Sutton County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
2 proposed energy projects from ERCOT's September 2026 report, plus who to call in Sutton County and in TCEQ Region 8 before signing a solar, wind, or battery storage lease.
Check land in Sutton CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Sutton County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Sutton County?
ERCOT's September 2026 interconnection report lists 2 proposed energy projects in Sutton County (2 battery storage), about 307 MW in all. Neither has a signed interconnection agreement yet.
What stands out in Sutton County
By capacity, battery storage leads in Sutton County with 307 MW across 2 projects. The largest single project is Sonora High Noon BESS, a 204 MW stand-alone battery storage project listed under Sonora High Noon, LLC, still in study, and its target online date is Jul 2028. Of the 2, 2 are still in ERCOT's study process. Connection points are mostly at 69 kV (1 project) and 138 kV (1 project) (why the voltage matters). Target online dates for the projects not yet running span Jul 2028 to Jan 2030. All of them fall in ERCOT's West load zone. 1 that was listed in August has since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Sonora High Noon BESS60412 CARVER 138kV | Sonora High Noon, LLC | Battery storage (stand-alone) | 204.1 | Jul 2028 | In study |
| Atticus Energy StorageTap 69 KV 6570 Bond Road - 6513 Sonora | Atticus Energy Storage | Battery storage (stand-alone) | 103.0 | Jan 2030 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- Axis Ridge Wind, wind, 392 MW (Axis Ridge Wind, LLC)
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Sutton County
- Sutton County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 8, San Angelo: 622 S Oakes, Ste K, San Angelo TX 76903-7035, 325-655-9479; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Sutton County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Sutton County.
Permits and reviews for Sutton County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Sutton County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Sutton County connects to the grid
Sutton County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Sutton County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Sutton County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 8
Coke · Concho · Crockett · Irion · Kimble · Mason · McCulloch · Menard · Reagan · Schleicher · Sterling · Tom Green