Bastrop County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
12 proposed energy projects from ERCOT's September 2026 report, plus who to call in Bastrop County and in TCEQ Region 11 before signing a solar, wind, or battery storage lease.
Check land in Bastrop CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Bastrop County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Bastrop County?
ERCOT's September 2026 interconnection report lists 12 proposed energy projects in Bastrop County (2 solar, 3 battery storage and 7 gas), about 4,815 MW in all. 8 of the 12 have a signed interconnection agreement.
What stands out in Bastrop County
By capacity, gas leads in Bastrop County with 3,822 MW across 7 projects, followed by battery storage (3 projects, 730 MW) and solar (2 projects, 262 MW). The largest single project is Bastrop Peaking Generators (TEF-Due Diligence), a 1,104 MW gas turbine project listed under MPH Bastrop Peakers, LLC, with an interconnection agreement signed in Dec 2025, and its target online date is Dec 2027. Of the 12, 4 are still in ERCOT's study process and 8 have a signed interconnection agreement but no security posted yet. Connection points are mostly at 345 kV (6 projects) and 138 kV (4 projects) (why the voltage matters). The single most-used connection point is (#170174) LOST PINES 345 kV, shared by 3 projects. LCRA is listed on the most projects here (5 of 12); 8 different companies appear in all. Target online dates for the projects not yet running span Dec 2027 to Jun 2033. All of them fall in ERCOT's South load zone. 2 that were listed in August have since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Waterloo Solar 1Tap 345-kV 7040 Austrop to 7042 Zorn · shared with 1 other request | Waterloo Solar 1, LLC | Solar | 200.6 | Dec 2027 | Signed Sep 2024 |
| Bastrop Peaking Generators (TEF-Due Diligence)7048 L_GARFIE5_1Y 345kV | MPH Bastrop Peakers, LLC | Gas turbine | 1,104.0 | Dec 2027 | Signed Dec 2025 |
| Waterloo BESS 1Tap 345-kV 7040 Austrop to 7042 Zorn · shared with 1 other request | Waterloo BESS, LLC | Battery storage (paired with solar) | 120.0 | Dec 2028 | Signed Sep 2024 |
| Sim Gideon Combined Cycle(#7310) SIM GIDEON 138 kV · shared with 1 other request | LCRA | Gas combined cycle | 880.0 | Dec 2030 | Signed Dec 2025 |
| SIM GIDEON GAS RICE(#7310) SIM GIDEON 138 kV · shared with 1 other request | LCRA | Gas engines | 226.0 | May 2031 | Signed Dec 2025 |
| LOST PINES GAS RECIP(#170174) LOST PINES 345 kV · shared with 2 other requests | LCRA | Gas engines | 113.0 | Jun 2033 | Signed Dec 2025 |
| LOST PINES GAS RECIP PHASE 2(#170174) LOST PINES 345 kV · shared with 2 other requests | LCRA | Gas engines | 113.0 | Jun 2033 | Signed Dec 2025 |
| Lost Pines Power Park(#170174) LOST PINES 345 kV · shared with 2 other requests | LCRA | Gas combined cycle | 880.0 | Jun 2033 | Signed Dec 2025 |
| Little Star Solar#9043 CISTERN 345kV | RWE Clean Energy Development, LLC | Solar | 61.6 | Dec 2027 | In study |
| Techne BESS7560 RED ROCK 138kV | Techne BESS, LLC | Battery storage (stand-alone) | 202.7 | Dec 2028 | In study |
| Fort Worth Power Core Bastrop Gas PlantTap 345kV 7042 ZORN - 7040 AUSTROP | Fort Worth Power Core LLC | Gas combined cycle | 506.4 | Sep 2029 | In study |
| LUND STORAGE CENTER 1TAP 138 KV LINE AND CREATE NEW BUS BETWEEN | Lund Storage Center 1, LLC | Battery storage (stand-alone) | 407.6 | Oct 2029 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- Big Star Solar, solar, 203 MW (RWE Solar Development, LLC)
- Big Star Storage, battery storage, 80 MW (RWE Solar Development, LLC)
