Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Anderson County

Anderson County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects9
Total capacity4,645MW
Signed agreements3of 9
New since August0requests

9 proposed energy projects from ERCOT's September 2026 report, plus who to call in Anderson County and in TCEQ Region 5 before signing a solar, wind, or battery storage lease.

Check land in Anderson CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Anderson County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Anderson County?

ERCOT's September 2026 interconnection report lists 9 proposed energy projects in Anderson County (2 solar, 4 battery storage and 3 gas), about 4,645 MW in all. 3 of the 9 have a signed interconnection agreement.

What stands out in Anderson County

By capacity, gas leads in Anderson County with 3,789 MW across 3 projects, followed by battery storage (4 projects, 518 MW) and solar (2 projects, 338 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Mule Deer Run Gas II, a 1,263 MW gas combined cycle project listed under Anderson Energy Center, LLC, still in study, and its target online date is Jul 2032. Of the 9, 6 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 2 have posted security or started construction. Connection points are mostly at 138 kV (6 projects) and 345 kV (3 projects) (why the voltage matters). The single most-used connection point is #3308 Pin Oak 345KV, shared by 3 projects. Anderson Energy Center, LLC is listed on the most projects here (3 of 9); 6 different companies appear in all. Target online dates for the projects not yet running span May 2027 to Jul 2032. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Brotherton Storage6937 Tucker Sub 138kVBT Brotherton Storage, LLCBattery storage (stand-alone)176.1May 2027Signed; security posted
Pham BESSTap 138kV 3281 TENNCLNY_8 - 3499 BLACKFTAP_8ASB1, LLCBattery storage (stand-alone)133.0Sep 2028Signed; security posted
Skull Creek SolarTap 138kV 3281 Tennessee Colony - 3499 BlackfootSkull Creek Solar, LLCSolar137.0Jun 2027Signed May 2024
ALWEST BESS3114 Paltalco 138kVCastleman PowerBattery storage (stand-alone)208.6Apr 2028In study
Lumen Farm BESS SLFTap 138kV 3325 Blackburn Switch – 3272 Palestine · shared with 1 other requestNeches Solar, LLCBattery storage (paired with solar)Self-limitingSep 2028In study
Lumen Farm Solar SLFTap 138kV 3325 Blackburn Switch – 3272 Palestine · shared with 1 other requestNeches Solar, LLCSolar201.0Sep 2028In study
Mule Deer Run Gas#3308 Pin Oak 345KV · shared with 2 other requestsAnderson Energy Center, LLCGas combined cycle1,263.0Jul 2031In study
Mule Deer Run Gas II#3308 Pin Oak 345KV · shared with 2 other requestsAnderson Energy Center, LLCGas combined cycle1,263.0Jul 2032In study
Mule Deer Run Gas III#3308 Pin Oak 345KV · shared with 2 other requestsAnderson Energy Center, LLCGas combined cycle1,263.0Jul 2032In study

Crowded connection points in Anderson County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Pin Oak (3308) 345 kV 3 requests · 3,789 MW3 in study
  • Mule Deer Run Gas II 31INR0021 · Gas combined cycle · 1,263 MW · In study
  • Mule Deer Run Gas III 31INR0022 · Gas combined cycle · 1,263 MW · In study
  • Mule Deer Run Gas 32INR0003 · Gas combined cycle · 1,263 MW · In study
Tennessee Colony (3281) 138 kV 2 requests · 270 MW1 signed, 1 signed; security posted
  • Pham BESS 28INR0094 · Battery storage · 133 MW · Signed; security posted
  • Skull Creek Solar 23INR0289 · Solar · 137 MW · Signed May 2024
Blackfoot (3499) 138 kV 2 requests · 270 MW1 signed, 1 signed; security posted
  • Pham BESS 28INR0094 · Battery storage · 133 MW · Signed; security posted
  • Skull Creek Solar 23INR0289 · Solar · 137 MW · Signed May 2024
Blackburn (3325) 138 kV 2 requests · 201 MW2 in study
  • Lumen Farm Solar SLF 23INR0439 · Solar · 201 MW · In study
  • Lumen Farm BESS SLF 24INR0450 · Battery storage · 0 MW · In study
Palestine (3272) 138 kV 2 requests · 201 MW2 in study
  • Lumen Farm Solar SLF 23INR0439 · Solar · 201 MW · In study
  • Lumen Farm BESS SLF 24INR0450 · Battery storage · 0 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Anderson County

  • Anderson County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 5, Tyler: 2916 Teague Dr, Tyler TX 75701-3734, 903-535-5100; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Anderson County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Anderson County.

Permits and reviews for Anderson County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Anderson County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Anderson County connects to the grid

Anderson County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Anderson County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Anderson County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 5

Bowie · Camp · Cass · Cherokee · Delta · Franklin · Gregg · Harrison · Henderson · Hopkins · Lamar · Marion · Morris · Panola · Rains · Red River · Rusk · Smith · Titus · Upshur · Van Zandt · Wood

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.