Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Permits › Arizona

Arizona: every permit portal for solar, wind, and storage

Links checked October 24, 2026 · Official sites only · Pick another state

The quick find: which office handles each approval a utility-scale project touches in Arizona, with the agency's own page. Counties and cities add their own land-use approvals; the state table is the part that is the same across the state.

County-by-county detail for Arizona: proposed projects and contacts by county.

State and grid

ApprovalWhere to go
State siting or certificateWhether the state itself approves where a generating facility goes, or leaves it to counties and cities.Arizona Power Plant and Transmission Line Siting CommitteeArizona Corporation CommissionCertificate of Environmental Compatibility required for plants of 100 MW or more and 115 kV+ lines (A.R.S. 40-360). Program landing page; H1 'Arizona Power Plant and Transmission Line Siting Committee'. Old /line-siting-committee child page still appears in search results but 404s.
Grid interconnectionThe queue the project enters to connect: the regional grid operator, or the utility and public utility commission outside an RTO.FERC Generator InterconnectionsArizona Public ServiceAPS large generator interconnection process under its OATT; Arizona is outside an RTO.
Construction stormwater permitNPDES coverage for land disturbance of one acre or more, before earthwork starts.AZPDES Construction General Permit not script-checkableArizona Department of Environmental Quality · the agency's site blocks automated checks, so the link is as researched, not machine-confirmedAZPDES construction stormwater general permit and NOI filing for one acre or more of disturbance.
Historic preservation reviewSection 106 consultation through the State Historic Preservation Office when a federal permit, federal funding or federal land is involved; many states add their own review on state land.SHPO Consultation on Historic Preservation Compliance not script-checkableArizona State Historic Preservation Office · the agency's site blocks automated checks, so the link is as researched, not machine-confirmedSection 106 and State Historic Preservation Act project consultation procedures.
Wildlife and habitat reviewThe state wildlife agency's project screening or natural-heritage data request; federal species go through USFWS IPaC.Project Evaluation Program not script-checkableArizona Game and Fish Department · the agency's site blocks automated checks, so the link is as researched, not machine-confirmedAZGFD environmental review of proposed projects, including the Online Environmental Review Tool for heritage data screening.
State road access and utility permitsA driveway onto a state highway, and a gen-tie or cable in state right of way.Encroachment Permits not script-checkableArizona Department of Transportation · the agency's site blocks automated checks, so the link is as researched, not machine-confirmedADOT encroachment permits for driveways, access and utility installations in state highway right-of-way.
Floodplain (state NFIP coordinator)Local floodplain development permits are county or city; the state coordinator lists who administers them.Engineering Division (Flood Mitigation) not script-checkableArizona Department of Water Resources · the agency's site blocks automated checks, so the link is as researched, not machine-confirmedADWR Engineering Division houses the state floodplain management and NFIP coordination function.
Water rights and wellsConstruction water, dust control and O&M wells: the state engineer, water board or environmental agency.Wells not script-checkableArizona Department of Water Resources · the agency's site blocks automated checks, so the link is as researched, not machine-confirmedWell permitting and Notice of Intent to drill requirements for construction and operations water supply.
Property-tax incentive programState abatement or exemption programs for renewable generation, where one exists.Renewable Energy Equipment Property Tax FormArizona Department of RevenueCentrally valued renewable energy equipment is assessed at 20 percent of depreciated cost under A.R.S. 42-14155.

Federal portals (the same in every state)

ApprovalWhere to go
Clean Water Act Section 404 / Rivers and Harbors Act Section 10U.S. Army Corps of EngineersRegulatory Request System: applications, pre-application meetings and jurisdictional determinations; the district office is by watershed.
Endangered species and critical habitatU.S. Fish and Wildlife ServiceIPaC: official species list and the Section 7 consultation path for the project footprint.
Tall structures (wind turbines, met towers)Federal Aviation AdministrationForm 7460-1 notice through OE/AAA before construction above the 14 CFR 77.9 heights.
Construction stormwater where EPA is the permitting authorityU.S. EPAEPA's Construction General Permit (NeT eNOI) in New Mexico, Massachusetts, New Hampshire, D.C., Indian country and the territories.
Projects on federal landBureau of Land ManagementRight-of-way applications and NEPA documents for BLM-managed land.
Transmission and wholesale market rulesFederal Energy Regulatory CommissionOrder No. 2023 cluster-study reforms, followed by every FERC-jurisdictional transmission provider, RTO or utility; ERCOT has its own process.

County and city pages for Arizona

From the nationwide permit finder; counties and cities issue most land-use approvals, so start with the jurisdiction that covers the parcel.

Other states

How this list is made. Each link was found on the agency's own site and is re-checked by a script that loads it and records the date; a link that stops answering is shown without a link rather than dropped. Programs change with each legislative session: confirm fees, forms and thresholds on the agency page before filing. General information, not legal advice. How we check our data · Report an error.

Browse resources