November 2026: 1 new request (135 MW), 5 withdrawals (701 MW). 1,081 active requests, 250 GW.

New requests1135 MW
Withdrawn5701 MW
Net capacity−566 MWthis month
Active queue1,081250 GW requested

The month in numbers

From MISO's queue as of November 3, 2026, with new and withdrawn requests taken from the 31 days before that date: 1 new request (135 MW) and 5 withdrawn (701 MW), net −566 MW. The active queue holds 1,081 requests for 250 GW (MISO interactive queue).

New requests by type: 1 not listed. Withdrawn by type: 5 solar. States with the most new requests: not listed (1). A request is a study position, not a project; most requests in any queue are withdrawn before construction. MISO accepts new requests in annual application windows, so most months show few new entries while withdrawals happen year-round (MISO generator interconnection).

New requests

The one request that entered MISO's queue, as MISO lists it. County and state are blank on many new requests until the study cycle begins.

Request · point of interconnection · transmission ownerCountyTypeMWRequested in-service
J4434POI not listed · DUKE ENERGY INDIANA, LLC CINnot listed yetNot listed1352031-10

Withdrawn

All 5 requests MISO marks withdrawn this month. MISO does not publish the reason.

Request · point of interconnection · transmission ownerCountyTypeMWStage
J1780POI not listed · DUKE ENERGY INDIANA, LLC CINMontgomery County, INSolar200GIA
J3144Edwardsport IGCC - Amo 345.0kV · DUKE ENERGY INDIANA, LLC CINPutnam County, INSolar150Phase 3
J3145Edwardsport IGCC - Amo 345.0kV · DUKE ENERGY INDIANA, LLC CINPutnam County, INSolar150Phase 3
J926Pine Lake - Apple River 161 kV Line · NORTHERN STATES POWER COMPANYSt. Croix County, WISolar101GIA: Under Construction
J1657Pine Lake to Apple River 161 kV · NORTHERN STATES POWER COMPANYSt. Croix County, WISolar100GIA

The active queue

1,081 active requests as of November 3, 2026. MISO groups studies by region (its study groups) and runs them in annual cycles; the phase column is MISO's own label.

By state

StateRequestsMWGW
Not listed30989,14589.1
IL17332,79832.8
MI16432,69032.7
MN9317,02817.0
IN6914,64214.6
IA6313,19713.2
WI5912,68512.7
LA379,5179.5
AR348,8048.8
MO287,9287.9
MS142,1322.1
SD134,0564.1
ND122,1752.2
TX102,5602.6
KY32750.3

By MISO study region

Study groupRequestsMW
Central34183,728
West23857,406
East (ITC)15633,538
South12340,887
Not listed11115,061
East (ATC)5714,804
NO_GROUP504,209
NA50

By type

TypeRequestsMWShare of MW
Not listed36497,37839%
Solar25647,69119%
Storage22240,63916%
Wind12124,54710%
Hybrid6111,7595%
Gas4325,40010%
Nuclear82,1701%
Waste Heat Recovery280%
Diesel1180%
Hydro130%
Biomass100%
Compressed Air Storage1200%

By stage

Stage (as MISO lists it)Requests
DPP-2026325
Phase 3223
Phase 2205
Phase 1113
Queued111
NO_CYCLE50
Post-Phase 347
0MW GIA5
GIA: Under Construction1
ERAS Study Cycle 21

Crowded points of interconnection

Points of interconnection named by the most active requests, matched on the text MISO lists (different spellings of one substation count separately).

Point of interconnection (as listed)StateRequestsMW
Other_IL173,452
Other_MI114,417
Cedar Mountain - Lyon County 345.0kVMN71,756
7FARGO - 7SANDBURG 345.0kVIL61,650
Petersburg - Sullivan (AEP/PJM) 345.0kVIN51,840
Other_MO51,200
Other_IN41,175
ALEXANDRIA - BISON 345.0kVMN41,120
RisingIL4691
Duane Arnold (ARNOLD 5)IA4615

Schedules slipping

300 active requests (45.3 GW) carry a requested in-service date that has already passed without an in-service status; MISO keeps the developer's last entered date until it is changed. Most in: MI (68), IL (56), MN (31), WI (27), IN (24), IA (24).

How the counts are made

Every row comes from MISO's interactive generator interconnection queue, read on November 3, 2026. This is the first issue, so new and withdrawn requests are those whose MISO queue date or withdrawal date falls in the 31 days before the snapshot; from the next issue on, changes are the differences between two monthly snapshots matched by project number. MW is MISO's summer net MW. MISO publishes no coordinates; county and state are as the developer entered them. The generator interconnection process is described on MISO's site. This brief reports changes; it takes no position on any project or company and is not advice.