Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
13 proposed energy projects from ERCOT's September 2026 report, plus who to call in Hopkins County and in TCEQ Region 5 before signing a solar, wind, or battery storage lease.
Check land in Hopkins CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Hopkins County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Hopkins County?
ERCOT's September 2026 interconnection report lists 13 proposed energy projects in Hopkins County (8 solar and 5 battery storage), about 2,219 MW in all. 5 of the 13 have a signed interconnection agreement, and 2 have been approved for energization or synchronization.
What stands out in Hopkins County
By capacity, solar leads in Hopkins County with 1,281 MW across 8 projects, followed by battery storage (5 projects, 938 MW). The largest single project is Dairyland Storage, a 302 MW stand-alone battery storage project listed under ENGIE IR Holdings LLC, still in study, and its target online date is Apr 2029. Of the 13, 8 are still in ERCOT's study process, 2 have a signed interconnection agreement but no security posted yet, 1 has posted security or started construction and 2 are approved for energization or synchronization. Connection points are mostly at 345 kV (10 projects) and 138 kV (3 projects) (why the voltage matters). BLUE STONE RENEWABLE XXI LLC and Palomino Renewables are each listed on 2 projects; 11 different companies appear in all. Target online dates for the projects not yet running span May 2027 to Sep 2029. All of them fall in ERCOT's North load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Cartwheel BESS 1Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch · shared with 1 other request | Cartwheel BESS, LLC | Battery storage (stand-alone) | 154.2 | Dec 2026 | Approved for synchronization |
| Pine Forest SolarMonticello Switch – Allen Switch 345 kV Line | Pine Forest Solar I, LLC | Solar | 301.5 | Feb 2027 | Approved for synchronization |
| Lucky 7 SolarTap 345kV 2621 Sandy Ranch Switch - 2464 CASH SWITCH | Lucky 7 Solar Farm LLC | Solar | 101.3 | Sep 2027 | Signed; security posted |
| Cedar Range Solar“Sweet Tea” 345 kV switchyard that taps the Allen Switch – Stouts C... | Cedar Range, LLC | Solar | 150.6 | Sep 2027 | Signed Jul 2025 |
| Blarney Solar138 kV Ridgeway Switch | Blarney Solar Project LLC | Solar | 81.5 | Oct 2027 | Signed Apr 2024 |
| CH Solterra LLCTap 138kV 11796 White Oak POI - 11797 Brinker POI | CH Solterra LLC | Solar | 143.0 | May 2027 | In study |
| Cartwheel BESS 2Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch · shared with 1 other request | RWE Renewables | Battery storage (stand-alone) | 156.9 | Jun 2028 | In study |
| Palomino SolarTap 345kV 1695 Monticello - 1697 Sulphur Springs · shared with 1 other request | Palomino Renewables | Solar | 301.2 | Dec 2028 | In study |
| Dairyland StorageTo 345 kV Birthright Station (#11684) | ENGIE IR Holdings LLC | Battery storage (stand-alone) | 301.8 | Apr 2029 | In study |
| Palomino StorageTap 345kV 1695 Monticello - 1697 Sulphur Springs · shared with 1 other request | Palomino Renewables | Battery storage (paired with solar) | 155.1 | May 2029 | In study |
| JUNIPERUS BESSTap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621) · shared with 1 other request | BLUE STONE RENEWABLE XXI LLC | Battery storage (paired with solar) | 169.6 | Jul 2029 | In study |
| JUNIPERUSSSTap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621) · shared with 1 other request | BLUE STONE RENEWABLE XXI LLC | Solar | 80.3 | Jul 2029 | In study |
| Project Alpha Solar138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPR... | SGE Alpha Energy LLC | Solar | 122.0 | Sep 2029 | In study |
Crowded connection points in Hopkins County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Cash (2464) 345 kV 6 requests · 866 MW · 5 in Hopkins County, 1 in Hunt4 in study, 1 approved for synchronization, 1 signed; security posted
- Cartwheel BESS 1 23INR0494 · Battery storage · 154 MW · Approved for synchronization
- Lucky 7 Solar 26INR0409 · Solar · 101 MW · Signed; security posted
- Fermata BESS 27INR0461 · Battery storage · 204 MW · In study · Hunt
- JUNIPERUS BESS 27INR0097 · Battery storage · 170 MW · In study
- Cartwheel BESS 2 23INR0495 · Battery storage · 157 MW · In study
- JUNIPERUSSS 26INR0304 · Solar · 80 MW · In study
Sulphur Springs (1697) 345 kV 4 requests · 767 MW3 in study, 1 approved for synchronization
- Cartwheel BESS 1 23INR0494 · Battery storage · 154 MW · Approved for synchronization
- Palomino Solar 29INR0056 · Solar · 301 MW · In study
- Cartwheel BESS 2 23INR0495 · Battery storage · 157 MW · In study
- Palomino Storage 29INR0057 · Battery storage · 155 MW · In study
Sandy Ranch (2621) 345 kV 3 requests · 351 MW2 in study, 1 signed; security posted
- Lucky 7 Solar 26INR0409 · Solar · 101 MW · Signed; security posted
- JUNIPERUS BESS 27INR0097 · Battery storage · 170 MW · In study
- JUNIPERUSSS 26INR0304 · Solar · 80 MW · In study
Moses Ckts (1695) 345 kV 9 requests · 3,642 MW · 2 in Hopkins County, 7 in Lamar, Franklin4 in study, 3 approved for synchronization, 2 signed; security posted
- Delilah Solar 1 22INR0202 · Solar · 300 MW · Approved for synchronization · Lamar
- Samson Solar 1 21INR0221 · Solar · 250 MW · Approved for synchronization · Lamar
- Samson Solar 3 21INR0491 · Solar · 250 MW · Approved for synchronization · Lamar
- Lupinus Solar 1 24INR0150 · Solar · 162 MW · Signed; security posted · Franklin
- Lupinus Storage 1 24INR0153 · Battery storage · 84 MW · Signed; security posted · Franklin
- Prairie Ridge (Gas - CC) 30INR0071 · Gas combined cycle · 1,660 MW · In study · Franklin
- North Royal Thermal (TEF- Due Diligence) 28INR0087 · Gas turbine · 479 MW · In study · Lamar
- Palomino Solar 29INR0056 · Solar · 301 MW · In study
- Palomino Storage 29INR0057 · Battery storage · 155 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Hopkins County
- Hopkins County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 5, Tyler: 2916 Teague Dr, Tyler TX 75701-3734, 903-535-5100; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Hopkins County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Hopkins County.
Permits and reviews for Hopkins County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Hopkins County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Hopkins County connects to the grid
Hopkins County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Hopkins County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Hopkins County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 5
Anderson · Bowie · Camp · Cass · Cherokee · Delta · Franklin · Gregg · Harrison · Henderson · Lamar · Marion · Morris · Panola · Rains · Red River · Rusk · Smith · Titus · Upshur · Van Zandt · Wood