Crowded connection points in Bastrop County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Austrop (7040) 345 kV 10 requests · 2,624 MW · 3 in Bastrop County, 7 in Milam, Caldwell, Travis5 signed, 2 in study, 2 approved for synchronization, 1 signed; security posted
- Stoneridge Solar 24INR0031 · Solar · 202 MW · Approved for synchronization · Milam
- Stoneridge BESS 25INR0389 · Battery storage · 102 MW · Approved for synchronization · Milam
- Sandow Solar 22INR0350 · Solar · 287 MW · Signed; security posted · Milam
- SCHNEIDER COMBINED CYCLE 30INR0054 · Gas combined cycle · 880 MW · Signed Dec 2025 · Caldwell
- Waterloo Solar 1 25INR0422 · Solar · 201 MW · Signed Sep 2024
- Waterloo BESS 1 25INR0447 · Battery storage · 120 MW · Signed Sep 2024
- SCHNEIDER GAS RICE 29INR0176 · Gas engines · 113 MW · Signed Dec 2025 · Caldwell
- SCHNEIDER GAS RICE PHASE 2 31INR0013 · Gas engines · 113 MW · Signed Dec 2025 · Caldwell
- Fort Worth Power Core Bastrop Gas Plant 26INR0560 · Gas combined cycle · 506 MW · In study
- AP Greenport 23INR0474 · Battery storage · 100 MW · In study · Travis
Zorn (7042) 345 kV 14 requests · 4,993 MW · 3 in Bastrop County, 11 in Guadalupe, Caldwell9 in study, 5 signed
- SCHNEIDER COMBINED CYCLE 30INR0054 · Gas combined cycle · 880 MW · Signed Dec 2025 · Caldwell
- Waterloo Solar 1 25INR0422 · Solar · 201 MW · Signed Sep 2024
- Waterloo BESS 1 25INR0447 · Battery storage · 120 MW · Signed Sep 2024
- SCHNEIDER GAS RICE 29INR0176 · Gas engines · 113 MW · Signed Dec 2025 · Caldwell
- SCHNEIDER GAS RICE PHASE 2 31INR0013 · Gas engines · 113 MW · Signed Dec 2025 · Caldwell
- Fort Worth Power Core Bastrop Gas Plant 26INR0560 · Gas combined cycle · 506 MW · In study
- Bobcat Generating Station 29INR0340 · Gas engines · 450 MW · In study · Caldwell
- Big Watt Power Austin-1 29INR0167 · Gas combined cycle · 449 MW · In study · Caldwell
- Alpha Power Phase 1 28INR0532 · Gas turbine · 400 MW · In study · Guadalupe
- Alpha Power Phase 2 29INR0363 · Gas turbine · 400 MW · In study · Guadalupe
- Alpha Power Phase 3 30INR0143 · Gas turbine · 400 MW · In study · Guadalupe
- Alpha Power Phase 4 31INR0025 · Gas turbine · 400 MW · In study · Guadalupe
- Alpha Power Phase 5 32INR0007 · Gas turbine · 400 MW · In study · Guadalupe
- Aster Solar 24INR0115 · Solar · 160 MW · In study · Guadalupe
Bus 170174 (170174) 345 kV 3 requests · 1,106 MW3 signed
- Lost Pines Power Park 30INR0052 · Gas combined cycle · 880 MW · Signed Dec 2025
- LOST PINES GAS RECIP 29INR0166 · Gas engines · 113 MW · Signed Dec 2025
- LOST PINES GAS RECIP PHASE 2 31INR0010 · Gas engines · 113 MW · Signed Dec 2025
Bus 7310 (7310) 138 kV 2 requests · 1,106 MW2 signed
- Sim Gideon Combined Cycle 30INR0051 · Gas combined cycle · 880 MW · Signed Dec 2025
- SIM GIDEON GAS RICE 31INR0011 · Gas engines · 226 MW · Signed Dec 2025
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Bastrop County
- Bastrop County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 11, Austin: 12100 Park 35 Circle, Bldg A, Rm 179, Austin TX 78753, 512-339-2929; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Bastrop County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Bastrop County.
Permits and reviews for Bastrop County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Bastrop County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Bastrop County connects to the grid
Bastrop County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Bastrop County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Bastrop County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 11
Blanco · Burnet · Caldwell · Fayette · Hays · Lee · Llano · Travis · Williamson