Henderson County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
6 proposed energy projects from ERCOT's September 2026 report, plus who to call in Henderson County and in TCEQ Region 5 before signing a solar, wind, or battery storage lease.
Check land in Henderson CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Henderson County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Henderson County?
ERCOT's September 2026 interconnection report lists 6 proposed energy projects in Henderson County (1 solar and 5 battery storage), about 1,189 MW in all. 2 of the 6 have a signed interconnection agreement.
What stands out in Henderson County
By capacity, battery storage leads in Henderson County with 1,088 MW across 5 projects, followed by solar (1 project, 101 MW). The largest single project is Wild Paw Storage, a 301 MW stand-alone battery storage project listed under Wild Paw Energy Center, LLC, still in study, and its target online date is Sep 2028. Of the 6, 4 are still in ERCOT's study process and 2 have posted security or started construction. Connection points are mostly at 138 kV (5 projects) and 345 kV (1 project) (why the voltage matters). Each of the 6 projects is listed under a different company. Target online dates for the projects not yet running span Mar 2026 to Jul 2029. All of them fall in ERCOT's North load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Anatole Renewable Energy Storage(Bus# 6951) Eustace Southeast 138kV Substation (owned by Rayburn El... | Anatole Renewable Energy LLC | Battery storage (stand-alone) | 207.8 | Jun 2027 | Under construction |
| Musgravite SolarTap 138 kV (6855) Coffee - (6849) New York. | Solex Ridge, LLC | Solar | 100.6 | Nov 2027 | Signed; security posted |
| Sloan Storage3179 Pauline 138kV | Sloan Energy Storage LLC | Battery storage (stand-alone) | 200.9 | Mar 2026 date passed; status per ERCOT | In study |
| Wild Paw StorageTap 345kV 3124 Trinidad - 3130 Forest Grove | Wild Paw Energy Center, LLC | Battery storage (stand-alone) | 301.2 | Sep 2028 | In study |
| Old Fiddler Energy Storage3233 Foggle Switch 138 kV | Old Fiddler Energy Storage LLC | Battery storage (stand-alone) | 224.6 | Apr 2029 | In study |
| Kit Fox StorageWalton Switch (6899) 138KV | Kit Fox Storage, LLC | Battery storage (stand-alone) | 153.6 | Jul 2029 | In study |
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Henderson County
- Henderson County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 5, Tyler: 2916 Teague Dr, Tyler TX 75701-3734, 903-535-5100; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Henderson County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Henderson County.
Permits and reviews for Henderson County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Henderson County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Henderson County connects to the grid
Henderson County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Henderson County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Henderson County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.