Motley County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
3 proposed energy projects from ERCOT's September 2026 report, plus who to call in Motley County and in TCEQ Region 2 before signing a solar, wind, or battery storage lease.
Check land in Motley CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Motley County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Motley County?
ERCOT's September 2026 interconnection report lists 3 proposed energy projects in Motley County (1 solar, 1 wind and 1 battery storage), about 852 MW in all. 1 of the 3 has a signed interconnection agreement, and 1 has been approved for energization or synchronization.
What stands out in Motley County
By capacity, wind leads in Motley County with 600 MW across 1 project, followed by solar (1 project, 252 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Sitges Wind, a 600 MW wind project listed under Whistling Flats Wind, LLC, still in study, and its target online date is Mar 2030. Of the 3, 2 are still in ERCOT's study process and 1 is approved for energization or synchronization. Every listed connection point is on the 345 kV system (why the voltage matters). Each of the 3 projects is listed under a different company. Target online dates for the projects not yet running span Jul 2029 to Mar 2030. All of them fall in ERCOT's Panhandle load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Buzios SolarTap between Cottonwood (#59904) and White River (#23922) | Roaring Springs Solar, LLC | Solar | 252.0 | Jul 2026 | Approved for synchronization |
| Buzios BESS SLFTap 345kV 59904 Cottonwood - 23922 White River Ckt 2 | Buzios Energy Storage, LLC | Battery storage (paired with solar) | Self-limiting | Jul 2029 | In study |
| Sitges WindTap 345kV 59904 Cottonwood–60500 Edith Clarke | Whistling Flats Wind, LLC | Wind | 600.0 | Mar 2030 | In study |
Crowded connection points in Motley County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Cottonwood (59904) 345 kV 16 requests · 3,924 MW · 3 in Motley County, 13 in Dickens, King, Cottle7 in study, 5 signed, 3 signed; security posted, 1 approved for synchronization
- Buzios Solar 24INR0399 · Solar · 252 MW · Approved for synchronization
- Bigway Solar II 27INR0128 · Solar · 206 MW · Signed; security posted · King
- Donegal Solar 23INR0089 · Solar · 202 MW · Signed; security posted · Dickens
- Bigway Solar I 27INR0127 · Solar · 195 MW · Signed; security posted · King
- Outrider BESS 28INR0288 · Battery storage · 302 MW · Signed Jun 2026 · Dickens
- Sanders Hollow Energy Center 28INR0169 · Wind · 293 MW · Signed Jun 2026 · Dickens
- Wake Wind Energy Repower 26INR0647 · Wind · 252 MW · Signed Feb 2014 · Crosby
- Wolf Spring Storage 25INR0173 · Battery storage · 203 MW · Signed Aug 2024 · Dickens
- Wolf Spring Solar 25INR0172 · Solar · 196 MW · Signed Aug 2024 · Dickens
- Sitges Wind 28INR0017 · Wind · 600 MW · In study
- CORUSCANT BESS 27INR0195 · Battery storage · 418 MW · In study · Dickens
- Soluce Cotton Solar 28INR0267 · Solar · 203 MW · In study · Cottle
- Soluce Cotton Storage 28INR0268 · Battery storage · 202 MW · In study · Cottle
- Timberlakes Solar 25INR0165 · Solar · 201 MW · In study · Dickens
- TEXAS SOLAR NOVA 3 22INR0215 · Solar · 200 MW · In study · Kent
- Buzios BESS SLF 29INR0021 · Battery storage · 0 MW · In study
White River (23922) 345 kV 4 requests · 650 MW · 2 in Motley County, 2 in Dickens2 signed, 1 approved for synchronization, 1 in study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Motley County
- Motley County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 2, Lubbock: 5012 50th St, Ste 100, Lubbock TX 79414-3426, 806-796-7092; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Motley County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Motley County.
Permits and reviews for Motley County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Motley County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Motley County connects to the grid
Motley County is on the ERCOT grid. The projects listed above are in ERCOT's Panhandle load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Motley County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Motley County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 2
Bailey · Cochran · Crosby · Dickens · Floyd · Garza · Hale · Hockley · King · Lamb · Lubbock · Lynn · Terry · Yoakum