Proposed projects21
Total capacity4,511MW
Signed agreements8of 21
New since August1requests

21 proposed energy projects from ERCOT's September 2026 report, plus who to call in Starr County and in TCEQ Region 15 before signing a solar, wind, or battery storage lease.

Check land in Starr CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Starr County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Starr County?

ERCOT's September 2026 interconnection report lists 21 proposed energy projects in Starr County (8 solar, 4 wind and 9 battery storage), about 4,511 MW in all. 8 of the 21 have a signed interconnection agreement, and 2 have been approved for energization or synchronization. 1 is new since August.

What stands out in Starr County

By capacity, solar leads in Starr County with 2,344 MW across 8 projects, followed by battery storage (9 projects, 1,168 MW) and wind (4 projects, 999 MW); 2 self-limiting projects (reported at 0 MW because the resource limits its own output) are listed without a capacity. The largest single project is Half Moon Solar, a 512 MW solar project listed under NextEra Energy Interconnection Holdings, LLC, with its agreement signed and security posted, and its target online date is Jul 2029. Of the 21, 13 are still in ERCOT's study process, 6 have posted security or started construction and 2 are approved for energization or synchronization. Connection points are mostly at 345 kV (13 projects) and 138 kV (8 projects) (why the voltage matters). The single most-used connection point is Tap 345kV 80355 Del Sol - 80227 Rapido, shared by 4 projects. Halcon Wind, LLC and Mandolin Energy Center I, LLC are each listed on 3 projects; 15 different companies appear in all. Target online dates for the projects not yet running span Mar 2028 to Sep 2029. All of them fall in ERCOT's South load zone. 1 is new since August.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Starr Solar Ranch8795 Roma 138kV · shared with 1 other requestStarr Solar Ranch 1 LLCSolar136.7Aug 2025Approved for synchronization
Mesteno Wind80355 Del Sol 345kV · shared with 1 other requestMesteno Windpower, LLCWind201.6Mar 2027Approved for synchronization
Diamondback solar80355 Del Sol 345kV · shared with 1 other requestDiamondback Solar, LLCSolar200.5Apr 2028Signed; security posted
Bullring Wind 1Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1 · shared with 2 other requestsHalcon Wind, LLCWind303.5Jun 2028Signed; security posted
Bullring Wind 2Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1 · shared with 2 other requestsHalcon Wind, LLCWind303.8Jun 2028Signed; security posted
Bullring Wind 3Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1 · shared with 2 other requestsHalcon Wind, LLCWind190.4Jun 2028Signed; security posted
Bordertown BESS8796 Roma 138kVBordertown BESS LLCBattery storage (stand-alone)100.0Dec 2028Signed; security posted
Half Moon Solar#80231 Pronto 345kVNextEra Energy Interconnection Holdings, LLCSolar512.5Jul 2029Signed; security posted
Starr Storage8795 Roma 138kV · shared with 1 other requestFalcon Lake Storage, LLCBattery storage (paired with solar)Self-limitingMar 2028In study
Halcon StorageTap 138kV 8957 Central Lopeno - 80106 Falcon DamTX BESS A LLCBattery storage (stand-alone)132.7May 2028In study
PSE Flores TX StorageTAP 138KV 8793 RIO GRANDE CITY - 8798 LAGRULLAPureSky Development IncBattery storage (stand-alone)200.0Jun 2028In study
PSE Gongora Hill TX StorageTap 138kV 8796 Roma – 7870 EscobaresPureSky Development IncBattery storage (stand-alone)200.0Jun 2028In study
Fierce River BESSTapping the 345 kV Line from Del Sol (Bus# 80355) to Frontera (Bus#...Rio Grande Solar LLCBattery storage (stand-alone)284.5Feb 2029In study
Sword BESSTap 138 kV 8394 Liston - 8392 Bates · shared with 2 other requestsHidalgo Solar LLCBattery storage (paired with solar)40.1Feb 2029In study
Sword SolarTap 138 kV 8394 Liston - 8392 Bates · shared with 2 other requestsHidalgo Solar LLCSolar137.2Feb 2029In study
Sendero SolarTap 345kV 80079 Cruce - 80355 Del SolACE DevCo NC, LLCSolar502.7May 2029In study
Mandolin Solar II SLFTap 345kV 80355 Del Sol - 80227 Rapido · shared with 3 other requestsMandolin Energy Center II, LLCSolar304.4Jun 2029In study
Mandolin Solar III SLF NewTap 345kV 80355 Del Sol - 80227 Rapido · shared with 3 other requestsMandolin Energy Center I, LLCSolar250.0Jun 2029In study
Mandolin Solar SLFTap 345kV 80355 Del Sol - 80227 Rapido · shared with 3 other requestsMandolin Energy Center I, LLCSolar300.0Jun 2029In study
Mandolin Storage SLFTap 345kV 80355 Del Sol - 80227 Rapido · shared with 3 other requestsMandolin Energy Center I, LLCBattery storage (paired with solar)Self-limitingJun 2029In study
Bessie StorageCharly Egner Substation Tap 345kV 80355 Del Sol - 80368 LV4 BridgeBessie Energy Storage, LLCBattery storage (stand-alone)210.8Sep 2029In study

