Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Hopkins County

Hopkins County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects13
Total capacity2,219MW
Signed agreements5of 13
New since August0requests

13 proposed energy projects from ERCOT's September 2026 report, plus who to call in Hopkins County and in TCEQ Region 5 before signing a solar, wind, or battery storage lease.

Check land in Hopkins CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Hopkins County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Hopkins County?

ERCOT's September 2026 interconnection report lists 13 proposed energy projects in Hopkins County (8 solar and 5 battery storage), about 2,219 MW in all. 5 of the 13 have a signed interconnection agreement, and 2 have been approved for energization or synchronization.

What stands out in Hopkins County

By capacity, solar leads in Hopkins County with 1,281 MW across 8 projects, followed by battery storage (5 projects, 938 MW). The largest single project is Dairyland Storage, a 302 MW stand-alone battery storage project listed under ENGIE IR Holdings LLC, still in study, and its target online date is Apr 2029. Of the 13, 8 are still in ERCOT's study process, 2 have a signed interconnection agreement but no security posted yet, 1 has posted security or started construction and 2 are approved for energization or synchronization. Connection points are mostly at 345 kV (10 projects) and 138 kV (3 projects) (why the voltage matters). BLUE STONE RENEWABLE XXI LLC and Palomino Renewables are each listed on 2 projects; 11 different companies appear in all. Target online dates for the projects not yet running span May 2027 to Sep 2029. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Cartwheel BESS 1Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch · shared with 1 other requestCartwheel BESS, LLCBattery storage (stand-alone)154.2Dec 2026Approved for synchronization
Pine Forest SolarMonticello Switch – Allen Switch 345 kV LinePine Forest Solar I, LLCSolar301.5Feb 2027Approved for synchronization
Lucky 7 SolarTap 345kV 2621 Sandy Ranch Switch - 2464 CASH SWITCHLucky 7 Solar Farm LLCSolar101.3Sep 2027Signed; security posted
Cedar Range Solar“Sweet Tea” 345 kV switchyard that taps the Allen Switch – Stouts C...Cedar Range, LLCSolar150.6Sep 2027Signed Jul 2025
Blarney Solar138 kV Ridgeway SwitchBlarney Solar Project LLCSolar81.5Oct 2027Signed Apr 2024
CH Solterra LLCTap 138kV 11796 White Oak POI - 11797 Brinker POICH Solterra LLCSolar143.0May 2027In study
Cartwheel BESS 2Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch · shared with 1 other requestRWE RenewablesBattery storage (stand-alone)156.9Jun 2028In study
Palomino SolarTap 345kV 1695 Monticello - 1697 Sulphur Springs · shared with 1 other requestPalomino RenewablesSolar301.2Dec 2028In study
Dairyland StorageTo 345 kV Birthright Station (#11684)ENGIE IR Holdings LLCBattery storage (stand-alone)301.8Apr 2029In study
Palomino StorageTap 345kV 1695 Monticello - 1697 Sulphur Springs · shared with 1 other requestPalomino RenewablesBattery storage (paired with solar)155.1May 2029In study
JUNIPERUS BESSTap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621) · shared with 1 other requestBLUE STONE RENEWABLE XXI LLCBattery storage (paired with solar)169.6Jul 2029In study
JUNIPERUSSSTap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621) · shared with 1 other requestBLUE STONE RENEWABLE XXI LLCSolar80.3Jul 2029In study
Project Alpha Solar138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPR...SGE Alpha Energy LLCSolar122.0Sep 2029In study

Crowded connection points in Hopkins County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Cash (2464) 345 kV 6 requests · 866 MW · 5 in Hopkins County, 1 in Hunt4 in study, 1 approved for synchronization, 1 signed; security posted
  • Cartwheel BESS 1 23INR0494 · Battery storage · 154 MW · Approved for synchronization
  • Lucky 7 Solar 26INR0409 · Solar · 101 MW · Signed; security posted
  • Fermata BESS 27INR0461 · Battery storage · 204 MW · In study · Hunt
  • JUNIPERUS BESS 27INR0097 · Battery storage · 170 MW · In study
  • Cartwheel BESS 2 23INR0495 · Battery storage · 157 MW · In study
  • JUNIPERUSSS 26INR0304 · Solar · 80 MW · In study
Sulphur Springs (1697) 345 kV 4 requests · 767 MW3 in study, 1 approved for synchronization
  • Cartwheel BESS 1 23INR0494 · Battery storage · 154 MW · Approved for synchronization
  • Palomino Solar 29INR0056 · Solar · 301 MW · In study
  • Cartwheel BESS 2 23INR0495 · Battery storage · 157 MW · In study
  • Palomino Storage 29INR0057 · Battery storage · 155 MW · In study
Sandy Ranch (2621) 345 kV 3 requests · 351 MW2 in study, 1 signed; security posted
  • Lucky 7 Solar 26INR0409 · Solar · 101 MW · Signed; security posted
  • JUNIPERUS BESS 27INR0097 · Battery storage · 170 MW · In study
  • JUNIPERUSSS 26INR0304 · Solar · 80 MW · In study
Moses Ckts (1695) 345 kV 9 requests · 3,642 MW · 2 in Hopkins County, 7 in Lamar, Franklin4 in study, 3 approved for synchronization, 2 signed; security posted
  • Delilah Solar 1 22INR0202 · Solar · 300 MW · Approved for synchronization · Lamar
  • Samson Solar 1 21INR0221 · Solar · 250 MW · Approved for synchronization · Lamar
  • Samson Solar 3 21INR0491 · Solar · 250 MW · Approved for synchronization · Lamar
  • Lupinus Solar 1 24INR0150 · Solar · 162 MW · Signed; security posted · Franklin
  • Lupinus Storage 1 24INR0153 · Battery storage · 84 MW · Signed; security posted · Franklin
  • Prairie Ridge (Gas - CC) 30INR0071 · Gas combined cycle · 1,660 MW · In study · Franklin
  • North Royal Thermal (TEF- Due Diligence) 28INR0087 · Gas turbine · 479 MW · In study · Lamar
  • Palomino Solar 29INR0056 · Solar · 301 MW · In study
  • Palomino Storage 29INR0057 · Battery storage · 155 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Hopkins County

  • Hopkins County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 5, Tyler: 2916 Teague Dr, Tyler TX 75701-3734, 903-535-5100; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Hopkins County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Hopkins County.

Permits and reviews for Hopkins County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Hopkins County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Hopkins County connects to the grid

Hopkins County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Hopkins County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Hopkins County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 5

Anderson · Bowie · Camp · Cass · Cherokee · Delta · Franklin · Gregg · Harrison · Henderson · Lamar · Marion · Morris · Panola · Rains · Red River · Rusk · Smith · Titus · Upshur · Van Zandt · Wood

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources