Concho County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
9 proposed energy projects from ERCOT's September 2026 report, plus who to call in Concho County and in TCEQ Region 8 before signing a solar, wind, or battery storage lease.
Check land in Concho CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Concho County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Concho County?
ERCOT's September 2026 interconnection report lists 9 proposed energy projects in Concho County (6 solar, 1 wind and 2 battery storage), about 2,656 MW in all. 6 of the 9 have a signed interconnection agreement. 1 is new since August.
What stands out in Concho County
By capacity, solar leads in Concho County with 1,705 MW across 6 projects, followed by battery storage (2 projects, 572 MW) and wind (1 project, 379 MW). The largest single project is Operation Sunshine, a 603 MW solar project listed under Duck Creek Solar, LLC, with its agreement signed and security posted, and its target online date is Apr 2029. Of the 9, 3 are still in ERCOT's study process, 3 have a signed interconnection agreement but no security posted yet and 3 have posted security or started construction. Connection points are mostly at 345 kV (7 projects) and 138 kV (1 project) (why the voltage matters). Aurora Solar LLC and Concho Pearl Solar, LLC are each listed on 2 projects; 7 different companies appear in all. Target online dates for the projects not yet running span Jun 2027 to Dec 2029. All of them fall in ERCOT's West load zone. 1 is new since August.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Lucy SolarTap 345kV 7077 Amos Creek - 6444 San Angelo Red Creek and 7077 Amos... | Concho County Solar 1 LLC | Solar | 352.2 | Jun 2027 | Signed; security posted |
| Operation Sunshine7077 Amos Creek 345kV · shared with 1 other request | Duck Creek Solar, LLC | Solar | 603.2 | Apr 2029 | Signed; security posted |
| Operation Sunshine Storage7077 Amos Creek 345kV · shared with 1 other request | Duck Creek Storage, LLC | Battery storage (paired with solar) | 409.8 | Apr 2029 | Signed; security posted |
| Concho Pearl SolarTap 345kV 76009 Twin Buttes - 7077 Amos Creek · shared with 1 other request | Concho Pearl Solar, LLC | Solar | 171.9 | Jan 2028 | Signed Jul 2024 |
| Concho Pearl StorageTap 345kV 76009 Twin Buttes - 7077 Amos Creek · shared with 1 other request | Concho Pearl Solar, LLC | Battery storage (paired with solar) | 162.4 | Jan 2028 | Signed Jul 2024 |
| Paint Rock WindAmos Creek (7077) – Bow Wood (76006) | Paint Rock Wind, LLC | Wind | 379.2 | Oct 2028 | Signed Aug 2026 |
| Cherry Sage Solar 1 SLF(#60423) TREADWELL 138kV. | Cherry Sage Solar 1 LLC | Solar | 142.5 | Feb 2029 | In study |
| Trail Ranch Solar 1Tap 345KV #6444 Red Creek - #7077 AMOS Creek | Aurora Solar LLC | Solar | 301.9 | Dec 2029 | In study |
| Trail Ranch Solar 2 NewTap 345 kV 6444 Red Creek -7077 Amos Creek | Aurora Solar LLC | Solar | 132.8 | Dec 2029 | In study |
Crowded connection points in Concho County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Amos Creek (7077) 345 kV 9 requests · 2,636 MW · 8 in Concho County, 1 in Tom Green3 in study, 3 signed, 3 signed; security posted
- Operation Sunshine 26INR0255 · Solar · 603 MW · Signed; security posted
- Operation Sunshine Storage 26INR0357 · Battery storage · 410 MW · Signed; security posted
- Lucy Solar 25INR0225 · Solar · 352 MW · Signed; security posted
- Paint Rock Wind 27INR0108 · Wind · 379 MW · Signed Aug 2026
- Concho Pearl Solar 25INR0174 · Solar · 172 MW · Signed Jul 2024
- Concho Pearl Storage 25INR0175 · Battery storage · 162 MW · Signed Jul 2024
- Trail Ranch Solar 1 29INR0139 · Solar · 302 MW · In study
- Trail Ranch Solar 2 29INR0272 · Solar · 133 MW · In study
- Morning Glory Solar 23INR0224 · Solar · 122 MW · In study · Tom Green
Red Creek (6444) 345 kV 5 requests · 1,390 MW · 3 in Concho County, 2 in Tom Green4 in study, 1 signed; security posted
- Lucy Solar 25INR0225 · Solar · 352 MW · Signed; security posted
- Silver Sky Solar 29INR0365 · Solar · 402 MW · In study · Tom Green
- Trail Ranch Solar 1 29INR0139 · Solar · 302 MW · In study
- Silver Sky BESS 29INR0376 · Battery storage · 201 MW · In study · Tom Green
- Trail Ranch Solar 2 29INR0272 · Solar · 133 MW · In study
Twin Buttes (76009) 345 kV 11 requests · 2,620 MW · 2 in Concho County, 9 in Tom Green, Schleicher, Coke6 in study, 4 signed, 1 signed; security posted
- Water Valley Wind Energy 20INR0247 · Wind · 180 MW · Signed; security posted · Tom Green
- Cold Creek Solar 2 26INR0290 · Solar · 432 MW · Signed Apr 2025 · Schleicher
- Concho Pearl Solar 25INR0174 · Solar · 172 MW · Signed Jul 2024
- Cold Creek Storage 2 26INR0291 · Battery storage · 172 MW · Signed Apr 2025 · Schleicher
- Concho Pearl Storage 25INR0175 · Battery storage · 162 MW · Signed Jul 2024
- Moon Chapel Solar 29INR0328 · Solar · 402 MW · In study · Tom Green
- Moon Chapel Wind 27INR0445 · Wind · 379 MW · In study · Tom Green
- Roboman Solar 27INR0453 · Solar · 273 MW · In study · Coke
- Dove Creek Solar 26INR0454 · Solar · 164 MW · In study · Tom Green
- Dove Creek Storage 26INR0455 · Battery storage · 162 MW · In study · Tom Green
- Morning Glory Solar 23INR0224 · Solar · 122 MW · In study · Tom Green
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Concho County
- Concho County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 8, San Angelo: 622 S Oakes, Ste K, San Angelo TX 76903-7035, 325-655-9479; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Concho County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Concho County.
Permits and reviews for Concho County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Concho County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Concho County connects to the grid
Concho County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Concho County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Concho County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 8
Coke · Crockett · Irion · Kimble · Mason · McCulloch · Menard · Reagan · Schleicher · Sterling · Sutton · Tom Green