Kinney County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
8 proposed energy projects from ERCOT's September 2026 report, plus who to call in Kinney County and in TCEQ Region 16 before signing a solar, wind, or battery storage lease.
Check land in Kinney CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Kinney County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Kinney County?
ERCOT's September 2026 interconnection report lists 8 proposed energy projects in Kinney County (3 solar and 5 battery storage), about 709 MW in all. None has a signed interconnection agreement yet.
What stands out in Kinney County
By capacity, solar leads in Kinney County with 507 MW across 3 projects, followed by battery storage (5 projects, 202 MW); 3 self-limiting projects (reported at 0 MW because the resource limits its own output) are listed without a capacity. The largest single project is Longday Solar SLF, a 201 MW solar project listed under Longday Solar, still in study, and its target online date is Dec 2027. Of the 8, 8 are still in ERCOT's study process. Every listed connection point is on the 138 kV system (why the voltage matters). EG Sugarberry LLC, Greenray Solar Corporation and Longday Solar are each listed on 2 projects; 5 different companies appear in all. Target online dates for the projects not yet running span May 2027 to Dec 2029. All of them fall in ERCOT's South load zone. 1 that was listed in August has since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Kinney County EnergyTap 138kV 8252 Brackett4A - 78255 L_PINTCR8_1Y | Kinney County Energy, LLC | Battery storage (stand-alone) | 101.2 | May 2027 | In study |
| Longday BESS SLFTap 138 kV 8252 Brackettville - 8260 Escondido | Longday Solar | Battery storage (paired with solar) | Self-limiting | Dec 2027 | In study |
| Longday Solar SLFTap138 kV 8252 Brackettville - 8260 Escondido | Longday Solar | Solar | 200.8 | Dec 2027 | In study |
| Turkey Creek Battery Energy Storage System SLF7425 ODLASW 138 kV | Greenray Solar Corporation | Battery storage (paired with solar) | Self-limiting | Sep 2028 | In study |
| Turkey Creek Solar SLF7425 ODLASW 138kV | Greenray Solar Corporation | Solar | 180.9 | Sep 2028 | In study |
| Las Moras Battery8252 Brackett 138kV | Las Moras Storage, LLC | Battery storage (stand-alone) | 101.0 | Jul 2029 | In study |
| Sugarberry Solar SLF78255 Pinto Creek 138 kV · shared with 1 other request | EG Sugarberry LLC | Solar | 125.0 | Dec 2029 | In study |
| Sugarberry Storage SLF78255 Pinto Creek 138 kV · shared with 1 other request | EG Sugarberry LLC | Battery storage (paired with solar) | Self-limiting | Dec 2029 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- GALVANIC BESS, battery storage, 100 MW (CED Development Inc)
Crowded connection points in Kinney County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Brackettville (8252) 138 kV 6 requests · 906 MW · 4 in Kinney County, 2 in Maverick4 in study, 2 signed; security posted
- Sugaree Solar 27INR0389 · Solar · 251 MW · Signed; security posted · Maverick
- Althea Storage 27INR0465 · Battery storage · 251 MW · Signed; security posted · Maverick
- Longday Solar SLF 25INR0501 · Solar · 201 MW · In study
- Kinney County Energy 24INR0541 · Battery storage · 101 MW · In study
- Las Moras Battery 23INR0284 · Battery storage · 101 MW · In study
- Longday BESS SLF 25INR0502 · Battery storage · 0 MW · In study
Pinto Creek (78255) 138 kV 3 requests · 226 MW3 in study
- Sugarberry Solar SLF 29INR0251 · Solar · 125 MW · In study
- Kinney County Energy 24INR0541 · Battery storage · 101 MW · In study
- Sugarberry Storage SLF 29INR0252 · Battery storage · 0 MW · In study
Escondido (8260) 138 kV 4 requests · 704 MW · 2 in Kinney County, 2 in Maverick2 in study, 2 signed; security posted
Odlasw (7425) 138 kV 2 requests · 181 MW2 in study
- Turkey Creek Solar SLF 25INR0622 · Solar · 181 MW · In study
- Turkey Creek Battery Energy Storage System SLF 25INR0623 · Battery storage · 0 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Kinney County
- Kinney County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 16, Laredo: 707 E Calton Rd, Ste 304, Laredo TX 78041-3887, 956-791-6611; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Kinney County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Kinney County.
Permits and reviews for Kinney County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Kinney County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Kinney County connects to the grid
Kinney County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Kinney County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Kinney County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 16
Dimmit · Duval · La Salle · Maverick · McMullen · Val Verde · Webb · Zapata · Zavala