Hutchinson County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects2
Total capacity565MW
Signed agreements2of 2
New since August0requests

2 proposed energy projects from ERCOT's September 2026 report, plus who to call in Hutchinson County and in TCEQ Region 1 before signing a solar, wind, or battery storage lease.

Check land in Hutchinson CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Hutchinson County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Hutchinson County?

ERCOT's September 2026 interconnection report lists 2 proposed energy projects in Hutchinson County (2 solar), about 565 MW in all. 2 of the 2 have a signed interconnection agreement.

What stands out in Hutchinson County

By capacity, solar leads in Hutchinson County with 565 MW across 2 projects. The largest single project is Panhandle Flagship Solar 2, a 304 MW solar project listed under Panhandle Solar Group Operating Company LLC, with an interconnection agreement signed in Aug 2025, and its target online date is Jun 2031. Of the 2, 2 have a signed interconnection agreement but no security posted yet. Every listed connection point is on the 345 kV system (why the voltage matters). The target online date reported for all of them is Jun 2031. All of them fall in ERCOT's Panhandle load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Panhandle Flagship Solar 2345 kV Railhead Substation (RAILHEAD #79005).Panhandle Solar Group Operating Company LLCSolar304.4Jun 2031Signed Aug 2025
Panhandle Flagship Solar 3345 kV Railhead Substation (RAILHEAD #79005).Station 3 (27INR0024)...Panhandle Solar Group Operating Company LLCSolar260.3Jun 2031Signed Aug 2025

Crowded connection points in Hutchinson County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Railhead (79005) 345 kV 5 requests · 1,982 MW · 2 in Hutchinson County, 3 in Carson5 signed
  • Kingsmill Wind SLF 27INR0140 · Wind · 606 MW · Signed Dec 2025 · Carson
  • Panhandle Flagship Solar 1 27INR0022 · Solar · 439 MW · Signed Aug 2025 · Carson
  • Panhandle Flagship Storage 27INR0025 · Battery storage · 372 MW · Signed Aug 2025 · Carson
  • Panhandle Flagship Solar 2 27INR0023 · Solar · 304 MW · Signed Aug 2025
  • Panhandle Flagship Solar 3 27INR0024 · Solar · 260 MW · Signed Aug 2025

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Hutchinson County

  • Hutchinson County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 1, Amarillo: 5809 S. Western St., Ste 260, Amarillo TX 79110-3631, 806-353-9251; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Hutchinson County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Hutchinson County.

Permits and reviews for Hutchinson County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Hutchinson County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Hutchinson County connects to the grid

Hutchinson County is on the ERCOT grid. The projects listed above are in ERCOT's Panhandle load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Hutchinson County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Hutchinson County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 1

Armstrong · Briscoe · Carson · Castro · Childress · Collingsworth · Dallam · Deaf Smith · Donley · Gray · Hall · Hansford · Hartley · Hemphill · Lipscomb · Moore · Ochiltree · Oldham · Parmer · Potter · Randall · Roberts · Sherman · Swisher · Wheeler

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources