Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Crockett County

Crockett County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects9
Total capacity1,945MW
Signed agreements3of 9
New since August0requests

9 proposed energy projects from ERCOT's September 2026 report, plus who to call in Crockett County and in TCEQ Region 8 before signing a solar, wind, or battery storage lease.

Check land in Crockett CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Crockett County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Crockett County?

ERCOT's September 2026 interconnection report lists 9 proposed energy projects in Crockett County (3 solar, 2 wind and 4 battery storage), about 1,945 MW in all. 3 of the 9 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.

What stands out in Crockett County

By capacity, battery storage leads in Crockett County with 725 MW across 4 projects, followed by wind (2 projects, 615 MW) and solar (3 projects, 604 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Midnight Sun Energy Storage, a 524 MW stand-alone battery storage project listed under Midnight Sun Energy Storage, LLC, with its agreement signed and security posted, and its target online date is Jun 2028. Of the 9, 6 are still in ERCOT's study process, 2 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 138 kV (6 projects) and 345 kV (2 projects) (why the voltage matters). ESCONDIDO DRAW RESOURCES, LLC is listed on the most projects here (2 of 9); 8 different companies appear in all. Target online dates for the projects not yet running span Dec 2027 to Jul 2030. All of them fall in ERCOT's West load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Big Sampson Windtap 345kV 76015 Cedar Canyon - 7053 NoelkeBig Sampson Wind Project, LLCWind265.4Sep 2026Approved for synchronization
Blue Sky Sol6562 Friends Ranch 138kVBlue Sky Solar LLCSolar101.2Dec 2027Signed; security posted
Midnight Sun Energy Storage6601 Rio Pecos 138kVMidnight Sun Energy Storage, LLCBattery storage (stand-alone)523.9Jun 2028Signed; security posted
Ranchero BESS7053 Noelke 345 kVRanchero Battery Facility, LLCBattery storage (stand-alone)150.0Apr 2028In study
BLACK BEAR BESS#6564 ILLN4A 138kVESCONDIDO DRAW RESOURCES, LLCBattery storage (paired with solar)51.2Jun 2028In study
BLACK BEAR SOLAR#6564 ILLN4A 138 KVESCONDIDO DRAW RESOURCES, LLCSolar102.9Jun 2028In study
Blue Sky Storage SLF138 kV Friend Ranch (Bus# 6562)UKA North America, LLCBattery storage (paired with solar)Self-limitingJun 2028In study
Gridline Solar76005 Schneeman Draw LCRABig Lake Ranch LLCSolar400.0Jul 2029In study
Oasis wind6562 Friend Ranch Station 138kVNextEra Energy Interconnection Holdings, LLCWind350.0Jul 2030In study

Crowded connection points in Crockett County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Friends Ranch (6562) 138 kV 3 requests · 451 MW2 in study, 1 signed; security posted
  • Blue Sky Sol 22INR0455 · Solar · 101 MW · Signed; security posted
  • Oasis wind 29INR0073 · Wind · 350 MW · In study
  • Blue Sky Storage SLF 25INR0216 · Battery storage · 0 MW · In study
Noelke (7053) 345 kV 2 requests · 415 MW1 approved for synchronization, 1 in study
  • Big Sampson Wind 16INR0104 · Wind · 265 MW · Approved for synchronization
  • Ranchero BESS 25INR0489 · Battery storage · 150 MW · In study
ILLN4A (6564) 138 kV 2 requests · 154 MW2 in study
  • BLACK BEAR SOLAR 26INR0365 · Solar · 103 MW · In study
  • BLACK BEAR BESS 26INR0366 · Battery storage · 51 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Crockett County

  • Crockett County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 8, San Angelo: 622 S Oakes, Ste K, San Angelo TX 76903-7035, 325-655-9479; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Crockett County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Crockett County.

Permits and reviews for Crockett County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Crockett County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Crockett County connects to the grid

Crockett County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Crockett County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Crockett County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 8

Coke · Concho · Irion · Kimble · Mason · McCulloch · Menard · Reagan · Schleicher · Sterling · Sutton · Tom Green

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.