Home › Texas › Val Verde County
Val Verde County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
3 proposed energy projects from ERCOT's September 2026 report, plus who to call in Val Verde County and in TCEQ Region 16 before signing a solar, wind, or battery storage lease.
Check land in Val Verde CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Val Verde County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Val Verde County?
ERCOT's September 2026 interconnection report lists 3 proposed energy projects in Val Verde County (2 solar and 1 battery storage), about 475 MW in all. None has a signed interconnection agreement yet.
What stands out in Val Verde County
By capacity, solar leads in Val Verde County with 372 MW across 2 projects, followed by battery storage (1 project, 103 MW). The largest single project is Lone Bow Solar, a 277 MW solar project listed under Greenalia Solar Power Lone Bow LLC, still in study, and its target online date is Jun 2030. Of the 3, 3 are still in ERCOT's study process. Every listed connection point is on the 138 kV system (why the voltage matters). Each of the 3 projects is listed under a different company. Target online dates for the projects not yet running span Apr 2028 to Jun 2030. All of them fall in ERCOT's West load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Evans Creek Energy StorageComstock 138kV Substation (PSSE Bus #8683) | Evans Creek Energy Storage LLC | Battery storage (stand-alone) | 103.0 | Apr 2028 | In study |
| VISOL 1 SOLARTap 138kV 8683 Comstock - 60389 Corral | VISOL 1 SOLAR, LLC | Solar | 94.8 | Jun 2028 | In study |
| Lone Bow SolarTap 138 kV 8683 Comstock - 60389 Corral | Greenalia Solar Power Lone Bow LLC | Solar | 277.5 | Jun 2030 | In study |
Crowded connection points in Val Verde County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Comstock (8683) 138 kV 3 requests · 475 MW3 in study
- Lone Bow Solar 26INR0419 · Solar · 277 MW · In study
- Evans Creek Energy Storage 26INR0260 · Battery storage · 103 MW · In study
- VISOL 1 SOLAR 25INR0546 · Solar · 95 MW · In study
Corral (60389) 138 kV 2 requests · 372 MW2 in study
- Lone Bow Solar 26INR0419 · Solar · 277 MW · In study
- VISOL 1 SOLAR 25INR0546 · Solar · 95 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Val Verde County
- Val Verde County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 16, Laredo: 707 E Calton Rd, Ste 304, Laredo TX 78041-3887, 956-791-6611; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Val Verde County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Val Verde County.
Permits and reviews for Val Verde County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Val Verde County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Val Verde County connects to the grid
Val Verde County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Val Verde County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Val Verde County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 16
Dimmit · Duval · Kinney · La Salle · Maverick · McMullen · Webb · Zapata · Zavala