Florida: every permit portal for solar, wind, and storage
The quick find: which office handles each approval a utility-scale project touches in Florida, with the agency's own page. Counties and cities add their own land-use approvals; the state table is the part that is the same across the state.
State and grid
| Approval | Where to go |
|---|---|
| State siting or certificateWhether the state itself approves where a generating facility goes, or leaves it to counties and cities. | Power Plant Siting Act certification for steam or solar plants of 75 MW or more (s. 403.503(14))Florida DEP, Siting Coordination OfficeSolar under 75 MW is a local land-use approval, and s. 163.3205 limits what local governments can deny; many Florida utility PV projects are sized just under 75 MW for this reason. |
| Grid interconnectionThe queue the project enters to connect: the regional grid operator, or the utility and public utility commission outside an RTO. | Florida utilities (FPL, Duke, TECO; non-RTO) exact page not confirmedLook for: Generator interconnection (utility-specific) · the exact page did not answer our check, so this goes to the agency's site |
| Construction stormwater permitNPDES coverage for land disturbance of one acre or more, before earthwork starts. | Construction Activity - NPDES Construction Generic Permit (CGP)Florida Department of Environmental ProtectionPage confirmed; covers when CGP coverage is required, NOI filing and fees, NOT process. |
| Historic preservation reviewSection 106 consultation through the State Historic Preservation Office when a federal permit, federal funding or federal land is involved; many states add their own review on state land. | Compliance and review (Section 106)Florida Division of Historical Resources |
| Wildlife and habitat reviewThe state wildlife agency's project screening or natural-heritage data request; federal species go through USFWS IPaC. | Florida Wildlife Conservation Guide (conservation planning, avoidance and permitting)Florida Fish and Wildlife Conservation Commission |
| State road access and utility permitsA driveway onto a state highway, and a gen-tie or cable in state right of way. | Florida Department of Transportation exact page not confirmedLook for: Driveway connection and utility permits · the exact page did not answer our check, so this goes to the agency's site |
| Floodplain (state NFIP coordinator)Local floodplain development permits are county or city; the state coordinator lists who administers them. | State NFIP coordinatorFlorida Division of Emergency Management |
| Water rights and wellsConstruction water, dust control and O&M wells: the state engineer, water board or environmental agency. | Florida water management districts exact page not confirmedLook for: Consumptive use and well permits (five districts) · the exact page did not answer our check, so this goes to the agency's site |
| Property-tax incentive programState abatement or exemption programs for renewable generation, where one exists. | Renewable energy source device exemption (s. 193.624)Florida Department of Revenue |
Federal portals (the same in every state)
| Approval | Where to go |
|---|---|
| Clean Water Act Section 404 / Rivers and Harbors Act Section 10 | U.S. Army Corps of EngineersRegulatory Request System: applications, pre-application meetings and jurisdictional determinations; the district office is by watershed. |
| Endangered species and critical habitat | U.S. Fish and Wildlife ServiceIPaC: official species list and the Section 7 consultation path for the project footprint. |
| Tall structures (wind turbines, met towers) | Federal Aviation AdministrationForm 7460-1 notice through OE/AAA before construction above the 14 CFR 77.9 heights. |
| Construction stormwater where EPA is the permitting authority | U.S. EPAEPA's Construction General Permit (NeT eNOI) in New Mexico, Massachusetts, New Hampshire, D.C., Indian country and the territories. |
| Projects on federal land | Bureau of Land ManagementRight-of-way applications and NEPA documents for BLM-managed land. |
| Transmission and wholesale market rules | Federal Energy Regulatory CommissionOrder No. 2023 cluster-study reforms, followed by every FERC-jurisdictional transmission provider, RTO or utility; ERCOT has its own process. |
County and city pages for Florida
From the nationwide permit finder; counties and cities issue most land-use approvals, so start with the jurisdiction that covers the parcel.
- Florida — Wastewater permitting (State): Florida environmental authority. Start with this agency for the linked water program. Check construction stormwater, wastewater and water-quality approvals separately; this link does not cover every environmental permit.
- Florida — local government contacts (City & local): USAGov. Select your state in the national directory, then locate the responsible local government. Confirm municipal boundaries and any separate fire, drainage, water or other district authority.
Other states
How this list is made. Each link was found on the agency's own site and is re-checked by a script that loads it and records the date; a link that stops answering is shown without a link rather than dropped. Programs change with each legislative session: confirm fees, forms and thresholds on the agency page before filing. General information, not legal advice. How we check our data · Report an error.