Home › Texas › Jim Hogg County
Jim Hogg County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
9 proposed energy projects from ERCOT's September 2026 report, plus who to call in Jim Hogg County and in TCEQ Region 15 before signing a solar, wind, or battery storage lease.
Check land in Jim Hogg CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Jim Hogg County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Jim Hogg County?
ERCOT's September 2026 interconnection report lists 9 proposed energy projects in Jim Hogg County (4 solar and 5 wind), about 2,933 MW in all. 2 of the 9 have a signed interconnection agreement.
What stands out in Jim Hogg County
By capacity, wind leads in Jim Hogg County with 1,746 MW across 5 projects, followed by solar (4 projects, 1,187 MW). The largest single project is Las Mujeres Solar, a 684 MW solar project listed under Las Mujeres Solar, LLC, still in study, and its target online date is Dec 2029. Of the 9, 7 are still in ERCOT's study process and 2 have posted security or started construction. Every listed connection point is on the 345 kV system (why the voltage matters). Barranca Wind Energy, LLC is listed on the most projects here (2 of 9); 8 different companies appear in all. Target online dates for the projects not yet running span Jun 2028 to Aug 2030. All of them fall in ERCOT's South load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Mirando Valley WindTap 345kV 80220 Cenizo - 80079 Cruce Ckt-1 · shared with 1 other request | ACE DevCo NC LLC | Wind | 478.7 | Jul 2028 | Signed; security posted |
| Viento Bravo WindTap 345kV 80220 Cenizo - 80079 Cruce Ckt-1 · shared with 1 other request | Webb Wind, LLC | Wind | 366.5 | Jul 2028 | Signed; security posted |
| Barranca Wind 1Tap the 345 kV CENIZO (#80225) - DELSOL (#80307) line | Barranca Wind Energy, LLC | Wind | 300.9 | Jun 2028 | In study |
| Barranca Wind 2Tap the 345 kV CENIZO7C (#80225) - DELSOL7C (#80307) line. | Barranca Wind Energy, LLC | Wind | 298.6 | Jun 2028 | In study |
| Ciervo WindTap 345 kV 80355 DelSol7A - 80079 Cruce CKT 2 | RWE Clean Energy Development, LLC | Wind | 301.5 | Dec 2028 | In study |
| Bell Song SolarTap 345 kV #80079 CRUCE7A - #80355 DELSOL7A ckt 1 · shared with 1 other request | Bell Song Solar, LLC | Solar | 167.6 | Sep 2029 | In study |
| Las Mujeres SolarCruces 7A (Bus #80079) | Las Mujeres Solar, LLC | Solar | 684.3 | Dec 2029 | In study |
| Bell Song Solar 2Tap 345kV (#80079) CRUCE7A - (#80355) DELSOL7A ckt 1 | Bell Song Solar, LLC 2 | Solar | 167.6 | Mar 2030 | In study |
| Bell Song Solar 3Tap 345 kV #80079 CRUCE7A - #80355 DELSOL7A ckt 1 · shared with 1 other request | Bell Song Solar, LLC 3 | Solar | 167.6 | Aug 2030 | In study |
Crowded connection points in Jim Hogg County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Cruce (80079) 345 kV 21 requests · 6,554 MW · 7 in Jim Hogg County, 14 in Duval, Starr, Webb15 in study, 5 signed; security posted, 1 signed
- Mirando Valley Wind 28INR0072 · Wind · 479 MW · Signed; security posted
- Viento Bravo Wind 28INR0434 · Wind · 367 MW · Signed; security posted
- Bullring Wind 2 28INR0038 · Wind · 304 MW · Signed; security posted · Starr
- Bullring Wind 1 28INR0037 · Wind · 304 MW · Signed; security posted · Starr
- Bullring Wind 3 28INR0039 · Wind · 190 MW · Signed; security posted · Starr
- Cenizo Solar 29INR0219 · Solar · 301 MW · Signed Sep 2026 · Webb
- Las Mujeres Solar 29INR0154 · Solar · 684 MW · In study
- Cielo Vista Solar 27INR0150 · Solar · 503 MW · In study · Duval
- Sendero Solar 28INR0043 · Solar · 503 MW · In study · Starr
- Cielo Vista Power Gas Plant 28INR0325 · Gas engines · 344 MW · In study · Duval
- Cielo Vista Storage 29INR0115 · Battery storage · 311 MW · In study · Duval
- Estrella Dorada Wind 29INR0146 · Wind · 306 MW · In study · Duval
- Cazadores Solar 29INR0160 · Solar · 302 MW · In study · Duval
- Ciervo Wind 28INR0242 · Wind · 302 MW · In study
- Black Hawk Solar 28INR0040 · Solar · 251 MW · In study · Duval
- Apricot Sun Solar 29INR0124 · Solar · 201 MW · In study · Duval
- Apricot Sun Storage 29INR0125 · Battery storage · 201 MW · In study · Duval
- Guajillo Wind 28INR0168 · Wind · 200 MW · In study · Duval
- Bell Song Solar 30INR0041 · Solar · 168 MW · In study
- Bell Song Solar 2 30INR0049 · Solar · 168 MW · In study
- Bell Song Solar 3 31INR0009 · Solar · 168 MW · In study
Del Sol (80355) 345 kV 16 requests · 3,856 MW · 4 in Jim Hogg County, 12 in Starr11 in study, 4 signed; security posted, 1 approved for synchronization
- Mesteno Wind 16INR0081 · Wind · 202 MW · Approved for synchronization · Starr
- Bullring Wind 2 28INR0038 · Wind · 304 MW · Signed; security posted · Starr
- Bullring Wind 1 28INR0037 · Wind · 304 MW · Signed; security posted · Starr
- Diamondback solar 20INR0162 · Solar · 200 MW · Signed; security posted · Starr
- Bullring Wind 3 28INR0039 · Wind · 190 MW · Signed; security posted · Starr
- Sendero Solar 28INR0043 · Solar · 503 MW · In study · Starr
- Mandolin Solar II SLF 29INR0223 · Solar · 304 MW · In study · Starr
- Ciervo Wind 28INR0242 · Wind · 302 MW · In study
- Mandolin Solar SLF 26INR0527 · Solar · 300 MW · In study · Starr
- Fierce River BESS 27INR0222 · Battery storage · 284 MW · In study · Starr
- Mandolin Solar III SLF 29INR0224 · Solar · 250 MW · In study · Starr
- Bessie Storage 23INR0455 · Battery storage · 211 MW · In study · Starr
- Bell Song Solar 30INR0041 · Solar · 168 MW · In study
- Bell Song Solar 2 30INR0049 · Solar · 168 MW · In study
- Bell Song Solar 3 31INR0009 · Solar · 168 MW · In study
- Mandolin Storage SLF 26INR0528 · Battery storage · 0 MW · In study · Starr
Cenizo (80220) 345 kV 7 requests · 1,807 MW · 2 in Jim Hogg County, 5 in Webb3 in study, 3 signed; security posted, 1 signed
- Mirando Valley Wind 28INR0072 · Wind · 479 MW · Signed; security posted
- Viento Bravo Wind 28INR0434 · Wind · 367 MW · Signed; security posted
- Corvus Solar 27INR0126 · Solar · 202 MW · Signed; security posted · Webb
- Cenizo Solar 29INR0219 · Solar · 301 MW · Signed Sep 2026 · Webb
- Bravo BESS 27INR0398 · Battery storage · 207 MW · In study · Webb
- Becerra Creek Storage 1 26INR0024 · Battery storage · 126 MW · In study · Webb
- Becerra Creek Storage 2 27INR0003 · Battery storage · 126 MW · In study · Webb
CENIZO7C (80225) 345 kV 16 requests · 4,321 MW · 2 in Jim Hogg County, 14 in Zapata12 in study, 4 signed; security posted
- Cascabel Wind 2 23INR0561 · Wind · 198 MW · Signed; security posted · Zapata
- Cascabel Wind 1 24INR0424 · Wind · 198 MW · Signed; security posted · Zapata
- Corralitos Wind 1 24INR0505 · Wind · 196 MW · Signed; security posted · Zapata
- Corralitos Wind 2 24INR0506 · Wind · 195 MW · Signed; security posted · Zapata
- Falcon BESS 29INR0169 · Battery storage · 517 MW · In study · Zapata
- Falcon Solar 28INR0317 · Solar · 502 MW · In study · Zapata
- Tetris Solar 28INR0005 · Solar · 359 MW · In study · Zapata
- Barranca Wind 1 28INR0375 · Wind · 301 MW · In study
- Barranca Wind 2 28INR0376 · Wind · 299 MW · In study
- Sierra Madre Solar 23INR0006 · Solar · 255 MW · In study · Zapata
- La Morena Energy Center BESS 30INR0042 · Battery storage · 250 MW · In study · Zapata
- La Morena Energy Center Solar 30INR0043 · Solar · 250 MW · In study · Zapata
- Wallflower Energy Storage 30INR0093 · Battery storage · 209 MW · In study · Zapata
- Wallflower Solar 30INR0092 · Solar · 201 MW · In study · Zapata
- Corralitos Wind 3 28INR0339 · Wind · 196 MW · In study · Zapata
- Corralitos Wind 4 28INR0340 · Wind · 195 MW · In study · Zapata
Del Sol (80307) 345 kV 14 requests · 3,930 MW · 2 in Jim Hogg County, 12 in Zapata10 in study, 4 signed; security posted
- Cascabel Wind 2 23INR0561 · Wind · 198 MW · Signed; security posted · Zapata
- Cascabel Wind 1 24INR0424 · Wind · 198 MW · Signed; security posted · Zapata
- Corralitos Wind 1 24INR0505 · Wind · 196 MW · Signed; security posted · Zapata
- Corralitos Wind 2 24INR0506 · Wind · 195 MW · Signed; security posted · Zapata
- Falcon BESS 29INR0169 · Battery storage · 517 MW · In study · Zapata
- Falcon Solar 28INR0317 · Solar · 502 MW · In study · Zapata
- Tetris Solar 28INR0005 · Solar · 359 MW · In study · Zapata
- Barranca Wind 1 28INR0375 · Wind · 301 MW · In study
- Barranca Wind 2 28INR0376 · Wind · 299 MW · In study
- Sierra Madre Solar 23INR0006 · Solar · 255 MW · In study · Zapata
- La Morena Energy Center BESS 30INR0042 · Battery storage · 250 MW · In study · Zapata
- La Morena Energy Center Solar 30INR0043 · Solar · 250 MW · In study · Zapata
- Wallflower Energy Storage 30INR0093 · Battery storage · 209 MW · In study · Zapata
- Wallflower Solar 30INR0092 · Solar · 201 MW · In study · Zapata
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Jim Hogg County
- Jim Hogg County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 15, Harlingen: 1804 W Jefferson Ave, Harlingen TX 78550-5247, 956-425-6010; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Jim Hogg County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Jim Hogg County.
Permits and reviews for Jim Hogg County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Jim Hogg County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Jim Hogg County connects to the grid
Jim Hogg County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Jim Hogg County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Jim Hogg County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 15
Brooks · Cameron · Hidalgo · Kenedy · Starr · Willacy