Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Armstrong County

Armstrong County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects5
Total capacity3,252MW
Signed agreements1of 5
New since August0requests

5 proposed energy projects from ERCOT's September 2026 report, plus who to call in Armstrong County and in TCEQ Region 1 before signing a solar, wind, or battery storage lease.

Check land in Armstrong CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Armstrong County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Armstrong County?

ERCOT's September 2026 interconnection report lists 5 proposed energy projects in Armstrong County (1 solar, 3 wind and 1 battery storage), about 3,252 MW in all. 1 of the 5 has a signed interconnection agreement.

What stands out in Armstrong County

By capacity, wind leads in Armstrong County with 1,705 MW across 3 projects, followed by battery storage (1 project, 1,043 MW) and solar (1 project, 504 MW). The largest single project is Zeus Armstrong BESS, a 1,043 MW battery storage paired with solar project listed under Armstrong BESS, LLC, still in study, and its target online date is Apr 2028. Of the 5, 4 are still in ERCOT's study process and 1 has posted security or started construction. Every listed connection point is on the 345 kV system (why the voltage matters). Serenity Wind, LLC is listed on the most projects here (2 of 5); 4 different companies appear in all. Target online dates for the projects not yet running span Jun 2027 to Apr 2029. All of them fall in ERCOT's Panhandle load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Goodnight Wind IItap 345kV 23900 Alibates - 23914 Tule Canyon CKT2FGE Goodnight II, LLCWind261.1Jun 2027Signed; security posted
Zeus Armstrong BESSTap 345KV 23900 ALIBATES - 23914 TULECNYN CKT1 & CKT2Armstrong BESS, LLCBattery storage (paired with solar)1,043.1Apr 2028In study
Zeus Armstrong SolarTap 345KV 23900 AlLIBATES -23914 TULECNYNArmstrong Solar, LLCSolar503.6Apr 2028In study
Serenity Wind23931 MIDPOINT SWITCH 345 kVSerenity Wind, LLCWind473.0Sep 2028In study
Complex Serenity WindDouble tap 345 kV Alibates (bus# 23900) to Tule Canyon (bus# 23914)...Serenity Wind, LLCWind971.0Apr 2029In study

Crowded connection points in Armstrong County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Alibates (23900) 345 kV 9 requests · 5,267 MW · 4 in Armstrong County, 5 in Briscoe, Swisher, Carson8 in study, 1 signed; security posted
  • Goodnight Wind II 23INR0637 · Wind · 261 MW · Signed; security posted
  • Zeus Armstrong BESS 25INR0587 · Battery storage · 1,043 MW · In study
  • Complex Serenity Wind 28INR0215 · Wind · 971 MW · In study
  • Commodus 2 Wind 29INR0033 · Wind · 641 MW · In study · Swisher
  • Commodus Wind 29INR0031 · Wind · 641 MW · In study · Briscoe
  • Zeus Armstrong Solar 25INR0586 · Solar · 504 MW · In study
  • Commodus Solar 29INR0030 · Solar · 502 MW · In study · Briscoe
  • Commodus 2 Solar 29INR0032 · Solar · 502 MW · In study · Swisher
  • Kota Battery 23INR0283 · Battery storage · 201 MW · In study · Carson
Tule Canyon (23914) 345 kV 14 requests · 7,289 MW · 4 in Armstrong County, 10 in Briscoe, Swisher, Castro12 in study, 2 signed; security posted
  • Goodnight Wind II 23INR0637 · Wind · 261 MW · Signed; security posted
  • Nazareth Solar 16INR0049 · Solar · 203 MW · Signed; security posted · Castro
  • Zeus Armstrong BESS 25INR0587 · Battery storage · 1,043 MW · In study
  • Complex Serenity Wind 28INR0215 · Wind · 971 MW · In study
  • Commodus 2 Wind 29INR0033 · Wind · 641 MW · In study · Swisher
  • Commodus Wind 29INR0031 · Wind · 641 MW · In study · Briscoe
  • Frye Storage 22INR0402 · Battery storage · 504 MW · In study · Swisher
  • Zeus Armstrong Solar 25INR0586 · Solar · 504 MW · In study
  • Commodus Solar 29INR0030 · Solar · 502 MW · In study · Briscoe
  • Commodus 2 Solar 29INR0032 · Solar · 502 MW · In study · Swisher
  • Black Mountain Briscoe Gas 29INR0397 · Gas combined cycle · 495 MW · In study · Briscoe
  • BRP Snowdon BESS 23INR0330 · Battery storage · 411 MW · In study · Briscoe
  • Silverton Solar 28INR0023 · Solar · 410 MW · In study · Briscoe
  • Stem Solar 24INR0003 · Solar · 200 MW · In study · Swisher

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Armstrong County

  • Armstrong County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 1, Amarillo: 5809 S. Western St., Ste 260, Amarillo TX 79110-3631, 806-353-9251; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Armstrong County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Armstrong County.

Permits and reviews for Armstrong County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Armstrong County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Armstrong County connects to the grid

Armstrong County is on the ERCOT grid. The projects listed above are in ERCOT's Panhandle load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Armstrong County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Armstrong County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 1

Briscoe · Carson · Castro · Childress · Collingsworth · Dallam · Deaf Smith · Donley · Gray · Hall · Hansford · Hartley · Hemphill · Hutchinson · Lipscomb · Moore · Ochiltree · Oldham · Parmer · Potter · Randall · Roberts · Sherman · Swisher · Wheeler

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources