Angelina County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
5 proposed energy projects from ERCOT's September 2026 report, plus who to call in Angelina County and in TCEQ Region 10 before signing a solar, wind, or battery storage lease.
Check land in Angelina CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Angelina County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Angelina County?
ERCOT's September 2026 interconnection report lists 5 proposed energy projects in Angelina County (1 solar, 2 battery storage and 2 gas), about 1,708 MW in all. 1 of the 5 has a signed interconnection agreement, and 1 has been approved for energization or synchronization.
What stands out in Angelina County
By capacity, gas leads in Angelina County with 1,200 MW across 2 projects, followed by battery storage (2 projects, 327 MW) and solar (1 project, 181 MW). The largest single project is Longleaf Power Station, a 600 MW gas turbine project listed under WattBridge Texas Holdings, LLC, still in study, and its target online date is Mar 2029. Of the 5, 4 are still in ERCOT's study process and 1 is approved for energization or synchronization. Connection points are mostly at 138 kV (3 projects) and 345 kV (1 project) (why the voltage matters). WattBridge Texas Holdings, LLC is listed on the most projects here (2 of 5); 4 different companies appear in all. Target online dates for the projects not yet running span Aug 2027 to Jul 2030. All of them fall in ERCOT's North load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Azalea Springs Solartap 138kV Jim English – Lufkin Chipper Mill | AZALEA SPRINGS SOLAR PARK LLC | Solar | 181.0 | Nov 2026 | Approved for synchronization |
| Solar Star North Herty Storage3307 Redland Switch 138 kV | Solar Star North Herty Storage, LLC | Battery storage (stand-alone) | 125.9 | Aug 2027 | In study |
| Sun Angel ESSTap 138kV LUFKINE East (#3326) - HERTY TAP (#3318) | Sun Angel ESS LLC | Battery storage (stand-alone) | 201.5 | Sep 2028 | In study |
| Longleaf Power StationRedland Substation (# 3321) | WattBridge Texas Holdings, LLC | Gas turbine | 600.0 | Mar 2029 | In study |
| Longleaf II Power Station3321 Redland 345 kV | WattBridge Texas Holdings, LLC | Gas turbine | 600.0 | Jul 2030 | In study |
Crowded connection points in Angelina County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Redland (3321) 345 kV 2 requests · 1,200 MW2 in study
- Longleaf Power Station 26INR0294 · Gas turbine · 600 MW · In study
- Longleaf II Power Station 30INR0114 · Gas turbine · 600 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Angelina County
- Angelina County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 10, Beaumont: 3870 Eastex Fwy, Beaumont TX 77703-1830, 409-898-3838; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Angelina County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Angelina County.
Permits and reviews for Angelina County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Angelina County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Angelina County connects to the grid
Angelina County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Angelina County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Angelina County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 10
Hardin · Houston · Jasper · Jefferson · Nacogdoches · Newton · Orange · Polk · Sabine · San Augustine · San Jacinto · Shelby · Trinity · Tyler