Proposed projects6
Total capacity692MW
Signed agreements1of 6
New since August0requests

6 proposed energy projects from ERCOT's September 2026 report, plus who to call in Zavala County and in TCEQ Region 16 before signing a solar, wind, or battery storage lease.

Check land in Zavala CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Zavala County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Zavala County?

ERCOT's September 2026 interconnection report lists 6 proposed energy projects in Zavala County (2 solar and 4 battery storage), about 692 MW in all. 1 of the 6 has a signed interconnection agreement.

What stands out in Zavala County

By capacity, battery storage leads in Zavala County with 571 MW across 4 projects, followed by solar (2 projects, 121 MW). The largest single project is Bramble Energy Center, a 225 MW stand-alone battery storage project listed under Bramble Energy Center, LLC, still in study, and its target online date is Dec 2028. Of the 6, 5 are still in ERCOT's study process and 1 has a signed interconnection agreement but no security posted yet. Connection points are mostly at 138 kV (3 projects) and 69 kV (2 projects) (why the voltage matters). Each of the 6 projects is listed under a different company. Target online dates for the projects not yet running span Dec 2027 to May 2029. All of them fall in ERCOT's South load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Flying Kite SolarTap the 138 kV La Pryor (#8008) - Poblano (#8009) · shared with 1 other requestFLYING KITE SOLAR LLCSolar80.4Dec 2027Signed Oct 2024
Flying Kite BessTap the 138 kV La Pryor (#8008) - Poblano (#8009) · shared with 1 other requestFlying Kite BESS, LLCBattery storage (paired with solar)104.9Dec 2027In study
La Mancha Solar SLFTap 69kV 5836 NBatesville - 5822 Leona · shared with 1 other requestLa Mancha Solar, LLCSolar40.9Oct 2028In study
La Mancha Storage SLFTap 69kV 5836 NBatesville - 5822 Leona · shared with 1 other requestLa Mancha Storage, LLCBattery storage (paired with solar)40.9Oct 2028In study
Bramble Energy Center8236 West Batesville 138kVBramble Energy Center, LLCBattery storage (stand-alone)225.1Dec 2028In study
SunShiner ESS8008 La Pryor4ASunShiner ESS LLCBattery storage (stand-alone)200.0May 2029In study

Crowded connection points in Zavala County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

LA PRYOR4A (8008) 138 kV 3 requests · 385 MW2 in study, 1 signed
  • Flying Kite Solar 25INR0304 · Solar · 80 MW · Signed Oct 2024
  • SunShiner ESS 26INR0179 · Battery storage · 200 MW · In study
  • Flying Kite Bess 27INR0274 · Battery storage · 105 MW · In study
Bus 8009 (8009) 138 kV 2 requests · 185 MW1 signed, 1 in study
  • Flying Kite Solar 25INR0304 · Solar · 80 MW · Signed Oct 2024
  • Flying Kite Bess 27INR0274 · Battery storage · 105 MW · In study
Nbatesville (5836) 69 kV 2 requests · 82 MW2 in study
  • La Mancha Solar SLF 27INR0380 · Solar · 41 MW · In study
  • La Mancha Storage SLF 27INR0381 · Battery storage · 41 MW · In study
Leona (5822) 69 kV 2 requests · 82 MW2 in study
  • La Mancha Solar SLF 27INR0380 · Solar · 41 MW · In study
  • La Mancha Storage SLF 27INR0381 · Battery storage · 41 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Zavala County

  • Zavala County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 16, Laredo: 707 E Calton Rd, Ste 304, Laredo TX 78041-3887, 956-791-6611; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Zavala County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Zavala County.

Permits and reviews for Zavala County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Zavala County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Zavala County connects to the grid

Zavala County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Zavala County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Zavala County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 16

Dimmit · Duval · Kinney · La Salle · Maverick · McMullen · Val Verde · Webb · Zapata

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources