Energy land, checked. Solar, wind, and storage sites — the permits and the grid in one place. Start here →Queue data: ERCOT, September 2026 · Outage data: EIA-861, 2025
Parcel & Grid

Home › Guides › How to apply

How to get a well permit from a groundwater conservation district

Updated

General information, not a substitute for the advice of an attorney.

Who grants it: The groundwater conservation district covering the parcel (the report names it, or says none covers the county).

When it applies: Drilling a new well, or increasing production from an existing one, inside a district (Water Code chapter 36). Outside a district, state well-driller rules still apply through TDLR.

What the application asks for, and where to find it

The application asks forWhere you find itHow
Well location and parcelThis site: the land reportThe land report: coordinates, and the property ID from the Lease page.
Proposed use and volumeYour engineerConstruction water (dust, concrete) and O&M needs; the district sets production limits by acreage or aquifer.
Aquifer, depth and casing planYour engineerFrom the licensed driller; the district's rules name the aquifers it manages.
Owner of the surface and of the groundwaterThe landownerGroundwater can be severed from the surface; ask the owner and check the title commitment (the report's Lease page lists it under "Ask the owner").
Spacing from neighbouring wellsThe agency's websiteThe district's rules and its well database; the district tells you the spacing rule.
Applicant details and driller licenceYou (the applicant)Your entity and the driller's TDLR licence number.
What the "where you find it" column means
This site: the land report
Run the spot on the land report; the value is on the page named, with its agency source.
Appraisal district (tax assessor)
The county appraisal district record: property ID, legal description, acreage, owner of record, agricultural valuation. The report's Lease page links it; the Permits page lists the district's phone.
The landowner
Only the owner can supply it: signed authorization, deed reference, existing leases, access, their contact details.
Your engineer
From your civil or electrical engineer: site plan, disturbed acreage, drainage, the electrical one-line, nameplate and inverter data, structure heights.
Surveyor or title company
Boundary survey, legal description for recording, easements of record, title commitment.
The agency's website
The agency publishes it: forms, fee schedules, community numbers, district offices, portal accounts.
You (the applicant)
Your entity details: legal name, address, signatory, contacts, FEIN, insurance.

How to file it

  1. Find the district with the TWDB district list; the report's Permits page links the district's own page.
  2. Read the district rules (spacing, production, metering) and request the permit application.
  3. File with the well plan; most districts hear new production permits at a board meeting.
  4. Meter and report as the permit says.

The pages you will use

Open: TWDB groundwater conservation districts →
TWDB groundwater conservation districts (screenshot captured monthly from the agency page)
Open: Water Code chapter 36 →
Water Code chapter 36 (screenshot captured monthly from the agency page)

Official pages cited

How-to guidance from the agency pages linked above, not legal advice; forms, fees and offices change, so confirm with the office before filing. The land report fills in the site facts; the rest comes from the sources named in each row.

General information from the sources linked above, not legal, tax, or financial advice.

Sources and helpful links

More official contacts and resources: Helpful links.

Browse resources