Proposed projects5
Total capacity2,314MW
Signed agreements1of 5
New since August0requests

5 proposed energy projects from ERCOT's September 2026 report, plus who to call in Hale County and in TCEQ Region 2 before signing a solar, wind, or battery storage lease.

Check land in Hale CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Hale County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Hale County?

ERCOT's September 2026 interconnection report lists 5 proposed energy projects in Hale County (1 solar, 2 battery storage and 2 gas), about 2,314 MW in all. 1 of the 5 has a signed interconnection agreement.

What stands out in Hale County

By capacity, gas leads in Hale County with 1,201 MW across 2 projects, followed by battery storage (2 projects, 602 MW) and solar (1 project, 512 MW). The largest single project is Black Mountain Hale Gas, a 991 MW gas combined cycle project listed under Fort Worth Power Core LLC, still in study, and its target online date is Apr 2030. Of the 5, 4 are still in ERCOT's study process and 1 has posted security or started construction. Every listed connection point is on the 345 kV system (why the voltage matters). Each of the 5 projects is listed under a different company. Target online dates for the projects not yet running span Feb 2027 to Apr 2030. All of them fall in ERCOT's Panhandle load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Elk Unit 4141607 AEEC_5Golden Spread Electric Cooperative, Inc.Gas turbine210.0Feb 2027Signed; security posted
Old Aqueduct Solar23920 Blackwater 345kV · shared with 1 other requestOld Aqueduct SolarSolar511.6Jun 2028In study
Old Aqueduct BESS II23920 BLKWTRDR_5 345kVTempus Power Management LLCBattery storage (paired with solar)301.0Mar 2030In study
Old Aqueduct Batt23920 Blackwater 345kV · shared with 1 other requestOld Aqueduct LLCBattery storage (paired with solar)301.0Mar 2030In study
Black Mountain Hale Gas345 kV Blackwater Draw Switch (#23920)Fort Worth Power Core LLCGas combined cycle990.6Apr 2030In study

Crowded connection points in Hale County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Blackwater (23920) 345 kV 4 requests · 2,104 MW4 in study
  • Black Mountain Hale Gas 29INR0175 · Gas combined cycle · 991 MW · In study
  • Old Aqueduct Solar 22INR0462 · Solar · 512 MW · In study
  • Old Aqueduct Batt 22INR0330 · Battery storage · 301 MW · In study
  • Old Aqueduct BESS II 28INR0498 · Battery storage · 301 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Hale County

  • Hale County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 2, Lubbock: 5012 50th St, Ste 100, Lubbock TX 79414-3426, 806-796-7092; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Hale County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Hale County.

Permits and reviews for Hale County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Hale County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Hale County connects to the grid

Hale County is on the ERCOT grid. The projects listed above are in ERCOT's Panhandle load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Hale County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Hale County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 2

Bailey · Cochran · Crosby · Dickens · Floyd · Garza · Hockley · King · Lamb · Lubbock · Lynn · Motley · Terry · Yoakum

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources