stand-alone) | 200.6 | Nov 2027 | In study |
| Symphony BESS46220 PETERS | Symphony BESS, LLC | Battery storage (stand-alone) | 612.0 | Jul 2028 | In study |
| Prost ESSTap 138kV L_PISEK_8_1Y (#7296) - L_WELCOM8_1Y(#7577) | Prost ESS LLC | Battery storage (stand-alone) | 202.7 | Sep 2028 | In study |
| Pamplona SolarTap 138 kV 44740 WALLIS_S65_8 - 44700 GEBHRT_X65B8 Ckt#65 · shared with 1 other request | Karol Solar III | Solar | 42.4 | Oct 2028 | In study |
| Pamplona StorageTap 138 kV 44740 WALLIS_S65_8 - 44700 GEBHRT_X65B8 Ckt#65 · shared with 1 other request | Karol Solar V | Battery storage (paired with solar) | 153.9 | Oct 2028 | In study |
| Saddlehorn Energy StorageTap 138kV 7287 Bellville North - 7291 Highway 36 | Saddlehorn Energy Storage, LLC | Battery storage (stand-alone) | 256.8 | Nov 2028 | In study |
| Agricola BESSTap 138kV GEBHARDT (#44700) - Wallis (#44740) | Agricola BESS LLC | Battery storage (stand-alone) | 205.2 | May 2029 | In study |
| Parula Energy Center7287 Bellville North 138kV | Parula Energy Center | Battery storage (stand-alone) | 250.9 | Jun 2029 | In study |
| Sunrose Renewable Energy Solar SLFTap 138kV #44740 WALLIS - #44700 GEBHRT | Sunrose Renewable Energy LLC | Solar | 309.9 | Jul 2029 | In study |
| Sunrose Renewable Energy Storage SLFTap 138kV 44740 WALLIS - 44700 GEBHRT | Sunrose Renewable Energy LLC | Battery storage (paired with solar) | Self-limiting | Jul 2029 | In study |
| Homestead Power (TEF-Due Diligence)138 kV New Bremen #7271 | Homestead Power LLC | Gas turbine | 260.3 | Dec 2029 | In study |
Crowded connection points in Austin County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Wallis (44740) 138 kV 8 requests · 2,039 MW · 7 in Austin County, 1 in Wharton5 in study, 2 signed, 1 signed; security posted
- Raven Storage 24INR0210 · Battery storage · 104 MW · Signed; security posted · Wharton
- EmberYork 28INR0089 · Gas turbine · 900 MW · Signed Dec 2025
- Sky Global West Houston 26INR0519 · Gas engines · 325 MW · Signed Mar 2025
- Sunrose Renewable Energy Solar SLF 28INR0061 · Solar · 310 MW · In study
- Agricola BESS 28INR0265 · Battery storage · 205 MW · In study
- Pamplona Storage 28INR0226 · Battery storage · 154 MW · In study
- Pamplona Solar 26INR0229 · Solar · 42 MW · In study
- Sunrose Renewable Energy Storage SLF 28INR0066 · Battery storage · 0 MW · In study
GEBHRT_X65B8 (44700) 138 kV 7 requests · 1,936 MW5 in study, 2 signed
- EmberYork 28INR0089 · Gas turbine · 900 MW · Signed Dec 2025
- Sky Global West Houston 26INR0519 · Gas engines · 325 MW · Signed Mar 2025
- Sunrose Renewable Energy Solar SLF 28INR0061 · Solar · 310 MW · In study
- Agricola BESS 28INR0265 · Battery storage · 205 MW · In study
- Pamplona Storage 28INR0226 · Battery storage · 154 MW · In study
- Pamplona Solar 26INR0229 · Solar · 42 MW · In study
- Sunrose Renewable Energy Storage SLF 28INR0066 · Battery storage · 0 MW · In study
Lcra Bremen (7271) 138 kV 2 requests · 461 MW2 in study
- Homestead Power (TEF-Due Diligence) 29INR0041 · Gas turbine · 260 MW · In study
- BremRaek BESS 26INR0427 · Battery storage · 201 MW · In study
Bellville North (7287) 138 kV 2 requests · 508 MW2 in study
- Saddlehorn Energy Storage 28INR0186 · Battery storage · 257 MW · In study
- Parula Energy Center 27INR0252 · Battery storage · 251 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Austin County
- Austin County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 12, Houston: 5425 Polk St, Ste H, Houston TX 77023-1452, 713-767-3500; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Austin County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Austin County.
Permits and reviews for Austin County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Austin County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Austin County connects to the grid
Austin County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Austin County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Austin County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 12
Brazoria · Chambers · Colorado · Fort Bend · Galveston · Harris · Liberty · Matagorda · Montgomery · Walker · Waller · Wharton