Rusk County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
5 proposed energy projects from ERCOT's September 2026 report, plus who to call in Rusk County and in TCEQ Region 5 before signing a solar, wind, or battery storage lease.
Check land in Rusk CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Rusk County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Rusk County?
ERCOT's September 2026 interconnection report lists 5 proposed energy projects in Rusk County (3 solar and 2 battery storage), about 940 MW in all. 1 of the 5 has a signed interconnection agreement, and 1 has been approved for energization or synchronization.
What stands out in Rusk County
By capacity, battery storage leads in Rusk County with 511 MW across 2 projects, followed by solar (3 projects, 429 MW). The largest single project is Brantley Branch Batt, a 302 MW stand-alone battery storage project listed under Brantley Branch LLC, still in study, and its target online date is Feb 2029. Of the 5, 4 are still in ERCOT's study process and 1 is approved for energization or synchronization. Every listed connection point is on the 345 kV system (why the voltage matters). Each of the 5 projects is listed under a different company. Target online dates for the projects not yet running span Sep 2027 to Feb 2029. All of them fall in ERCOT's North load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Dry Creek Solar Itap 345kV 3100 Martin Lake - 3105 Elkton | OAK HILL SOLAR LLC | Solar | 201.1 | Jan 2026 | Approved for synchronization |
| Zeus Rusk BESSTap 345kV 3109 Stryker to 3100 Martin Lake · shared with 1 other request | Rusk BESS, LLC | Battery storage (paired with solar) | 208.8 | Sep 2027 | In study |
| Zeus Rusk SolarTap 345kV 3109 Stryker to 3100 Martin Lake · shared with 1 other request | Rusk Solar, LLC | Solar | 26.8 | Sep 2027 | In study |
| Dry Creek Solar IIDorsett 345 kV Switching Station(tap 345 kV 3100 Martin Lake - 3105... | Oak Hill Solar II LLC | Solar | 201.3 | Feb 2028 | In study |
| Brantley Branch BattMt. Enterprise (Bus # 3116) – Martin Lake 345kv Line (Bus # 3100 | Brantley Branch LLC | Battery storage (stand-alone) | 302.4 | Feb 2029 | In study |
Crowded connection points in Rusk County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Martin Lake (3100) 345 kV 5 requests · 940 MW4 in study, 1 approved for synchronization
- Dry Creek Solar I 23INR0286 · Solar · 201 MW · Approved for synchronization
- Brantley Branch Batt 22INR0332 · Battery storage · 302 MW · In study
- Zeus Rusk BESS 25INR0591 · Battery storage · 209 MW · In study
- Dry Creek Solar II 27INR0488 · Solar · 201 MW · In study
- Zeus Rusk Solar 25INR0590 · Solar · 27 MW · In study
Elkton (3105) 345 kV 6 requests · 703 MW · 2 in Rusk County, 4 in Kaufman4 in study, 2 approved for synchronization
- Dry Creek Solar I 23INR0286 · Solar · 201 MW · Approved for synchronization
- Erika Solar 24INR0303 · Solar · 200 MW · Approved for synchronization · Kaufman
- Dry Creek Solar II 27INR0488 · Solar · 201 MW · In study
- Erika BESS 27INR0531 · Battery storage · 100 MW · In study · Kaufman
- Solarville Wind SLF 28INR0431 · Wind · 0 MW · In study · Kaufman
- Solarville BESS SLF 28INR0432 · Battery storage · 0 MW · In study · Kaufman
Stryker (3109) 345 kV 4 requests · 1,696 MW · 2 in Rusk County, 2 in Cherokee, Nacogdoches3 in study, 1 signed; security posted
- Spindletop Solar 27INR0313 · Solar · 286 MW · Signed; security posted · Nacogdoches
- Eagle Pines Gas 18INR0009 · Gas combined cycle · 1,174 MW · In study · Cherokee
- Zeus Rusk BESS 25INR0591 · Battery storage · 209 MW · In study
- Zeus Rusk Solar 25INR0590 · Solar · 27 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Rusk County
- Rusk County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 5, Tyler: 2916 Teague Dr, Tyler TX 75701-3734, 903-535-5100; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Rusk County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Rusk County.
Permits and reviews for Rusk County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Rusk County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Rusk County connects to the grid
Rusk County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Rusk County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Rusk County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 5
Anderson · Bowie · Camp · Cass · Cherokee · Delta · Franklin · Gregg · Harrison · Henderson · Hopkins · Lamar · Marion · Morris · Panola · Rains · Red River · Smith · Titus · Upshur · Van Zandt · Wood