McCulloch County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects3
Total capacity751MW
Signed agreements0of 3
New since August0requests

3 proposed energy projects from ERCOT's September 2026 report, plus who to call in McCulloch County and in TCEQ Region 8 before signing a solar, wind, or battery storage lease.

Check land in McCulloch CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for McCulloch County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in McCulloch County?

ERCOT's September 2026 interconnection report lists 3 proposed energy projects in McCulloch County (1 solar and 2 battery storage), about 751 MW in all. None has a signed interconnection agreement yet.

What stands out in McCulloch County

By capacity, solar leads in McCulloch County with 400 MW across 1 project, followed by battery storage (2 projects, 351 MW). The largest single project is Biggs Solar, a 400 MW solar project listed under Biggs Solar Farm, LLC, still in study, and its target online date is Jun 2029. Of the 3, 3 are still in ERCOT's study process. Connection points are mostly at 345 kV (2 projects) and 69 kV (1 project) (why the voltage matters). Each of the 3 projects is listed under a different company. Target online dates for the projects not yet running span Jun 2027 to Jun 2029. All of them fall in ERCOT's South load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Pecan Ridge60386 HEARTLAN2A 69kVLuminous Energy Renewables LLCBattery storage (stand-alone)150.8Jun 2027In study
Biggs BESS76006 Bow Wood 345 kVBiggs Battery Facility, LLCBattery storage (paired with solar)200.0Jun 2029In study
Biggs Solar#76006 Bow Wood 345 kVBiggs Solar Farm, LLCSolar400.0Jun 2029In study

Crowded connection points in McCulloch County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Bow Wood (76006) 345 kV 3 requests · 979 MW · 2 in McCulloch County, 1 in Concho2 in study, 1 signed
  • Paint Rock Wind 27INR0108 · Wind · 379 MW · Signed Aug 2026 · Concho
  • Biggs Solar 28INR0111 · Solar · 400 MW · In study
  • Biggs BESS 28INR0110 · Battery storage · 200 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in McCulloch County

  • McCulloch County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 8, San Angelo: 622 S Oakes, Ste K, San Angelo TX 76903-7035, 325-655-9479; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • McCulloch County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for McCulloch County.

Permits and reviews for McCulloch County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in McCulloch County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in McCulloch County connects to the grid

McCulloch County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in McCulloch County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in McCulloch County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 8

Coke · Concho · Crockett · Irion · Kimble · Mason · Menard · Reagan · Schleicher · Sterling · Sutton · Tom Green

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.