Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Franklin County

Franklin County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects7
Total capacity2,374MW
Signed agreements4of 7
New since August0requests

7 proposed energy projects from ERCOT's September 2026 report, plus who to call in Franklin County and in TCEQ Region 5 before signing a solar, wind, or battery storage lease.

Check land in Franklin CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Franklin County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Franklin County?

ERCOT's September 2026 interconnection report lists 7 proposed energy projects in Franklin County (3 solar, 3 battery storage and 1 gas), about 2,374 MW in all. 4 of the 7 have a signed interconnection agreement.

What stands out in Franklin County

By capacity, gas leads in Franklin County with 1,660 MW across 1 project, followed by solar (3 projects, 505 MW) and battery storage (3 projects, 209 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Prairie Ridge (Gas - CC), a 1,660 MW gas combined cycle project listed under Tenaska Power Generation, LLC, still in study, and its target online date is Jun 2032. Of the 7, 3 are still in ERCOT's study process and 4 have posted security or started construction. Every listed connection point is on the 345 kV system (why the voltage matters). Lazy Frog Solar, LLC, Lupinus Solar 2, LLC and Lupinus Solar, LLC are each listed on 2 projects; 4 different companies appear in all. Target online dates for the projects not yet running span Apr 2027 to Jun 2032. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Lupinus Solar 2Hagansport Switch (old Monticello Tap bus# 1794) · shared with 1 other requestLupinus Solar 2, LLCSolar242.3Apr 2027Signed; security posted
Lupinus Storage 2Hagansport Switch (old Monticello Tap bus# 1794) · shared with 1 other requestLupinus Solar 2, LLCBattery storage (paired with solar)124.5Apr 2027Signed; security posted
Lupinus Solar 1Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES · shared with 1 other requestLupinus Solar, LLCSolar162.3Sep 2027Signed; security posted
Lupinus Storage 1Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES · shared with 1 other requestLupinus Solar, LLCBattery storage (paired with solar)84.0Sep 2027Signed; security posted
Lazy Frog Solar SLF11688 Thorn Tree Switch 345kV · shared with 1 other requestLazy Frog Solar, LLCSolar100.4Apr 2028In study
Lazy Frog Storage SLF11688 Thorn Tree Switch 345kV · shared with 1 other requestLazy Frog Solar, LLCBattery storage (paired with solar)Self-limitingApr 2028In study
Prairie Ridge (Gas - CC)Tap 345 kV 11699 Woodard – 1695 MonticelloTenaska Power Generation, LLCGas combined cycle1,660.4Jun 2032In study

Crowded connection points in Franklin County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Woodard (11699) 345 kV 6 requests · 2,707 MW · 3 in Franklin County, 3 in Lamar2 signed; security posted, 2 signed, 2 in study
  • Lupinus Solar 1 24INR0150 · Solar · 162 MW · Signed; security posted
  • Lupinus Storage 1 24INR0153 · Battery storage · 84 MW · Signed; security posted
  • Star Dairy Storage 25INR0334 · Battery storage · 205 MW · Signed Dec 2024 · Lamar
  • Star Dairy Solar 25INR0164 · Solar · 116 MW · Signed Dec 2024 · Lamar
  • Prairie Ridge (Gas - CC) 30INR0071 · Gas combined cycle · 1,660 MW · In study
  • North Royal Thermal (TEF- Due Diligence) 28INR0087 · Gas turbine · 479 MW · In study · Lamar
Moses Ckts (1695) 345 kV 9 requests · 3,642 MW · 3 in Franklin County, 6 in Lamar, Hopkins4 in study, 3 approved for synchronization, 2 signed; security posted
  • Delilah Solar 1 22INR0202 · Solar · 300 MW · Approved for synchronization · Lamar
  • Samson Solar 1 21INR0221 · Solar · 250 MW · Approved for synchronization · Lamar
  • Samson Solar 3 21INR0491 · Solar · 250 MW · Approved for synchronization · Lamar
  • Lupinus Solar 1 24INR0150 · Solar · 162 MW · Signed; security posted
  • Lupinus Storage 1 24INR0153 · Battery storage · 84 MW · Signed; security posted
  • Prairie Ridge (Gas - CC) 30INR0071 · Gas combined cycle · 1,660 MW · In study
  • North Royal Thermal (TEF- Due Diligence) 28INR0087 · Gas turbine · 479 MW · In study · Lamar
  • Palomino Solar 29INR0056 · Solar · 301 MW · In study · Hopkins
  • Palomino Storage 29INR0057 · Battery storage · 155 MW · In study · Hopkins
Old Monticello (1794) 2 requests · 367 MW2 signed; security posted
  • Lupinus Solar 2 24INR0154 · Solar · 242 MW · Signed; security posted
  • Lupinus Storage 2 24INR0155 · Battery storage · 125 MW · Signed; security posted
Ttrsw (11688) 345 kV 4 requests · 621 MW · 2 in Franklin County, 2 in Lamar2 approved for synchronization, 2 in study
  • Delilah Solar 2 22INR0203 · Solar · 318 MW · Approved for synchronization · Lamar
  • Samson Solar 2 21INR0490 · Solar · 203 MW · Approved for synchronization · Lamar
  • Lazy Frog Solar SLF 25INR0504 · Solar · 100 MW · In study
  • Lazy Frog Storage SLF 25INR0506 · Battery storage · 0 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Franklin County

  • Franklin County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 5, Tyler: 2916 Teague Dr, Tyler TX 75701-3734, 903-535-5100; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Franklin County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Franklin County.

Permits and reviews for Franklin County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Franklin County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Franklin County connects to the grid

Franklin County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Franklin County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Franklin County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 5

Anderson · Bowie · Camp · Cass · Cherokee · Delta · Gregg · Harrison · Henderson · Hopkins · Lamar · Marion · Morris · Panola · Rains · Red River · Rusk · Smith · Titus · Upshur · Van Zandt · Wood

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources