Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Permits › Wyoming

Wyoming: every permit portal for solar, wind, and storage

Links checked October 24, 2026 · Official sites only · Pick another state

The quick find: which office handles each approval a utility-scale project touches in Wyoming, with the agency's own page. Counties and cities add their own land-use approvals; the state table is the part that is the same across the state.

State and grid

ApprovalWhere to go
State siting or certificateWhether the state itself approves where a generating facility goes, or leaves it to counties and cities.Industrial Siting Permitting (facilities above a cost threshold; commercial wind by turbine count)Wyoming DEQ Industrial Siting Division / Industrial Siting CouncilConfirmed live; 'Permitting' page under the Industrial Siting Division (site path is /industrial-siting-2/). Division home: https://deq.wyoming.gov/industrial-siting-2/
Grid interconnectionThe queue the project enters to connect: the regional grid operator, or the utility and public utility commission outside an RTO.PacifiCorp / Black Hills Energy / WAPA (non-RTO) exact page not confirmedLook for: Generator interconnection · the exact page did not answer our check, so this goes to the agency's site
Construction stormwater permitNPDES coverage for land disturbance of one acre or more, before earthwork starts.WYPDES construction stormwater general permitWyoming Department of Environmental Quality
Historic preservation reviewSection 106 consultation through the State Historic Preservation Office when a federal permit, federal funding or federal land is involved; many states add their own review on state land.Review and Consultation (S106)Wyoming State Historic Preservation OfficePage confirmed; program renamed from 'Review and Compliance' to 'Review and Consultation (S106)'.
Wildlife and habitat reviewThe state wildlife agency's project screening or natural-heritage data request; federal species go through USFWS IPaC.Habitat Protection Program (development project review)Wyoming Game and Fish DepartmentPage confirmed; describes review of proposed development projects, how to submit a project for review, sage-grouse tools and wind/solar guidelines.
State road access and utility permitsA driveway onto a state highway, and a gen-tie or cable in state right of way.Utilities Section (M-54 utility license, M-21 permit in WYDOT right-of-way)Wyoming Department of TransportationPage confirmed; covers utility licenses/permits via MaintStar. Driveway/access permits are not covered here and no access-permit page surfaced in the one search.
Floodplain (state NFIP coordinator)Local floodplain development permits are county or city; the state coordinator lists who administers them.National Flood Insurance Program (state NFIP coordinator)Wyoming Office of Homeland Security, MitigationConfirmed live; 'Homeland Security - NFIP' page with Wyoming participation data, floodplain quick guide and state contact.
Water rights and wellsConstruction water, dust control and O&M wells: the state engineer, water board or environmental agency.Water rightsWyoming State Engineer's Office
Property-tax incentive programState abatement or exemption programs for renewable generation, where one exists.Wyoming Department of Revenue exact page not confirmedLook for: Property tax; wind generation tax ($1/MWh) · the exact page did not answer our check, so this goes to the agency's site

Federal portals (the same in every state)

ApprovalWhere to go
Clean Water Act Section 404 / Rivers and Harbors Act Section 10U.S. Army Corps of EngineersRegulatory Request System: applications, pre-application meetings and jurisdictional determinations; the district office is by watershed.
Endangered species and critical habitatU.S. Fish and Wildlife ServiceIPaC: official species list and the Section 7 consultation path for the project footprint.
Tall structures (wind turbines, met towers)Federal Aviation AdministrationForm 7460-1 notice through OE/AAA before construction above the 14 CFR 77.9 heights.
Construction stormwater where EPA is the permitting authorityU.S. EPAEPA's Construction General Permit (NeT eNOI) in New Mexico, Massachusetts, New Hampshire, D.C., Indian country and the territories.
Projects on federal landBureau of Land ManagementRight-of-way applications and NEPA documents for BLM-managed land.
Transmission and wholesale market rulesFederal Energy Regulatory CommissionOrder No. 2023 cluster-study reforms, followed by every FERC-jurisdictional transmission provider, RTO or utility; ERCOT has its own process.

County and city pages for Wyoming

From the nationwide permit finder; counties and cities issue most land-use approvals, so start with the jurisdiction that covers the parcel.

Other states

How this list is made. Each link was found on the agency's own site and is re-checked by a script that loads it and records the date; a link that stops answering is shown without a link rather than dropped. Programs change with each legislative session: confirm fees, forms and thresholds on the agency page before filing. General information, not legal advice. How we check our data · Report an error.

Browse resources