Burnet County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects4
Total capacity395MW
Signed agreements2of 4
New since August0requests

4 proposed energy projects from ERCOT's September 2026 report, plus who to call in Burnet County and in TCEQ Region 11 before signing a solar, wind, or battery storage lease.

Check land in Burnet CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Burnet County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Burnet County?

ERCOT's September 2026 interconnection report lists 4 proposed energy projects in Burnet County (1 solar and 3 battery storage), about 395 MW in all. 2 of the 4 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.

What stands out in Burnet County

By capacity, battery storage leads in Burnet County with 312 MW across 3 projects, followed by solar (1 project, 83 MW). The largest single project is Backbone Creek BESS, a 124 MW stand-alone battery storage project listed under Backbone Creek BESS LLC, approved for synchronization, and its target online date is Dec 2026. Of the 4, 2 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 1 is approved for energization or synchronization. Every listed connection point is on the 138 kV system (why the voltage matters). Redsun Solar Project LLC is listed on the most projects here (2 of 4); 3 different companies appear in all. Target online dates for the projects not yet running span Nov 2027 to Aug 2028. All of them fall in ERCOT's South load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Backbone Creek BESS7351 STARCKE 138kVBackbone Creek BESS LLCBattery storage (stand-alone)124.1Dec 2026Approved for synchronization
RedSun SolarTap 138kV 7100 Burnet - 7529 BertramRedsun Solar Project LLCSolar82.5Aug 2028Signed Sep 2025
Mineral Springs BESS7065 DOBVI 138kVBurnet County LLCBattery storage (stand-alone)104.0Nov 2027In study
RedSun BESSExisting Line from Substation Name: Burnet (PSSE#7100) to Substatio...Redsun Solar Project LLCBattery storage (paired with solar)84.0Aug 2028In study

Crowded connection points in Burnet County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Burnet (7100) 138 kV 2 requests · 167 MW1 signed, 1 in study
  • RedSun Solar 27INR0124 · Solar · 83 MW · Signed Sep 2025
  • RedSun BESS 27INR0125 · Battery storage · 84 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Burnet County

  • Burnet County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 11, Austin: 12100 Park 35 Circle, Bldg A, Rm 179, Austin TX 78753, 512-339-2929; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Burnet County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Burnet County.

Permits and reviews for Burnet County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Burnet County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Burnet County connects to the grid

Burnet County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Burnet County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Burnet County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 11

Bastrop · Blanco · Caldwell · Fayette · Hays · Lee · Llano · Travis · Williamson

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.