Proposed projects11
Total capacity6,387MW
Signed agreements5of 11
New since August0requests

11 proposed energy projects from ERCOT's September 2026 report, plus who to call in Deaf Smith County and in TCEQ Region 1 before signing a solar, wind, or battery storage lease.

Check land in Deaf Smith CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Deaf Smith County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Deaf Smith County?

ERCOT's September 2026 interconnection report lists 11 proposed energy projects in Deaf Smith County (6 solar, 3 wind, 1 battery storage and 1 gas), about 6,387 MW in all. 5 of the 11 have a signed interconnection agreement.

What stands out in Deaf Smith County

By capacity, solar leads in Deaf Smith County with 3,164 MW across 6 projects, followed by wind (3 projects, 1,740 MW) and gas (1 project, 1,275 MW). The largest single project is Aurelius 3 Natural Gas, a 1,275 MW gas engines project listed under IP Roman III Gas, LLC, still in study, and its target online date is Jun 2030. Of the 11, 6 are still in ERCOT's study process and 5 have posted security or started construction. Every listed connection point is on the 345 kV system (why the voltage matters). The single most-used connection point is 23908 Deaf Smith station 345 kV, shared by 3 projects. IP Roman III, LLC and IP Roman, LLC are each listed on 2 projects; 9 different companies appear in all. Target online dates for the projects not yet running span Oct 2027 to Jun 2030. All of them fall in ERCOT's Panhandle load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Renegade ProjectTap 345kV 23910 Windmill - 23906 AJ SwopeRenegade Renewable LLCSolar515.7Jan 2028Under construction
Caliche Mound SolarMule Deer Switch 23921 (tap 345kV 23906 AJSwope - 23910 Windmill)CIG DS1 LLCSolar406.6Oct 2027Signed; security posted
Aurelius Solar23908 Deaf Smith station 345 kV · shared with 2 other requestsIP Roman, LLCSolar1,124.2Jun 2028Signed; security posted
Aurelius Wind23908 Deaf Smith station 345 kV · shared with 2 other requestsIP Roman Wind, LLCWind621.6Jun 2028Signed; security posted
Aurelius 2 Solar23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at... · shared with 1 other requestIP Roman, LLCSolar445.4Sep 2028Signed; security posted
Aurelius 2 Wind23908 Deaf Smith station 345kV · shared with 1 other requestIP Roman Wind II, LLCWind621.6Sep 2028In study
White Tail SolarTap 345kV Windmill (23910) – AJ Swope (23906)Mule Deer Solar LLCSolar226.8Dec 2028In study
BRP Hemera BESS345 kV Deaf Smith Substation (#23908, Oncor)BRP Hemera BESS LLCBattery storage (stand-alone)207.0Dec 2029In study
Aurelius 3 Natural Gas23908 Deaf Smith station 345 kV · shared with 2 other requestsIP Roman III Gas, LLCGas engines1,275.0Jun 2030In study
Aurelius 3 Solar23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at... · shared with 1 other requestIP Roman III, LLCSolar445.4Jun 2030In study
Aurelius 3 Wind23908 Deaf Smith station 345kV · shared with 1 other requestIP Roman III, LLCWind497.3Jun 2030In study

Crowded connection points in Deaf Smith County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Deaf Smith (23908) 345 kV 8 requests · 5,238 MW5 in study, 3 signed; security posted
  • Aurelius Solar 29INR0003 · Solar · 1,124 MW · Signed; security posted
  • Aurelius Wind 29INR0004 · Wind · 622 MW · Signed; security posted
  • Aurelius 2 Solar 29INR0009 · Solar · 445 MW · Signed; security posted
  • Aurelius 3 Natural Gas 29INR0361 · Gas engines · 1,275 MW · In study
  • Aurelius 2 Wind 29INR0010 · Wind · 622 MW · In study
  • Aurelius 3 Wind 29INR0012 · Wind · 497 MW · In study
  • Aurelius 3 Solar 29INR0011 · Solar · 445 MW · In study
  • BRP Hemera BESS 24INR0134 · Battery storage · 207 MW · In study
Aj Swope (23906) 345 kV 3 requests · 1,149 MW1 under construction, 1 signed; security posted, 1 in study
  • Renegade Project 20INR0255 · Solar · 516 MW · Under construction
  • Caliche Mound Solar 23INR0056 · Solar · 407 MW · Signed; security posted
  • White Tail Solar 24INR0200 · Solar · 227 MW · In study
Windmill (23910) 345 kV 5 requests · 2,066 MW · 2 in Deaf Smith County, 3 in Castro4 in study, 1 under construction
  • Renegade Project 20INR0255 · Solar · 516 MW · Under construction
  • Cavell Wind 29INR0035 · Wind · 641 MW · In study · Castro
  • Cavell Solar 29INR0034 · Solar · 502 MW · In study · Castro
  • White Tail Solar 24INR0200 · Solar · 227 MW · In study
  • Scarlet Solar 23INR0015 · Solar · 180 MW · In study · Castro
Mw Pun (1800) 345 kV 2 requests · 891 MW1 signed; security posted, 1 in study
  • Aurelius 2 Solar 29INR0009 · Solar · 445 MW · Signed; security posted
  • Aurelius 3 Solar 29INR0011 · Solar · 445 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Deaf Smith County

  • Deaf Smith County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 1, Amarillo: 5809 S. Western St., Ste 260, Amarillo TX 79110-3631, 806-353-9251; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Deaf Smith County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Deaf Smith County.

Permits and reviews for Deaf Smith County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Deaf Smith County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Deaf Smith County connects to the grid

Deaf Smith County is on the ERCOT grid. The projects listed above are in ERCOT's Panhandle load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Deaf Smith County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Deaf Smith County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 1

Armstrong · Briscoe · Carson · Castro · Childress · Collingsworth · Dallam · Donley · Gray · Hall · Hansford · Hartley · Hemphill · Hutchinson · Lipscomb · Moore · Ochiltree · Oldham · Parmer · Potter · Randall · Roberts · Sherman · Swisher · Wheeler

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources