Home › Texas › Van Zandt County
Van Zandt County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
8 proposed energy projects from ERCOT's September 2026 report, plus who to call in Van Zandt County and in TCEQ Region 5 before signing a solar, wind, or battery storage lease.
Check land in Van Zandt CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Van Zandt County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Van Zandt County?
ERCOT's September 2026 interconnection report lists 8 proposed energy projects in Van Zandt County (2 solar and 6 battery storage), about 986 MW in all. 4 of the 8 have a signed interconnection agreement.
What stands out in Van Zandt County
By capacity, battery storage leads in Van Zandt County with 714 MW across 6 projects, followed by solar (2 projects, 272 MW). The largest single project is Whiskey BESS, a 154 MW stand-alone battery storage project listed under Whiskey BESS LLC, with an interconnection agreement signed in Mar 2025, and its target online date is Jul 2027. Of the 8, 4 are still in ERCOT's study process, 2 have a signed interconnection agreement but no security posted yet and 2 have posted security or started construction. Every listed connection point is on the 138 kV system (why the voltage matters). BT DJ4M Solar, LLC and Tempus Power management LLC are each listed on 2 projects; 6 different companies appear in all. Target online dates for the projects not yet running span Apr 2027 to Mar 2030. All of them fall in ERCOT's North load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Amador Storage6833 Explorer Switching Station 138kV | BT Amador Storage, LLC | Battery storage (stand-alone) | 102.4 | Apr 2027 | Signed; security posted |
| Caney Creek SolarTap 138kV 6829 Glen Pine - 6833 Explorer | HEP Aquamarine Holdings LLC | Solar | 121.0 | Jun 2027 | Signed; security posted |
| Whiskey BESS6828 Canton Tap 138 kV | Whiskey BESS LLC | Battery storage (stand-alone) | 153.7 | Jul 2027 | Signed Mar 2025 |
| Zorro BESS138 kV Ben Wheeler (Bus# 6852) | ZORRO BESS LLC | Battery storage (stand-alone) | 153.7 | Aug 2027 | Signed Mar 2025 |
| Edgewood BESS 1Tap Edgewood 138kV bus(3181) to CANTNSW_8 (3174) | Tempus Power management LLC | Battery storage (stand-alone) | 102.1 | Mar 2028 | In study |
| Edgewood BESS 2Tap Edgewood 138kV bus(3181) to 3174 | Tempus Power management LLC | Battery storage (stand-alone) | 102.1 | Mar 2028 | In study |
| Goldfinch SolarTap Connection Bus 2485 Poetry Switch to 3103 Shamburger Switch | BT DJ4M Solar, LLC | Solar | 150.8 | Mar 2029 | In study |
| Goldfinch StorageTap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch | BT DJ4M Solar, LLC | Battery storage (paired with solar) | 100.4 | Mar 2030 | In study |
Crowded connection points in Van Zandt County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Explorer (6833) 138 kV 2 requests · 223 MW2 signed; security posted
- Caney Creek Solar 23INR0045 · Solar · 121 MW · Signed; security posted
- Amador Storage 24INR0472 · Battery storage · 102 MW · Signed; security posted
Poetry (2485) 345 kV 4 requests · 510 MW · 2 in Van Zandt County, 2 in Kaufman3 in study, 1 signed
- Mystic Springs Renewable Energy Solar SLF 24INR0339 · Solar · 259 MW · Signed Oct 2025 · Kaufman
- Goldfinch Solar 26INR0253 · Solar · 151 MW · In study
- Goldfinch Storage 26INR0254 · Battery storage · 100 MW · In study
- Mystic Springs Renewable Energy Storage SLF 24INR0340 · Battery storage · 0 MW · In study · Kaufman
Bus 3181 (3181) 138 kV 2 requests · 204 MW2 in study
- Edgewood BESS 1 27INR0317 · Battery storage · 102 MW · In study
- Edgewood BESS 2 27INR0413 · Battery storage · 102 MW · In study
Canton (3174) 138 kV 3 requests · 404 MW · 2 in Van Zandt County, 1 in Kaufman3 in study
- Slash Pine Storage 29INR0250 · Battery storage · 200 MW · In study · Kaufman
- Edgewood BESS 1 27INR0317 · Battery storage · 102 MW · In study
- Edgewood BESS 2 27INR0413 · Battery storage · 102 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Van Zandt County
- Van Zandt County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 5, Tyler: 2916 Teague Dr, Tyler TX 75701-3734, 903-535-5100; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Van Zandt County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Van Zandt County.
Permits and reviews for Van Zandt County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Van Zandt County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Van Zandt County connects to the grid
Van Zandt County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Van Zandt County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Van Zandt County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 5
Anderson · Bowie · Camp · Cass · Cherokee · Delta · Franklin · Gregg · Harrison · Henderson · Hopkins · Lamar · Marion · Morris · Panola · Rains · Red River · Rusk · Smith · Titus · Upshur · Wood