Home › Texas › Schleicher County
Schleicher County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
10 proposed energy projects from ERCOT's September 2026 report, plus who to call in Schleicher County and in TCEQ Region 8 before signing a solar, wind, or battery storage lease.
Check land in Schleicher CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Schleicher County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Schleicher County?
ERCOT's September 2026 interconnection report lists 10 proposed energy projects in Schleicher County (3 solar, 2 wind and 5 battery storage), about 1,898 MW in all. 3 of the 10 have a signed interconnection agreement.
What stands out in Schleicher County
By capacity, battery storage leads in Schleicher County with 780 MW across 5 projects, followed by solar (3 projects, 574 MW) and wind (2 projects, 544 MW). The largest single project is Cold Creek Solar 2, a 432 MW solar project listed under Cold Creek Solar and Storage LLC, with an interconnection agreement signed in Apr 2025, and its target online date is May 2028. Of the 10, 7 are still in ERCOT's study process, 2 have a signed interconnection agreement but no security posted yet and 1 has posted security or started construction. Connection points are mostly at 345 kV (6 projects), 138 kV (3 projects) and 69 kV (1 project) (why the voltage matters). Cold Creek Solar and Storage LLC, Easy Wind Energy Center, LLC and Lantana Solar LLC are each listed on 2 projects; 7 different companies appear in all. Target online dates for the projects not yet running span Jun 2027 to Jun 2029. All of them fall in ERCOT's West load zone. 1 that was listed in August has since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Rockefeller Storage76003 Big Hill 345kV | Mittel Rockefeller Storage LLC | Battery storage (stand-alone) | 206.8 | Jun 2027 | Signed; security posted |
| Cold Creek Solar 2Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009) · shared with 1 other request | Cold Creek Solar and Storage LLC | Solar | 431.9 | May 2028 | Signed Apr 2025 |
| Cold Creek Storage 2Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009) · shared with 1 other request | Cold Creek Solar and Storage LLC | Battery storage (paired with solar) | 171.8 | May 2028 | Signed Apr 2025 |
| Cashel BESS6500 Live Oak AEP 138kV | TIPPSOL LLC | Battery storage (stand-alone) | 150.4 | Mar 2028 | In study |
| Tipperary Solar6498 Live Oak AEP 69kV | Tippsol | Solar | 60.2 | Mar 2028 | In study |
| Proving Ground BESSTap 138kV 6500 Live Oak - 6490 Santiago | Lantana Solar LLC | Battery storage (paired with solar) | 51.4 | Jun 2028 | In study |
| Proving Ground SolarTap 138 kV Live Oak (6500) - Santiago (6490) | Lantana Solar LLC | Solar | 82.1 | Jun 2028 | In study |
| Live Oak Wind II#76003 Big Hill 345kV | ENGIE IR Holdings LLC | Wind | 302.6 | Sep 2028 | In study |
| Easy Battery Energy Storage CenterTap 345 kV 76003 Big Hill to 76005 Schneeman Draw | Easy Wind Energy Center, LLC | Battery storage (paired with wind) | 200.0 | Jun 2029 | In study |
| Easy Wind Energy CenterTap 345kV #76003 Big Hill - #76005 Schneeman Draw circuit #1 | Easy Wind Energy Center, LLC | Wind | 241.1 | Jun 2029 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- Sombrero Solar, solar, 352 MW (Aurora Solar LLC)
Crowded connection points in Schleicher County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Big Hill (76003) 345 kV 8 requests · 1,880 MW · 6 in Schleicher County, 2 in Tom Green5 in study, 2 signed, 1 signed; security posted
- Rockefeller Storage 22INR0239 · Battery storage · 207 MW · Signed; security posted
- Cold Creek Solar 2 26INR0290 · Solar · 432 MW · Signed Apr 2025
- Cold Creek Storage 2 26INR0291 · Battery storage · 172 MW · Signed Apr 2025
- Live Oak Wind II 28INR0280 · Wind · 303 MW · In study
- Easy Wind Energy Center 27INR0246 · Wind · 241 MW · In study
- Easy Battery Energy Storage Center 27INR0231 · Battery storage · 200 MW · In study
- Dove Creek Solar 26INR0454 · Solar · 164 MW · In study · Tom Green
- Dove Creek Storage 26INR0455 · Battery storage · 162 MW · In study · Tom Green
Live Oak (6500) 138 kV 3 requests · 284 MW3 in study
- Cashel BESS 27INR0364 · Battery storage · 150 MW · In study
- Proving Ground Solar 26INR0150 · Solar · 82 MW · In study
- Proving Ground BESS 26INR0159 · Battery storage · 51 MW · In study
Santiago (6490) 138 kV 2 requests · 134 MW2 in study
- Proving Ground Solar 26INR0150 · Solar · 82 MW · In study
- Proving Ground BESS 26INR0159 · Battery storage · 51 MW · In study
Twin Buttes (76009) 345 kV 11 requests · 2,620 MW · 2 in Schleicher County, 9 in Tom Green, Concho, Coke6 in study, 4 signed, 1 signed; security posted
- Water Valley Wind Energy 20INR0247 · Wind · 180 MW · Signed; security posted · Tom Green
- Cold Creek Solar 2 26INR0290 · Solar · 432 MW · Signed Apr 2025
- Concho Pearl Solar 25INR0174 · Solar · 172 MW · Signed Jul 2024 · Concho
- Cold Creek Storage 2 26INR0291 · Battery storage · 172 MW · Signed Apr 2025
- Concho Pearl Storage 25INR0175 · Battery storage · 162 MW · Signed Jul 2024 · Concho
- Moon Chapel Solar 29INR0328 · Solar · 402 MW · In study · Tom Green
- Moon Chapel Wind 27INR0445 · Wind · 379 MW · In study · Tom Green
- Roboman Solar 27INR0453 · Solar · 273 MW · In study · Coke
- Dove Creek Solar 26INR0454 · Solar · 164 MW · In study · Tom Green
- Dove Creek Storage 26INR0455 · Battery storage · 162 MW · In study · Tom Green
- Morning Glory Solar 23INR0224 · Solar · 122 MW · In study · Tom Green
Schneeman Draw (76005) 345 kV 3 requests · 841 MW · 2 in Schleicher County, 1 in Crockett3 in study
- Gridline Solar 29INR0184 · Solar · 400 MW · In study · Crockett
- Easy Wind Energy Center 27INR0246 · Wind · 241 MW · In study
- Easy Battery Energy Storage Center 27INR0231 · Battery storage · 200 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Schleicher County
- Schleicher County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 8, San Angelo: 622 S Oakes, Ste K, San Angelo TX 76903-7035, 325-655-9479; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Schleicher County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Schleicher County.
Permits and reviews for Schleicher County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Schleicher County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Schleicher County connects to the grid
Schleicher County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Schleicher County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Schleicher County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 8
Coke · Concho · Crockett · Irion · Kimble · Mason · McCulloch · Menard · Reagan · Sterling · Sutton · Tom Green