Crowded connection points in Starr County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Del Sol (80355) 345 kV 16 requests · 3,856 MW · 12 in Starr County, 4 in Jim Hogg11 in study, 4 signed; security posted, 1 approved for synchronization
  • Mesteno Wind 16INR0081 · Wind · 202 MW · Approved for synchronization
  • Bullring Wind 2 28INR0038 · Wind · 304 MW · Signed; security posted
  • Bullring Wind 1 28INR0037 · Wind · 304 MW · Signed; security posted
  • Diamondback solar 20INR0162 · Solar · 200 MW · Signed; security posted
  • Bullring Wind 3 28INR0039 · Wind · 190 MW · Signed; security posted
  • Sendero Solar 28INR0043 · Solar · 503 MW · In study
  • Mandolin Solar II SLF 29INR0223 · Solar · 304 MW · In study
  • Ciervo Wind 28INR0242 · Wind · 302 MW · In study · Jim Hogg
  • Mandolin Solar SLF 26INR0527 · Solar · 300 MW · In study
  • Fierce River BESS 27INR0222 · Battery storage · 284 MW · In study
  • Mandolin Solar III SLF 29INR0224 · Solar · 250 MW · In study
  • Bessie Storage 23INR0455 · Battery storage · 211 MW · In study
  • Bell Song Solar 30INR0041 · Solar · 168 MW · In study · Jim Hogg
  • Bell Song Solar 2 30INR0049 · Solar · 168 MW · In study · Jim Hogg
  • Bell Song Solar 3 31INR0009 · Solar · 168 MW · In study · Jim Hogg
  • Mandolin Storage SLF 26INR0528 · Battery storage · 0 MW · In study
Rapido (80227) 345 kV 7 requests · 1,752 MW · 4 in Starr County, 3 in Zapata7 in study
  • Freedom Falcon BESS 26INR0107 · Battery storage · 502 MW · In study · Zapata
  • Mandolin Solar II SLF 29INR0223 · Solar · 304 MW · In study
  • Mandolin Solar SLF 26INR0527 · Solar · 300 MW · In study
  • Mandolin Solar III SLF 29INR0224 · Solar · 250 MW · In study
  • Barrosos Creek Wind 3 28INR0337 · Wind · 198 MW · In study · Zapata
  • Barrosos Creek Wind 4 28INR0338 · Wind · 198 MW · In study · Zapata
  • Mandolin Storage SLF 26INR0528 · Battery storage · 0 MW · In study
Cruce (80079) 345 kV 21 requests · 6,554 MW · 4 in Starr County, 17 in Duval, Jim Hogg, Webb15 in study, 5 signed; security posted, 1 signed
  • Mirando Valley Wind 28INR0072 · Wind · 479 MW · Signed; security posted · Jim Hogg
  • Viento Bravo Wind 28INR0434 · Wind · 367 MW · Signed; security posted · Jim Hogg
  • Bullring Wind 2 28INR0038 · Wind · 304 MW · Signed; security posted
  • Bullring Wind 1 28INR0037 · Wind · 304 MW · Signed; security posted
  • Bullring Wind 3 28INR0039 · Wind · 190 MW · Signed; security posted
  • Cenizo Solar 29INR0219 · Solar · 301 MW · Signed Sep 2026 · Webb
  • Las Mujeres Solar 29INR0154 · Solar · 684 MW · In study · Jim Hogg
  • Cielo Vista Solar 27INR0150 · Solar · 503 MW · In study · Duval
  • Sendero Solar 28INR0043 · Solar · 503 MW · In study
  • Cielo Vista Power Gas Plant 28INR0325 · Gas engines · 344 MW · In study · Duval
  • Cielo Vista Storage 29INR0115 · Battery storage · 311 MW · In study · Duval
  • Estrella Dorada Wind 29INR0146 · Wind · 306 MW · In study · Duval
  • Cazadores Solar 29INR0160 · Solar · 302 MW · In study · Duval
