Energy land, checked. Solar, wind, and storage sites — the permits and the grid in one place. Start here →Queue data: ERCOT, September 2026 · Outage data: EIA-861, 2025
Parcel & Grid

Home › Guides › How to apply

How to file FAA Form 7460-1 (notice of proposed construction)

Updated

General information, not a substitute for the advice of an attorney.

Who grants it: Federal Aviation Administration, Obstruction Evaluation / Airport Airspace Analysis, filed online.

When it applies: Any structure more than 200 ft above ground, or lower structures near airports under the slopes in 14 CFR 77.9. Wind turbines and met towers always file; solar near an airport may also need a glare analysis.

What the application asks for, and where to find it

The application asks forWhere you find itHow
Latitude, longitude and ground elevation of each structureYour engineerPer-structure coordinates from the layout; the report gives the site coordinates and USGS ground elevation for the spot.
Structure height above ground and overall heightYour engineerTip height for turbines, mast height for met towers, from the equipment data.
Structure type, marking and lighting proposedYour engineerFrom the turbine supplier and the lighting plan.
Nearest airport and distanceThe agency's websiteOE/AAA computes it from the coordinates once entered.
Sponsor (filer) detailsYou (the applicant)Your entity and contact; one account can file many structures.
What the "where you find it" column means
This site: the land report
Run the spot on the land report; the value is on the page named, with its agency source.
Appraisal district (tax assessor)
The county appraisal district record: property ID, legal description, acreage, owner of record, agricultural valuation. The report's Lease page links it; the Permits page lists the district's phone.
The landowner
Only the owner can supply it: signed authorization, deed reference, existing leases, access, their contact details.
Your engineer
From your civil or electrical engineer: site plan, disturbed acreage, drainage, the electrical one-line, nameplate and inverter data, structure heights.
Surveyor or title company
Boundary survey, legal description for recording, easements of record, title commitment.
The agency's website
The agency publishes it: forms, fee schedules, community numbers, district offices, portal accounts.
You (the applicant)
Your entity details: legal name, address, signatory, contacts, FEIN, insurance.

How to file it

  1. Create an account at FAA OE/AAA and start a Form 7460-1 for each structure (or a bulk upload for a wind farm).
  2. Check the notice criteria in 14 CFR 77.9 to confirm which structures must file.
  3. Submit; the FAA issues a determination (no hazard, with conditions such as lighting, or a hazard finding) that the lease and financing rely on.
  4. File the Form 7460-2 supplemental notice before and after construction as the determination requires.

The pages you will use

Open: FAA OE/AAA →
FAA OE/AAA (screenshot captured monthly from the agency page)
Open: 14 CFR 77.9 →
14 CFR 77.9 (screenshot captured monthly from the agency page)

Official pages cited

How-to guidance from the agency pages linked above, not legal advice; forms, fees and offices change, so confirm with the office before filing. The land report fills in the site facts; the rest comes from the sources named in each row.

General information from the sources linked above, not legal, tax, or financial advice.

Sources and helpful links

More official contacts and resources: Helpful links.

Browse resources