  • Ciervo Wind 28INR0242 · Wind · 302 MW · In study · Jim Hogg
  • Black Hawk Solar 28INR0040 · Solar · 251 MW · In study · Duval
  • Apricot Sun Solar 29INR0124 · Solar · 201 MW · In study · Duval
  • Apricot Sun Storage 29INR0125 · Battery storage · 201 MW · In study · Duval
  • Guajillo Wind 28INR0168 · Wind · 200 MW · In study · Duval
  • Bell Song Solar 30INR0041 · Solar · 168 MW · In study · Jim Hogg
  • Bell Song Solar 2 30INR0049 · Solar · 168 MW · In study · Jim Hogg
  • Bell Song Solar 3 31INR0009 · Solar · 168 MW · In study · Jim Hogg
Roma (8795) 138 kV 2 requests · 137 MW1 approved for synchronization, 1 in study
  • Starr Solar Ranch 20INR0216 · Solar · 137 MW · Approved for synchronization
  • Starr Storage 25INR0379 · Battery storage · 0 MW · In study
Roma (8796) 138 kV 2 requests · 300 MW1 signed; security posted, 1 in study
  • Bordertown BESS 23INR0354 · Battery storage · 100 MW · Signed; security posted
  • PSE Gongora Hill TX Storage 24INR0446 · Battery storage · 200 MW · In study
Liston (8394) 138 kV 6 requests · 749 MW · 2 in Starr County, 4 in Hidalgo6 in study
  • PSE Chihuahua TX Storage 24INR0447 · Battery storage · 200 MW · In study · Hidalgo
  • Eligius BESS 28INR0247 · Battery storage · 175 MW · In study · Hidalgo
  • Sword Solar 26INR0445 · Solar · 137 MW · In study
  • Anawa La BESS 27INR0233 · Battery storage · 104 MW · In study · Hidalgo
  • Anawa La Solar 27INR0232 · Solar · 93 MW · In study · Hidalgo
  • Sword BESS 26INR0446 · Battery storage · 40 MW · In study
Bates (8392) 138 kV 6 requests · 749 MW · 2 in Starr County, 4 in Hidalgo6 in study
  • PSE Chihuahua TX Storage 24INR0447 · Battery storage · 200 MW · In study · Hidalgo
  • Eligius BESS 28INR0247 · Battery storage · 175 MW · In study · Hidalgo
  • Sword Solar 26INR0445 · Solar · 137 MW · In study
  • Anawa La BESS 27INR0233 · Battery storage · 104 MW · In study · Hidalgo
  • Anawa La Solar 27INR0232 · Solar · 93 MW · In study · Hidalgo
  • Sword BESS 26INR0446 · Battery storage · 40 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Starr County

  • Starr County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 15, Harlingen: 1804 W Jefferson Ave, Harlingen TX 78550-5247, 956-425-6010; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Starr County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Starr County.

Permits and reviews for Starr County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Starr County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Starr County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.

How a project in Starr County connects to the grid

Starr County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Starr County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Starr County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 15

Brooks · Cameron · Hidalgo · Jim Hogg · Kenedy · Willacy

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources